Japan Earthquake

The M9 Nankai Trough case selects 4 locations: Kioxia Yokkaichi, Tokyo Electron, Advantest and SCREEN.

The circle illustrates a chosen radius and calculates no ground motion. Site selection is authored, so a pale site can sit inside it. The percentage is assumed severity; production loss is not calculated.

SK Hynix M16 (Icheon)SK Hynix M15X (Icheon)SK Hynix CheongjuSamsung Pyeongtaek P1-P4Samsung HwaseongMicron Hiroshima (formerly Elpida)Kioxia Yokkaichi (Y6/Y7)Kioxia Kitakami (K1)Shin-Etsu ShirakawaSUMCO Saga/ImariTokyo Electron HQ & FabAdvantest HQSCREEN Holdings (Kyoto)
SK Hynix and
Samsung Electronics, 5 sites
JapanSouth Korea

Sites

The inventory includes equipment-company headquarters as well as production sites; a company’s headquarters cannot locate all of its manufacturing capacity.

An earthquake that interrupts Japanese wafer or equipment production could also affect memory fabs abroad.

These cases pair selected disruption sites with supplier market shares to examine that exposure. The Korean assessment considers how shortages of Japanese inputs could affect production as inventories deplete; the available data give no inventory durations.

Selected in this case, 4

Semiconductor sites
BiCS Flash (162-layer, 218-layer), 3D NAND for SSDsYokkaichi, Mie PrefectureBiCS Flash (162-layer, 218-layer), 3D NAND for SSDs
Coater/developers, Etch systems, Deposition systems, Cleaning equipmentMinato-ku, TokyoCoater/developers, Etch systems, Deposition systems, Cleaning equipment
Semiconductor test systems (SoC, memory), HBM test solutionsChiyoda-ku, TokyoSemiconductor test systems (SoC, memory), HBM test solutions
Wafer cleaning equipment, Coater/developersKyotoWafer cleaning equipment, Coater/developers
All 13 sites, 8 in Japan and 5 in South Korea
Semiconductor sites
HBM3E, HBM4 (ramp)Icheon, Gyeonggi-doHBM3E, HBM4 (ramp)
DDR5, LPDDR5XIcheon, Gyeonggi-doDDR5, LPDDR5X
HBM3E packaging, DRAM packagingCheongju, Chungcheongbuk-doHBM3E packaging, DRAM packaging
DDR5, LPDDR5X, HBM3E, V-NAND (P3/P4)Pyeongtaek, Gyeonggi-doDDR5, LPDDR5X, HBM3E, V-NAND (P3/P4)
DDR5, LPDDR5, Legacy DRAMHwaseong, Gyeonggi-doDDR5, LPDDR5, Legacy DRAM
DDR5, LPDDR5X, HBM3E wafersHigashihiroshima, HiroshimaDDR5, LPDDR5X, HBM3E wafers
BiCS Flash (162-layer, 218-layer), 3D NAND for SSDsYokkaichi, Mie PrefectureBiCS Flash (162-layer, 218-layer), 3D NAND for SSDs
Next-gen BiCS Flash, 3D NANDKitakami, Iwate PrefectureNext-gen BiCS Flash, 3D NAND
300mm silicon wafers, SOI wafersShirakawa, Fukushima Prefecture300mm silicon wafers, SOI wafers
300mm silicon wafers, Epitaxial wafersSaga / Imari, Saga Prefecture300mm silicon wafers, Epitaxial wafers
Coater/developers, Etch systems, Deposition systems, Cleaning equipmentMinato-ku, TokyoCoater/developers, Etch systems, Deposition systems, Cleaning equipment
Semiconductor test systems (SoC, memory), HBM test solutionsChiyoda-ku, TokyoSemiconductor test systems (SoC, memory), HBM test solutions
Wafer cleaning equipment, Coater/developersKyotoWafer cleaning equipment, Coater/developers
Geographic map

Pan and zoom across the recorded sites. The selected case and location follow the controls above.

Markets

Block width is the supplier’s share, and shares do not change with the case. They do not give the share of output produced at each site.

Shin-Etsu and SUMCO supply ~54% of the wafer market in the retained source (30% and 24%, respectively). Supplier concentration makes their plant-level production and customer relationships relevant to disruption analysis; these company shares do not locate that production within Japan.

Herfindahl

Samsung, SK Hynix, Micron, CXMT, Nanya Technology

Samsung, Kioxia / WD, SK Hynix / Solidigm, Micron, YMTC

High bandwidth memory

SK Hynix, Samsung, Micron

Shin-Etsu, SUMCO, GlobalWafers, Siltronic, SK Siltron

Semiconductor equipment

Tokyo Electron, SUSS MicroTec, Others

Semiconductor equipment

Advantest, Teradyne, Others

Colors identify the supplier’s recorded country grouping, using the first country for mixed groups. They do not locate production. The evidence retains every country and supplier share.

Compound cases

Their component references, site lists and severities are written into each case; the application does not execute the component scenarios or calculate a combined production loss.

Three compound cases assume simultaneous disruptions across countries.

The Nankai and South Kanto combination is the Full rupture case, under Cases.

History

Manufacturer reports identify shutdowns and different stages of recovery at named factories. The price observation covers DDR3 2Gb (contract), Q2 2011. Scenario severities are separately assumed; these historical accounts supply no event-wide recovery duration.

Shin-Etsu’s restoration reports describe Shirakawa’s partial restart from 20 April 2011 and report pre-earthquake capacity restored on 1 July. Recovery was staged; these dates do not establish a common outage duration for other plants or future earthquakes.

The February freeze interrupted production at Samsung, NXP and Infineon in Austin.

February 2021,

Sony’s Kumamoto semiconductor plant stopped production after the April earthquakes.

16 Apr 2016,

The earthquake disrupted Shin-Etsu’s Shirakawa plant and Renesas’s Naka factory.

11 Mar 2011,

Cases

HERP probabilities are separately dated context for broader earthquake classes. They do not apply to these exact settings.

Scroll the table to compare every assumption; a case’s name opens its source context.

CaseMagnitudeRadiusSeveritySites30-year class probability
9400 km85%475%
7.3150 km70%370%
9500 km95%6

Evidence

Findings retain their source dates and derivation. Announcement dates come from the cited releases.
Key findings and manufacturing announcements, 10
  • Shin-Etsu and SUMCO supply ~54% of the wafer market in the retained source (30% and 24%, respectively). Supplier concentration makes their plant-level production and customer relationships relevant to disruption analysis; these company shares do not locate that production within Japan.

    shinetsu.co.jp, Q4 2024. Research database

  • The retained NAND table assigns Kioxia / WD a 19% supplier share. The Nankai case selects Yokkaichi, but contains no plant-level allocation from which to calculate how much of that supplier share would be lost.

    kioxia.com, Q4 2024. Research database

  • Tokyo Electron’s October 2025 announcement identifies equipment development and manufacturing at its Kyushu subsidiary in Kumamoto. Assessing an outage therefore requires production-site information beyond the Tokyo headquarters point selected in the South Kanto case.

    tel.com, October 2025. Primary filing or measurement

  • HERP’s April 2024 assessment gives a 70–80% thirty-year probability for the Nankai Trough M8–M9 class. The page displays that historical probability context alongside a chosen M9.0 case; the map circle does not calculate JMA intensity at Yokkaichi.

    jishin.go.jp, 2024. Primary filing or measurement

  • Hand analysis, joining sourced inputs with no recorded supply edge

    Samsung and SK Hynix together account for approximately 83% of HBM revenue (Q2 2026); that share does not locate their production. Icheon and Pyeongtaek lie outside the selected Japanese rupture zones. Both companies do depend on Japanese silicon wafers, Japanese equipment, and Japanese specialty chemicals, so a disruption to the Japanese materials and equipment layer would reach Korean memory production as consumable inventories deplete.

    The share figures are sourced and the input dependencies are documented, but the PROPAGATION between them is reasoned here rather than traced: the Japanese-input-to-SK-Hynix dependency is not a recorded edge in the supply-chain substrate, so the cascade engine cannot reach SK Hynix from a Japanese seed (it does reach Samsung, via recorded SUMCO and Advantest edges). No inventory-days figure for Korean fabs is held on this platform, so the claim states that depletion is the mechanism without asserting a timescale. Recorded buffer data for Korean memory fabs, or an Ex-21-style disclosure of the supply relationships, would settle it.

    counterpointresearch.com, Q2 2026. Research database

  • Micron accounts for ~18% of the HBM supplier market at Q2 2026. Assigning that entire share to Hiroshima would require evidence of its production allocation. The selected compound case contains no such allocation or calculated global HBM loss.

    counterpointresearch.com, Q2 2026. Research database

  • Shin-Etsu’s restoration reports describe Shirakawa’s partial restart from 20 April 2011 and report pre-earthquake capacity restored on 1 July. Recovery was staged; these dates do not establish a common outage duration for other plants or future earthquakes.

    shinetsu.co.jp, July 2011. Primary filing or measurement

Manufacturing announcements

The dates identify the cited report or release.

  • 2025–26

    HBM4 preparation and shipments

    SK hynix reported completed HBM4 development and preparation for mass production on 12 September 2025. Samsung reported HBM4 mass production and commercial shipments on 12 February 2026.

    SK hynix, 12 September 2025; Samsung, 12 February 2026

  • 2025 report

    TSMC advanced packaging

    TSMC's 2025 annual report describes continued investment in advanced packaging at several locations in Taiwan.

    TSMC, 2025 annual report

  • 2025

    Rapidus 2nm prototypes

    Rapidus reported working 2nm gate-all-around transistor prototypes at IIM-1 in July 2025, with mass production targeted for 2027.

    Rapidus, 18 July 2025

Sources

No recorded review. Newest input Q2 2026.
5 sources
Data
How the figures were made

The map highlights each case's selected facility IDs and draws its illustrative radius; it calculates neither seismic intensity nor production losses. Supplier shares and each Herfindahl remain independent of the selected case.

Each case has a chosen magnitude, epicentre, map radius, severity and list of locations. HERP probabilities provide separately dated context for the broader earthquake classes; they do not assign probabilities to these exact combinations of settings.

The authored site list selects the highlighted locations independently of the circle. The chart draws a geodesic circle from the stored epicentre and radius; the optional navigable map applies pixel-size limits at different zoom levels. Ground motion, tsunami inundation and damage are outside it. The inventory includes equipment-company headquarters as well as production sites; a company’s headquarters cannot locate all of its manufacturing capacity.

A Herfindahl adds a market’s squared supplier shares. One is printed here only where the shares come from a tier 1 or 2 source with a link a reader can open and a single date; 5 of the 6 markets have theirs withheld, each with its reason in the market’s record. The supplier shares stay as recorded. All 6 market-share records contain estimated values.

The Korean assessment uses DRAM shares from the concentration table. Its discussion of Japanese input shortages is a separate assessment of supply dependencies, made outside the cascade calculation; no inventory-depletion timescale is available. The cascade simulator’s Japanese-input preset follows recorded customer relationships from Japanese suppliers, including Shin-Etsu, SUMCO, Tokyo Electron and Advantest; those paths reach Samsung but not SK Hynix, so the preset covers only part of the Korean exposure assessed here and none of the earthquake probabilities or HBM-qualification detail.

Estimating lost output requires the share of production at each selected plant and the extent of the interruption there. Company market shares supply neither input. Equipment companies also require a distinction between the headquarters shown on the map and the factories and service operations that supply their customers.

Recovery dates refer to specific milestones. Sony’s end-July 2016 figure describes wafer inputs at full capacity; NXP’s March 2021 announcement records an initial restart. Neither date measures when customers received their delayed orders.

The GPU SKU shares in a location’s detail are inferred. HBM market share is a quarterly aggregate by supplier (Q2 2026, Counterpoint Research, Global DRAM and HBM market share); it is not a direct per-fab measurement of HBM bit output. Per-fab → GPU SKU shares apply the canonical share to a qualified-suppliers subset that is per-SKU, not per-generation.

HBM3 NVIDIA H100 draws from {SK Hynix, Micron} (Samsung HBM3 NVIDIA qualification fell through); HBM3 AMD MI300X draws from {SK Hynix, Samsung} (TrendForce 2024-03-13: Samsung HBM3 received AMD MI300 series certification by 1Q24; Micron is not in the MI300X HBM3 chain, and Micron’s MI3-series collaboration is on MI350X HBM3E); HBM3E SKUs (H200, B200, GB200) draw from {SK Hynix, Samsung, Micron} after Samsung NVIDIA-qualification in late Q3 2025. The assumption: each qualified supplier contributes HBM to a SKU in proportion to its merchant HBM share, not a measured per-SKU bit allocation, which would require per-SKU primary backing (Counterpoint, TrendForce or SemiAnalysis SKU tables) not yet ingested.

Authority tiers: HBM merchant shares are tier 2 (Counterpoint Research, Global DRAM and HBM market share, Q2 2026; SK investor disclosures and TrendForce as corroborating sources). The per-SKU projection itself is tier 3 (analyst inference from the canonical supplier shares). The projection applies Q2 2026 vendor revenue shares to supplier qualification sets recorded through Q3 2025. It assumes those sets remain applicable; subsequent qualification and product-mix changes are not modelled.

Sources: HERP long-term seismic hazard evaluation (jishin.go.jp), TrendForce quarterly DRAM/NAND/HBM market share reports, Omdia semiconductor equipment and silicon wafer trackers, USGS earthquake catalog (earthquake.usgs.gov), Micron 10-K FY2024, Kioxia IPO prospectus, Shin-Etsu Chemical Annual Report 2024, SUMCO Annual Report 2024, Tokyo Electron Annual Report 2024, Advantest Annual Report 2024. All data is open-source or from publicly filed corporate disclosures. Market share estimates are authority tier 2-3. Seismic probabilities are authority tier 1 (HERP official assessments).

No completed review is recorded for the full analysis. HBM revenue shares were checked against Counterpoint’s Q2 2026 table in September 2026; the DRAM figures were aligned with the concentration table without a new source check. The newest input comes from the Q2 2026 HBM revenue shares (Counterpoint); the DRAM share figures, which include CXMT, are two quarters older, at Q4 2025. Review state for every scenario is on the Scenarios page.

Corrections to this page, 3