Meta Hyperion

TypeAI TrainingStatusUnder constructionWhereHolly Ridge, Louisiana, USIndexed fromEpoch AI Frontier Data Centers

Under construction; Meta Platforms, Inc. is recorded as owning the AI hardware inside this site

Description quoted from Epoch AI Frontier Data Centers

Meta Hyperion is built on an enormous tract of land, more than three times the size of New York City’s Central Park. It is set to host Meta’s next flagship AI cluster after Prometheus. We estimate its compute capacity primarily based on an application by Entergy for three 752 MW gas turbines linked to the site, as well as plans for a new 1.8 GW substation by the grid operator MISO.

Source: Epoch AI Frontier Data Centers, CC BY 4.0

1/3site roles identified2 site relationships1 finding in the company chain0 export-control designationsFurthest finding: company at site

Site data: Epoch AI Frontier Data Centers.

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · compiled Oct 25, 2026

AI hardware owner · per catalog

Meta Platforms, Inc. parent ownership unresolved 1 finding

Which organisation owns the AI hardware inside it?

Meta HyperionSite

AI hardware owner · per catalog Meta Platforms, Inc. Epoch AI's field for who owns the AI hardware, which it defines as not necessarily the owner or operator of the facility. source

Companies are grouped by their role at the site, with recorded parents above them. No parent companies were found in the ownership data. Further ownership remains unresolved where labelled. Record source: Epoch AI Frontier Data Centers; authority tier 2. Each role is drawn only as the relationship its own source establishes, listed above; none implies exclusive control of the full site. Ticks count the export-control and government-link findings for each company.
Plate II. Organisations recorded at the sitescrutica.com · compiled Oct 25, 2026

Power provider

Entergy

Named in Epoch AI's field for companies involved in providing power to the site.

Epoch AI Frontier Data Centers source

Construction

Mortenson

Named in Epoch AI's field for companies involved in construction of the site.

Epoch AI Frontier Data Centers source

Two relationships are recorded at Meta Hyperion, under two labels: “Power provider” and “Construction”.

Export controls and government links

No export-control designations were found in the checked company chains.

Plate III. Export controls and government linksscrutica.com · compiled Oct 25, 2026
site1A company in the ownership chain is headquartered in the United Statescompany levels
Company at site

Headquarters jurisdiction
A company in the ownership chain is headquartered in the United States

United States: Operates the Export Administration Regulations (EAR) and the BIS Entity List under 15 CFR 730–774; deemed-export rules extend reach to foreign nationals on US soil. Export-control regimes listed for this jurisdiction: Wassenaar Arrangement, US EAR (BIS Entity List authority).

Country is the recorded headquarters location.Linked through the company recorded as owning the AI hardware inside this site.

Triangle: export-control designation or regulatory flag. Square: sovereign capital linkage. Circle: headquarters jurisdiction. Level 1 is a company at the site; higher levels are its parents. 1 finding is recorded; 0 are export-control designations.

Capacity

Reading. Power and acceleratorsscrutica.com · compiled Oct 25, 2026

No power figure is recorded for this site.

Meta Richland Parish (Hyperion) has 2 records, and their power figures are never added together. Across the platform, recorded totals count the marked figure once; operating totals count a member’s figure only if it is operating capacity. Measurement scope is unrecorded for 2 of them.

Scope: not stated · Status: under construction · counted in recorded totals

Meta Richland Parish (Hyperion)

2.0 GW · not operating capacity · Company disclosure (press / IR)

Scope: not stated · Status: under construction

Meta Hyperion

no power figure · Epoch AI Frontier Data Centers

Data quality · 1 flag
  • Any power figure on this record is excluded from power totals to avoid counting overlapping campus capacity twice.
    Curator’s working note

    Part of campus Meta Richland Parish (Hyperion). This record is a second record of a site another row represents, so it is not counted again in site totals; where it carries a power figure, that figure is withheld from aggregates and the campus canonical power lives on Meta Richland Parish (Hyperion). See the campus source-disagreement panel for every cited figure.

Methods and sources

Ownership roles

Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility.

Each role requires its own attribution. An operator named in a source supplies evidence of operation only.

Parent companies

Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented.

Level 1 identifies a company at the site, level 2 its parent, and each further level another parent. Export-control designations and government investments are assigned to the company concerned.

Missing values

Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits

Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld.

Epoch AI estimates capacity using satellite imagery, permits and corporate disclosures. Its catalog is the source for this site record.

Curator’s note on this campus

The Epoch and press records describe Meta’s Hyperion campus in Richland Parish; their coordinates are approximately 6 m apart. The grouping cites Meta’s 13 July 2026 release identifying Hyperion at this site. Recorded totals retain the 2,000 MW figure; the campus is under construction, so operating totals exclude it. That release describes 5 GW at full build-out, a different figure which has not been substituted into the capacity record.