Skip to main content

A dash in the power column means no figure is recorded.

Showing 716 records with capacity data or a substantive description. A further 3,551 records have no capacity data or substantive description. Show all 4,267.

551–600 of 716Page 12 of 15
FacilityCountryTypeStatusPower (MW)
Equinix FR8 (Frankfurt)Equinix SEC 10-K (2024)GermanyColocationUnder construction—
Equinix LD10 (London / Slough)Equinix SEC 10-K (2024)United KingdomColocationUnder construction—
Equinix LD14 (London)Equinix SEC 10-K (2024)United KingdomColocationUnder construction—
Equinix MB3 (Mumbai)Equinix SEC 10-K (2024)IndiaColocationUnder construction—
Equinix MD5 (Madrid)Equinix SEC 10-K (2024)SpainColocationUnder construction—
Equinix NY11 (Secaucus)Equinix SEC 10-K (2024)United StatesColocationUnder construction—
Equinix NY3 (New York)Equinix SEC 10-K (2024)United StatesColocationUnder construction—
Equinix PA14 (Paris)Equinix SEC 10-K (2024)FranceColocationUnder construction—
Equinix SG6 (Singapore)Equinix SEC 10-K (2024)SingaporeColocationUnder construction—
Equinix SV18 (Silicon Valley)Equinix SEC 10-K (2024)United StatesColocationUnder construction—
Equinix TY11 (Tokyo)Company disclosure (press / IR)JapanColocationOperational—
Equinix TY15 (Tokyo)Equinix SEC 10-K (2024)JapanColocationUnder construction—
ESMC Dresden FabEuropean Commission decisionGermanyLogic fabUnder construction—
Alice Recoque (EuroHPC)EuroHPC Joint UndertakingFranceHPC centerAnnounced—
Arrhenius (EuroHPC)EuroHPC Joint UndertakingSwedenHPC centerUnder construction—
Daedalus / Pharos AI Factory (EuroHPC)EuroHPC Joint UndertakingGreeceHPC centerUnder construction—
Deucalion (EuroHPC)EuroHPC Joint UndertakingPortugalHPC centerOperational—
Discoverer (EuroHPC)EuroHPC Joint UndertakingBulgariaHPC centerOperational—
JUPITER (EuroHPC)EuroHPC Joint UndertakingGermanyHPC centerOperational—
Karolina (EuroHPC)EuroHPC Joint UndertakingCzech RepublicHPC centerOperational—
Leonardo (EuroHPC)EuroHPC Joint UndertakingItalyHPC centerOperational—
LUMI (EuroHPC)EuroHPC Joint UndertakingFinlandHPC centerOperational—
MareNostrum 5 (EuroHPC)EuroHPC Joint UndertakingSpainHPC centerOperational—
MeluXina (EuroHPC)EuroHPC Joint UndertakingLuxembourgHPC centerOperational—
Vega (EuroHPC)EuroHPC Joint UndertakingSloveniaHPC centerOperational—
GDS BJ-1 BeijingGDS Holdings SEC 20-F (2024)ChinaColocationOperational—
GDS BJ-2 BeijingGDS Holdings SEC 20-F (2024)ChinaColocationOperational—
GDS BJ-3 BeijingGDS Holdings SEC 20-F (2024)ChinaColocationOperational—
GDS CS-1 ChangshuGDS Holdings Q4 2024 resultsChinaColocationOperational—
GDS CD-1 ChengduGDS Holdings SEC 20-F (2024)ChinaColocationOperational—
GDS GZ-1 GuangzhouGDS Holdings SEC 20-F (2024)ChinaColocationOperational—
GDS LF-8 LangfangGDS Holdings Q4 2024 resultsChinaColocationOperational—
GDS SH-1 ShanghaiGDS Holdings SEC 20-F (2024)ChinaColocationOperational—
GDS SH-4 ShanghaiGDS Holdings SEC 20-F (2024)ChinaColocationOperational—
GDS SH-8 ShanghaiGDS Holdings SEC 20-F (2024)ChinaColocationOperational—
GDS SZ-1 Shenzhen GuanlanGDS Holdings SEC 20-F (2024)ChinaColocationOperational—
GDS TJ-1 TianjinGDS Holdings SEC 20-F (2024)ChinaColocationOperational—
Global AI Chip Market (Aggregate)Epoch AI chip-sales dataset—OtherOperational—
Google Hamina Data CenterCompany disclosure (press / IR)FinlandHyperscale DCExpanding—
HammerHAIEuroHPC JU press announcements (Mar 2026)GermanyHPC centerUnder construction—
Huawei Dongguan Cloud Data Center (Songshan Lake)Huawei corporate disclosuresChinaHyperscale DCOperational—
Huawei Cloud Gui'an Data CenterHuawei corporate disclosuresChinaHyperscale DCOperational—
Huawei Cloud Ulanqab Data CenterHuawei corporate disclosuresChinaHyperscale DCOperational—
HUMAIN Dammam Phase 1HUMAIN press announcementsSaudi ArabiaAI trainingUnder construction—
HUMAIN Riyadh Phase 1HUMAIN press announcementsSaudi ArabiaAI trainingUnder construction—
imec Leuven (Headquarters)imec disclosuresBelgiumOtherOperational—
Intel Fab 52 MagdeburgCompany disclosure (press / IR)GermanyLogic fabCancelled—
Iron Mountain AZP-1 (Phoenix)Iron Mountain SEC 10-K (2024)United StatesColocationOperational—
Iron Mountain AZP-2 (Phoenix)Iron Mountain SEC 10-K (2024)United StatesColocationOperational—
Iron Mountain FRA-2 (Frankfurt)Iron Mountain SEC 10-K (2024)GermanyColocationOperational—
Coverage & sources

Facility coverage by source

Coverage varies by source: 97.1% of the Epoch AI Frontier Data Centers rows have capacity data or a substantive description, compared with 0.0% of the OpenStreetMap (tagged data centers) rows.

  1. Epoch AI Frontier Data Centers 70 68 with detail 97.1%
  2. Epoch AI GPU Clusters 437 395 with detail 90.4%
  3. PeeringDB facility registry 1,572 63 with detail 4.0%
  4. OpenStreetMap (tagged data centers) 1,173 0 with detail 0.0%
  5. IM3 / PNNL data-center corpus 391 0 with detail 0.0%
  6. OpenStreetMap 231 0 with detail 0.0%
  7. Microsoft Azure region documentation 56 0 with detail 0.0%
  8. Oracle Cloud region documentation 45 0 with detail 0.0%
  9. 50 smaller catalogues 292 190 with detail 65.1%

Bar length shows the number of records; the darker portion marks those with capacity data or a substantive description. Hatching groups the smaller sources.

Counts cover 4,267 public facility records as of 22 October 2026.

Tracked and browsable records

The full dataset includes 4,583 facilities across 110 countries, including 316 available only in aggregate under their licence. This register covers the 4,267 individually browsable records.

Related records

The map locates these facilities, Countries totals them by jurisdiction, and the company register lists related organisations.