Skip to main content
ScruticaAn open reference on AI compute

Facility record

LUMI

This record names as , but the cited source does not name this organisation.

EuroHPCOperational HPC centre, Kajaani, Finland

1,000 km
1,000 km
Kajaani, Finland

LUMI (Large Unified Modern Infrastructure) is hosted by CSC – IT Center for Science in Kajaani, Finland and operated for the 11-country LUMI consortium (FI, BE, CZ, DK, EE, IS, NL, NO, PL, SE, CH). LUMI-G partition contains 11,912 AMD Instinct MI250X across 2,978 nodes; HPL Linpack 379.7 PFLOPS FP64, peak ~531 PFLOPS FP64. HPE Cray EX architecture. Operational from 2022-06-13; planned lifespan 2021-2027.

From EuroHPC Joint Undertaking.

Companies and export controls

This record names as , but the cited source does not establish that this organisation holds title to the site.

  1. This site
  2. Parent ownership unresolved
  1. This site
  2. Named on the record
  3. Parent ownership unresolved

The site’s companies and their recorded parents were checked; no export-control designation, sovereign investment or classified jurisdiction was found.

Headquarters country is unrecorded for 2 companies, leaving their jurisdiction checks incomplete.

Capacity

Site records dated 3 Oct 2024.

Accelerators, catalogue count

Location

The nearest destination the advanced-computing licence rules name (Macao and Country Group D:5) is Russia, 113 km from the recorded position: a reply within 1.04 ms over standard single-mode fibre to a timing server at the site would rule it out.

Campus records

LUMI, CSC Kajaani has three records, and their power figures are never added together.

Sources

EuroHPC Joint Undertaking. Site records dated 13 Jun 2022 to 3 Oct 2024. Compiled 20 Nov 2026.
4 sources
SourceUsed forRecords
EuroHPC Joint UndertakingSite identity, control roles and capacity
Ownership graphParent-company relationships, with sources recorded for each link
Export-control designationsFederal Register-anchored designations attached to the relevant organisation0 records
Licensed corporate databaseCorporate affiliations and sovereign investment links
Data
How the figures were made

Ownership roles. The site owner, operator and AI-hardware owner can be different companies. Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility. Each role requires its own attribution: a role is shown only where its own source establishes it. An operator named in a source supplies evidence of operation only, and no role implies exclusive control of the full site.

Parent companies. Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented. Each finding is assigned to the company it concerns.

Visibility tier. The corporate-traceability tier does not verify property ownership or facility operation. Basis: Company identified; parent unrecorded.

Campus records. The power figures of a campus’s records are never added together. Across the platform, recorded totals count EuroHPC LUMI’s figure once; operating totals count a member’s figure only if it is operating capacity. Measurement scope is unrecorded for 3 of LUMI, CSC Kajaani’s 3 records. Curator’s note on this campus: One machine, the LUMI supercomputer in CSC's Kajaani data centre, held by two records. TOP500 system 180048 names "LUMI" at "EuroHPC/CSC"; the Epoch GPU-clusters row "EuroHPC LUMI" sits at Tehdaskatu 15, 87100 Kajaani. Both are the whole system, so the larger envelope carries power: 12.0922 MW (Epoch's capacity figure). Withheld: TOP500's 7.1 MW, retained and shown.

Data quality. Any power figure on this record is excluded from power totals to avoid counting overlapping campus capacity twice. Curator’s working note: Part of campus LUMI, CSC Kajaani. This record is a second record of a site that EuroHPC LUMI represents, so it is not counted again in site totals; it carries no power figure. Its accelerator figures are kept.

Missing values. Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits. Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld. Per-fund identities and amounts are withheld.

Estimates. Figures from EuroHPC Joint Undertaking retain the source’s estimate flags. The tilde marks an estimate.

Compiled. Compiled 20 Nov 2026. Dates attached to findings refer to the source evidence.

Identifiers
Scrutica ID
fac-eurohpc-lumi
Class
HPC centre
Coordinates
64.2236, 27.7269
Visibility tier
Tier 4