Skip to main content
4,573 tracked

Entities

Registers of the facilities, companies and countries on record, with the ownership chains between them.

710 of 4,257 facility records carry an operational measure

4,257 facility records are individually browsable here, of which 710 carry an operational measure: power, GPU or FLOP capacity, or a substantive description. The other 3,547 establish that a site exists and stop there. Which of the two a record is depends almost entirely on the catalogue it arrived in.

Two counts on this page

Two counts appear on this page and they are not the same quantity. The masthead stamps 4,573 tracked records: the full corpus across 110 countries, the figure used site-wide. The register and the plate count the 4,257 that are individually browsable; the 316 in between are rows a licensing term keeps from being served as their own record. They inform aggregates and they are not hidden. They cannot be opened, so a figure about what a reader can inspect must not count them. The same universe is plotted in space on the map, rolled up by jurisdiction on Countries, and the organisations that own and operate these sites are in the company register.

  1. Epoch AI Frontier Data Centers7064 measured91.4%
  2. Epoch AI GPU Clusters437397 measured90.8%
  3. PeeringDB facility registry1,56963 measured4.0%
  4. IM3 / PNNL data-center corpus3912 measured0.5%
  5. OpenStreetMap (tagged data centers)1,1731 measured0.1%
  6. OpenStreetMap2310 measured0.0%
  7. Microsoft Azure region documentation560 measured0.0%
  8. Oracle Cloud region documentation450 measured0.0%
  9. 43 smaller catalogues285183 measured64.2%
Coverage by catalogue. Each band is one catalogue: its length is that catalogue’s share of the largest one’s row count, and the inked run inside it is the rows carrying at least one operational measure (power, GPU or FLOP capacity, or a substantive description). Nothing here is schematic; both lengths are measured proportions of the counts printed beside them. No share-of-megawatts is drawn: every megawatt-bearing row satisfies the measured predicate by construction, so a capacity share would be a tautology. Counts cover the full individually-browsable set, 4,257 rows, read 25 August 2026. The smallest catalogues are folded into one band whose run is hatched, because it averages catalogues of both kinds. Each named catalogue’s key opens the register below scoped to its rows.

Epoch AI Frontier Data Centers runs 91.4% measured across 70 records; OpenStreetMap runs 0.0% across 231. No single catalogue falls in between; the hatched band does, but it is the fold of 43 smaller catalogues and reads mid-scale only because it averages the two kinds. The separation exists because the two kinds of catalogue do different jobs: one is a research dataset built by measuring sites, the other an infrastructure registry built by recording that they exist. Any band’s key below opens the register scoped to that catalogue’s rows.

This is why the register opens on the measured cohort and says so; shown whole, most of the 4,257 rows could not answer the question a reader arrived with. The positional records are not filler: a site that exists is a real fact, and for a governance reader tracing where capacity might appear it is often the fact that matters. But it is a different fact from a megawatt figure, and a register that prints them in one undifferentiated count makes a uniformity claim its records do not support.

The register

Showing all 4,257 records, including the 3,547 positional ones with no capacity figure attached. Show only the 710 measured.

751800 of 4,257Page 16 of 86
FacilityCountryTypeStatusPower (MW)
Tesla Dojo 1 Planned Phase 2Epoch AI GPU ClustersUSAI trainingAnnounced
Voltage Park Texas Phase 1Epoch AI GPU ClustersUSAI trainingOperational
X/xAI Hillsboro OregonEpoch AI GPU ClustersUSAI trainingAnnounced
xAI Colossus 2 Memphis Phase 1Epoch AI GPU ClustersUSAI trainingAnnounced
xAI Colossus 2 Memphis Phase 2Epoch AI GPU ClustersUSAI trainingAnnounced
xAI Colossus Memphis Phase 1Epoch AI GPU ClustersUSAI trainingOperational
xAI Colossus Memphis Phase 2Epoch AI GPU ClustersUSAI trainingOperational
xAI Colossus Memphis Phase 3Epoch AI GPU ClustersUSAI trainingOperational
Yotta Shakti Cloud NM1 Phase 1Epoch AI GPU ClustersINAI trainingOperational
GoodnightEpoch AI Frontier Data CentersUSAI trainingUnder construction
Google Cedar RapidsEpoch AI Frontier Data CentersUSAI trainingUnder construction
Google Fort WayneEpoch AI Frontier Data CentersUSAI trainingUnder construction
Google Kansas City EastEpoch AI Frontier Data CentersUSAI trainingAnnounced
Meta AikenEpoch AI Frontier Data CentersUSAI trainingUnder construction
Meta CheyenneEpoch AI Frontier Data CentersUSAI trainingUnder construction
Meta HyperionEpoch AI Frontier Data CentersUSAI trainingUnder construction
Meta SarpyEpoch AI Frontier Data CentersUSAI trainingUnder construction
OpenAI Stargate AbileneEpoch AI Frontier Data CentersUSAI trainingOperational
OpenAI Stargate LordstownEpoch AI Frontier Data CentersUSAI trainingUnder construction
OpenAI Stargate MichiganEpoch AI Frontier Data CentersUSAI trainingAnnounced
OpenAI Stargate MilamEpoch AI Frontier Data CentersUSAI trainingAnnounced
OpenAI Stargate New MexicoEpoch AI Frontier Data CentersUSAI trainingAnnounced
OpenAI Stargate ShackelfordEpoch AI Frontier Data CentersUSAI trainingUnder construction
OpenAI Stargate UAEEpoch AI Frontier Data CentersAEAI trainingUnder construction
OpenAI Stargate WisconsinEpoch AI Frontier Data CentersUSAI trainingAnnounced
QTS Cedar RapidsEpoch AI Frontier Data CentersUSAI trainingUnder construction
Equinix DC16 (Ashburn)Equinix SEC 10-K (2024)USColocationUnder construction
Equinix DC2 (Ashburn redevelopment)Equinix SEC 10-K (2024)USColocationUnder construction
Equinix DC22 (Ashburn)Equinix SEC 10-K (2024)USColocationUnder construction
Equinix FR13 (Frankfurt)Equinix SEC 10-K (2024)DEColocationUnder construction
Equinix FR8 (Frankfurt)Equinix SEC 10-K (2024)DEColocationUnder construction
Equinix LD10 (London / Slough)Equinix SEC 10-K (2024)GBColocationUnder construction
Equinix LD14 (London)Equinix SEC 10-K (2024)GBColocationUnder construction
Equinix MB3 (Mumbai)Equinix SEC 10-K (2024)INColocationUnder construction
Equinix MD5 (Madrid)Equinix SEC 10-K (2024)ESColocationUnder construction
Equinix NY11 (Secaucus)Equinix SEC 10-K (2024)USColocationUnder construction
Equinix NY3 (New York)Equinix SEC 10-K (2024)USColocationUnder construction
Equinix PA14 (Paris)Equinix SEC 10-K (2024)FRColocationUnder construction
Equinix SG6 (Singapore)Equinix SEC 10-K (2024)SGColocationUnder construction
Equinix SV18 (Silicon Valley)Equinix SEC 10-K (2024)USColocationUnder construction
Equinix TY11 (Tokyo)Company disclosure (press / IR)JPColocationOperational
Equinix TY15 (Tokyo)Equinix SEC 10-K (2024)JPColocationUnder construction
ESMC Dresden FabEuropean Commission decisionDELogic fabUnder construction
Alice Recoque (EuroHPC)EuroHPC Joint UndertakingFRHPC centerAnnounced
Arrhenius (EuroHPC)EuroHPC Joint UndertakingSEHPC centerUnder construction
Daedalus / Pharos AI Factory (EuroHPC)EuroHPC Joint UndertakingGRHPC centerUnder construction
Deucalion (EuroHPC)EuroHPC Joint UndertakingPTHPC centerOperational
Discoverer (EuroHPC)EuroHPC Joint UndertakingBGHPC centerOperational
JUPITER (EuroHPC)EuroHPC Joint UndertakingDEHPC centerOperational
Karolina (EuroHPC)EuroHPC Joint UndertakingCZHPC centerOperational