OpenAI Stargate Abilene

TypeAI TrainingStatusOperationalWhereAbilene, Texas, USIndexed fromEpoch AI Frontier Data Centers

Operational; Oracle Corporation is recorded as owning the AI hardware inside this site

Description quoted from Epoch AI Frontier Data Centers

The Stargate data center campus in Abilene Texas is expected to host OpenAI's largest compute cluster from the second half of 2025 through 2026. This is the first of several sites in the Stargate project, spanning the US and the globe. We have a variety of sources to estimate the capacity of this data center, from company announcements, to permit documents, to satellite imagery of air-cooled chillers.

Source: Epoch AI Frontier Data Centers, CC BY 4.0

1/3site roles identified3 site relationships1 finding in the company chain0 export-control designationsFurthest finding: company at site

Date in site records: Jul 28, 2026. Site data: Epoch AI Frontier Data Centers.

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · data to Jul 28, 2026

AI hardware owner · per catalog

Oracle Corporation parent ownership unresolved 1 finding

Which organisation owns the AI hardware inside it?

OpenAI Stargate AbileneSite

AI hardware owner · per catalog Oracle Corporation. Epoch AI's field for who owns the AI hardware, which it defines as not necessarily the owner or operator of the facility. source

Companies are grouped by their role at the site, with recorded parents above them. No parent companies were found in the ownership data. Further ownership remains unresolved where labelled. Record source: Epoch AI Frontier Data Centers; authority tier 2. Each role is drawn only as the relationship its own source establishes, listed above; none implies exclusive control of the full site. Ticks count the export-control and government-link findings for each company.
Plate II. Organisations recorded at the sitescrutica.com · data to Jul 28, 2026

Uses the compute

OpenAI

Named in Epoch AI's field for labs using the compute; it records use, not a lease.

Epoch AI Frontier Data Centers source

Power provider

American Electric Power

Named in Epoch AI's field for companies involved in providing power to the site.

Epoch AI Frontier Data Centers source

Construction

Mortenson

Named in Epoch AI's field for companies involved in construction of the site.

Epoch AI Frontier Data Centers source

Three relationships are recorded at OpenAI Stargate Abilene, under three labels: “Uses the compute”, “Power provider” and “Construction”.

Export controls and government links

No export-control designations were found in the checked company chains.

Plate III. Export controls and government linksscrutica.com · data to Jul 28, 2026
site1A company in the ownership chain is headquartered in the United Statescompany levels
Company at site

Headquarters jurisdiction
A company in the ownership chain is headquartered in the United States

United States: Operates the Export Administration Regulations (EAR) and the BIS Entity List under 15 CFR 730–774; deemed-export rules extend reach to foreign nationals on US soil. Export-control regimes listed for this jurisdiction: Wassenaar Arrangement, US EAR (BIS Entity List authority).

Country is the recorded headquarters location.Linked through the company recorded as owning the AI hardware inside this site.

Triangle: export-control designation or regulatory flag. Square: sovereign capital linkage. Circle: headquarters jurisdiction. Level 1 is a company at the site; higher levels are its parents. 1 finding is recorded; 0 are export-control designations.

Capacity

Reading. Power and acceleratorsscrutica.com · data to Jul 28, 2026
590 MW

Facility power

Counted in operating totals; recorded-power totals count this campus once, using Stargate Abilene (OpenAI/Oracle/SoftBank).

421 MW

Power for IT equipment

Estimated.

not recorded

Accelerators

An estimated 509,348 H100-equivalent.

Stargate Abilene (OpenAI / Oracle / Crusoe) has 5 records, and their power figures are never added together. Across the platform, recorded totals count the marked figure once; operating totals count a member’s figure only if it is operating capacity.

Scope: announced site scope · Status: operational · counted in recorded totals

Stargate Abilene (OpenAI/Oracle/SoftBank)

1.2 GW · not operating capacity · Company disclosure (press / IR)

Scope: current deployment · Status: operational

OpenAI Stargate Abilene

590 MW · operating capacity · Epoch AI Frontier Data Centers

Scope: named cluster (phase 1) · Status: announced

OpenAI Stargate Abilene Oracle OCI Supercluster Phase 1

240 MW · not operating capacity · Epoch AI GPU Clusters

Scope: named cluster (phase 2) · Status: announced

OpenAI Stargate Abilene Oracle OCI Supercluster Phase 2

801 MW · not operating capacity · Epoch AI GPU Clusters

Scope: named cluster (phase 3) · Status: announced

OpenAI Stargate Abilene Oracle OCI Supercluster Phase 3

2.2 GW · not operating capacity · Epoch AI GPU Clusters

Power comparison

590 MW is at the 99th percentile among the 310 operating AI Training records with a reported power figure. These represent 84% of the 369 operating AI Training records tracked; announced, under-construction and campus build-out figures are not ranked. The scale ends at the largest operating figure in this group, 1,276 MW.

Data quality · 1 flag
  • This record’s power figure is withheld from recorded-power totals so the campus counts once; operating totals count it, as the campus’s reviewed current deployment.
    Curator’s working note

    Part of campus Stargate Abilene (OpenAI / Oracle / Crusoe). This row's power capacity is withheld from recorded-power totals, which count the campus once at its canonical figure on Stargate Abilene (OpenAI/Oracle/SoftBank); operating totals count this row, under an editorial review, as the campus's current deployment. See the campus source-disagreement panel for every cited figure.

Methods and sources

Ownership roles

Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility.

Each role requires its own attribution. An operator named in a source supplies evidence of operation only.

Parent companies

Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented.

Level 1 identifies a company at the site, level 2 its parent, and each further level another parent. Export-control designations and government investments are assigned to the company concerned.

Missing values

Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits

Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld.

Epoch AI estimates capacity using satellite imagery, permits and corporate disclosures. Its catalog is the source for this site record.

Curator’s note on this campus

Five records describe the Abilene campus at different scopes. Recorded totals use the 1,200 MW site figure from OpenAI’s Stargate announcement, which describes the announced site rather than the plant running today. Operating totals use Epoch’s current-deployment estimate instead; Epoch’s April 2026 analysis estimated four of the eight buildings operational. The announced cluster-phase figures of 240.24, 800.80 and 2,200 MW remain visible but are excluded from both totals. The archived source does not establish whether the phases are additive or cumulative. The 2,200 MW phase figure exceeds the 1,200 MW site figure and requires a site-level source to resolve the difference.