Capacity, hardware inventory, ownership chain, and supply-chain position for QTS Cedar Rapids. Any export-control exposure is walked through the canonical organization graph — surfacing when the BIS Entity List touches a node above the facility in the chain — rather than asserted at the facility row.
As of 2026-07-27
1 record
Every organization on record at QTS Cedar Rapids, with the role it plays and the source for that specific claim. A party marked inferred is recorded as a reading of the cited source rather than something the source states outright.
Description
QTS Cedar Rapids sits alongside a Google data center in Big Cedar Industrial Center. It is divided into two phases which are expected to be completed in late 2026 and late 2027. We estimate its power capacity based on satellite images and 3D renderings of the air-cooled chillers lining each building. The compute capacity is based on this power capacity and the assumption that the best available NVIDIA AI servers will be used for each phase. The estimated power for phase 1 is consistent with a 6
Notes
Epoch estimation methods: our cooling equipment power model, chip availability, grid operator data.
Nearby Facilities (within 100 km)
source_url_contains_claim_verified