Skip to main content

xAI Colossus Memphis Phase 1

TypeAI TrainingStatusOperationalWhereMemphis, USIndexed fromEpoch AI GPU Clusters

Operational; xAI is recorded as owning the AI hardware inside this site

1/3site roles identified0 site relationships1 finding in the company chain0 export-control designationsFurthest finding: company at site

Date in site records: Sep 2, 2024. Site data: Epoch AI GPU Clusters.

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · data to Sep 2, 2024 (derived)

AI hardware owner · per catalog

xAI 1 recorded parent level 1 finding

Recorded parent Parent company

Which organisation owns the AI hardware inside it?

xAI Colossus Memphis Phase 1Site

AI hardware owner · per catalog xAI. Epoch AI's field for who owns the AI hardware, which it defines as not necessarily the owner or operator of the facility. source

Companies are grouped by their role at the site, with recorded parents above them. Record source: Epoch AI GPU Clusters; authority tier 2. Each role is drawn only as the relationship its own source establishes, listed above; none implies exclusive control of the full site. Ticks count the export-control and government-link findings for each company.

Export controls and government links

No export-control designations were found in the checked company chains.

Plate III. Export controls and government linksscrutica.com · data to Sep 2, 2024 (derived)
site1A company in the ownership chain is headquartered in the United States2company levels
Company at site

Headquarters jurisdiction
A company in the ownership chain is headquartered in the United States

United States: Operates the Export Administration Regulations (EAR) and the BIS Entity List under 15 CFR 730–774; deemed-export rules extend reach to foreign nationals on US soil. Export-control regimes listed for this jurisdiction: Wassenaar Arrangement, US EAR (BIS Entity List authority).

Country is the recorded headquarters location.Linked through the company recorded as owning the AI hardware inside this site.

Triangle: export-control designation or regulatory flag. Square: sovereign capital linkage. Circle: headquarters jurisdiction. Level 1 is a company at the site; higher levels are its parents. 1 finding is recorded; 0 are export-control designations.

Capacity

Reading. Power and acceleratorsscrutica.com · data to Sep 2, 2024 (derived)
150 MW

Facility power

Excluded from totals to avoid counting this campus twice; the total uses Colossus 1.

not recorded

Power for IT equipment

100,000

Accelerators

100,000 H100-equivalent. Not operating capacity: earlier phase of an operating cluster.

Present inventory by partition

100,000 accelerators across 1 admitted partition; theoretical dense FP16 peak 98,950 PFLOP/s.

  1. 100,000 × NVIDIA H100 SXM5 80GB

    installed (from the facility status)

    989.5 TFLOP/s dense FP16 per accelerator · partition peak 98,950 PFLOP/s · rate citation

    Catalogue row; no partition-level source recorded

Every partition is admitted from the record’s own evidence. Rates are the cited dense FP16 figure per accelerator; the sum applies the methodology’s utilization and interconnect assumptions and is a theoretical aggregate, not one job’s throughput. The catalogue figures above are the record’s scalar fields (the source’s transcription, or its recorded correction) and are a different basis.

xAI Colossus 1 (Memphis) has 4 records, and their power figures are never added together. Across the platform, recorded totals count the marked figure once; operating totals count a member’s figure only if it is operating capacity.

Scope: site total · Status: operational · counted in recorded totals

Colossus 1

425 MW · operating capacity · Epoch AI Frontier Data Centers

Scope: named cluster (phase 1) · Status: operational

xAI Colossus Memphis Phase 1

150 MW · not operating capacity (earlier phase of an operating cluster) · Epoch AI GPU Clusters

Scope: named cluster (phase 2) · Status: operational

xAI Colossus Memphis Phase 2

280 MW · not operating capacity (earlier phase of an operating cluster) · Epoch AI GPU Clusters

Scope: named cluster (phase 3) · Status: operational

xAI Colossus Memphis Phase 3

352 MW · operating capacity · Epoch AI GPU Clusters

Data quality · 1 flag
  • Any power figure on this record is excluded from power totals to avoid counting overlapping campus capacity twice.
    Curator’s working note

    Part of campus xAI Colossus 1 (Memphis). This row's power capacity is withheld from aggregates; the campus canonical power figure lives on Colossus 1. See the campus source-disagreement panel for every cited figure.

Methods and sources

Ownership roles

Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility.

Each role requires its own attribution. An operator named in a source supplies evidence of operation only.

Parent companies

Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented.

Level 1 identifies a company at the site, level 2 its parent, and each further level another parent. Export-control designations and government investments are assigned to the company concerned.

Missing values

Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits

Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld.

Epoch AI estimates capacity using satellite imagery, permits and corporate disclosures. Its catalog is the source for this site record.

Curator’s note on this campus

Four Epoch records describe xAI’s first Memphis site and its cluster phases. Power totals use Epoch’s site estimate. Phase figures of 150, 280.28 and 352.35 MW remain visible but are excluded from power totals. Epoch’s GPU-clusters data marks phase 1 as superseded by phase 2 and phase 2 by phase 3, so operating accelerator totals count the cluster once, at phase 3.

Browse the facilities directory or search the company directory.