Remote Access Rule

Commerce’s rule on remote access requires a licence for advanced AI chips destined to any data centre that gives companies whose headquarters or ultimate parent is in Macau or in a country under a US arms embargo, China among them, access to more than 12,000,000 aggregate TPP, a sum that exceed.

Commerce released the rule on 16 Nov 2026; it takes effect on the day it is published in the Federal Register, which has scheduled it for 19 Nov 2026.

The rule, case by case

Takes effect on publication

Each case sets what the released rule says beside the law in force on 16 Nov 2026. The citations after each sentence link to the text it rests on.

CaseReleased ruleIn force on 16 Nov 2026Sources on Access Routes
Chips sent to a country
Advanced computing items are exported to China or another country under a US arms embargo (Country Group D:5), or to Macau.

A licence is required; applications are reviewed under a presumption of denial, except that exports of commodities under 21,000 TPP and 6,500 GB/s of total DRAM bandwidth to end users in China or Macau are reviewed case by case if the applicant gives the additional information required. § 742.6(a)(6)(iii)(A), p. 26; § 742.6(a)(6)(iii)(A)(2), p. 27; § 742.6(b)(10)(iii)(A)(2), p. 28

A licence is required for these items, for ECCN 3A090.a chips under the requirement covering every destination and for ECCN 3A090.b chips under the one covering Country Groups D:1, D:4 and D:5, and applications are reviewed under the same presumption of denial and the same case-by-case exception. 15 CFR 742.6(a)(6)(iii)(A); 15 CFR 742.6(b)(10)(iii)(A)(1)

2 sources
Advanced computing items go to a company headquartered in an arms-embargoed country or Macau, or whose ultimate parent company is, in a country outside Country Groups D:1, D:4 and D:5 or in one of them that is also in Country Group A:5 or A:6.

A licence is required for these items, ECCN 3A090.a chips included, and where the destination is Indonesia, Malaysia, Singapore, Brazil or Thailand the application is reviewed under the presumption of denial for such companies. § 744.23(a)(3)(i)(A), p. 32; § 742.6(a)(6)(iii)(A)(1), p. 27; § 742.6(b)(10)(iii)(A)(2), p. 28

Exporting these items to such a company needs a licence, under the requirement for such companies for ECCN 3A090.b chips and under the requirement covering every destination for ECCN 3A090.a chips. BIS guidance of 31 May 2026, para. 1; 15 CFR 744.23(a)(3)(i)(A); 15 CFR 742.6(a)(6)(iii)(A)

3 sources
Advanced computing items are exported to Indonesia, Malaysia, Singapore, Brazil or Thailand.

A licence is required, and applications are reviewed case by case for whether the transaction is contrary to US national security or foreign policy interests, including the effectiveness of the country's export controls and its coordination with the Bureau of Industry and Security on enforcement, although applications for a company headquartered in an arms-embargoed country or Macau, or whose ultimate parent company is, are reviewed under a presumption of denial. § 742.6(a)(6)(iii)(A), p. 26; § 742.6(a)(6)(iii)(A)(1), p. 27; § 742.6(b)(10)(iii)(A)(1), p. 28

Preamble of the released ruleThe summary extends the requirement to any further country the Secretary of Commerce designates in consultation with the Secretary of State or the Assistant to the President for National Security Affairs, while the operative paragraph lists only Indonesia, Malaysia, Singapore, Brazil and Thailand. Summary, p. 1; § 742.6(a)(6)(iii)(A)(1), p. 27

A licence is required for ECCN 3A090.a chips and the items listed with them to or within any destination worldwide. 15 CFR 742.6(a)(6)(iii)(A)

none held
In Indonesia, Malaysia, Singapore, Brazil or Thailand, the ultimate consignee or end user is headquartered in the United States, or its ultimate parent company is.

The licence requirement for those countries does not apply if the exporter follows the monthly reporting the rule sets out, and the exclusion covers that requirement alone. Note 1 to § 742.6(a)(6)(iii)(A)(1), p. 27; § 743.10(a), p. 29; § 743.10(d), p. 30

A licence is required for ECCN 3A090.a chips and the items listed with them to or within any destination worldwide. 15 CFR 742.6(a)(6)(iii)(A)

none held
Advanced computing items are exported to a country in Country Group D:1 or D:4 other than Macau that is in neither Country Group D:5 nor Country Group A:5 or A:6, or to the United Arab Emirates.

A licence is required, and applications are reviewed under a presumption of approval unless they are for an entity headquartered in an arms-embargoed country or Macau or with its ultimate parent there, when the presumption is of denial; this requirement does not apply where the ultimate consignee and all end users are approved entities in the United Arab Emirates listed for these items. § 742.6(a)(6)(iii)(A)(2), p. 27; § 742.6(b)(10)(iii)(A)(2), p. 28

A licence is required for these items, for ECCN 3A090.a chips under the requirement covering every destination and for ECCN 3A090.b chips under the one covering the United Arab Emirates and Country Groups D:1, D:4 and D:5, which does not apply where the ultimate consignee and all end users are approved entities in the United Arab Emirates listed for these items. 15 CFR 742.6(a)(6)(iii)(A)

none held
Advanced computing items are exported to any other country.

In the passages searched, the released text sets no licence requirement on these items for the destination alone, while the requirements that turn on the headquarters of the company the items are for, or on a data centre's customers, can apply. § 742.6(a)(6)(iii)(A), p. 26; Preamble, p. 12; § 744.23(a)(3)(i)(A), p. 32; § 744.24(a)(1), p. 33

A licence is required for ECCN 3A090.a chips and the items listed with them to or within any destination worldwide. 15 CFR 742.6(a)(6)(iii)(A)

none held
Data centres that give such companies access
A data centre outside the United States gives companies headquartered in an arms-embargoed country or Macau, or whose ultimate parent company is, access to more than 12,000,000 aggregate TPP, at that data centre or through data centres linked to it.

Exporting, reexporting or transferring the listed advanced computing items needs a licence when there is knowledge that they are destined to a data centre that is giving or will give such access; licence exceptions do not apply except as the Bureau of Industry and Security notes when a destination is designated, and applications are reviewed case by case. § 744.24(a)(1), p. 33; § 744.24(b)(1), p. 35; § 744.24(c), p. 36

Renting such companies time on these chips in a data centre abroad needs no licence in the Bureau's 2009 reading, though it said in 2025 that certain activities may trigger a licence requirement under its catch-all controls when there is knowledge that an AI model will be used for a weapons of mass destruction or military-intelligence end use or end user. BIS Advisory Opinion, 13 Jan 2009, p. 2, answer (1); BIS policy statement, 13 May 2025, p. 1

7 sources
A data centre was giving such companies a significant volume of compute before the rule's publication and wants to continue.90 days from publication

It must obtain a licence within 90 days of the rule's effective date or face future export restrictions. § 744.24(b)(3), p. 36; DATES, p. 3

A question the released text leaves openThe section defines neither a significant volume of compute nor the future export restrictions. § 744.24(b)(3), p. 36; § 744.24(d)(1), p. 36; § 744.24(d)(2), p. 36

Renting such companies time on these chips in a data centre abroad needs no licence in the Bureau's 2009 reading, though it said in 2025 that certain activities may trigger a licence requirement under its catch-all controls when there is knowledge that an AI model will be used for a weapons of mass destruction or military-intelligence end use or end user. BIS Advisory Opinion, 13 Jan 2009, p. 2, answer (1); BIS policy statement, 13 May 2025, p. 1

7 sources
A data centre outside the United States that received the chips without a licence later begins giving such companies access to more than 12,000,000 aggregate TPP.

The requirement applies whether or not the holder of the chips was a party to the original export, and whoever exports, reexports or transfers the chips without authorisation on or after publication must tell the recipient that the operator needs authorisation for such a change of end use. Note 1 to § 744.24(a)(1), p. 33; § 744.24(e), p. 37

Preamble of the released ruleThe preamble says in one place that an authorisation may be required on such a change of end use, and elsewhere that the change counts as a transfer (in-country) and requires one. Preamble, p. 9; Preamble, p. 12

A change in end use or end user within the same foreign country is a transfer (in-country), and the Bureau has said such a transfer of chips a cloud provider already holds may need a licence under its catch-all controls where there is knowledge that the AI models trained for such companies will be used for a weapons of mass destruction or military-intelligence end use or end user. 15 CFR 734.16; BIS policy statement, 13 May 2025, p. 1; BIS policy statement, 13 May 2025, p. 1, second bullet

7 sources
The access is only for a commercial recommender system.

The requirement does not apply if the access is only for a commercial recommender system and the exporter submits to the Bureau of Industry and Security the customer's name, the summed total processing performance of the chips provided to or for it, and the diligence done to ensure the access is provided only for that purpose. § 744.24(b)(2), p. 35; § 744.24(d)(1), p. 36

Preamble of the released ruleThe preamble says bona fide data-centre operators already giving access for commercial recommender systems may continue for 90 days and must then obtain a licence to continue. Preamble, p. 14

A question the released text leaves openThe operative exclusion and the preamble's licence after 90 days point different ways, and the released text does not reconcile them. § 744.24(b)(2), p. 35; Preamble, p. 14

Renting such companies time on these chips in a data centre abroad needs no licence in the Bureau's 2009 reading, though it said in 2025 that certain activities may trigger a licence requirement under its catch-all controls when there is knowledge that an AI model will be used for a weapons of mass destruction or military-intelligence end use or end user. BIS Advisory Opinion, 13 Jan 2009, p. 2, answer (1); BIS policy statement, 13 May 2025, p. 1

7 sources
Such companies get access to 12,000,000 aggregate TPP or less at one data centre and the data centres linked to it.

The data-centre prohibition sets no licence requirement on exports to a data centre that gives such companies access to 12,000,000 aggregate TPP or less, unless the Bureau of Industry and Security informs those concerned that a licence is required. § 744.24(a)(1), p. 33; § 744.24(a)(2), p. 34

Preamble of the released ruleThe preamble says the requirement on exports for companies headquartered in an arms-embargoed country or Macau has always extended to exports on their behalf, as where such a company is the purchaser or the exclusive or primary remote end user, with more than 50 percent of the data centre's compute. Preamble, p. 13

Renting such companies time on these chips in a data centre abroad needs no licence in the Bureau's 2009 reading, though it said in 2025 that certain activities may trigger a licence requirement under its catch-all controls when there is knowledge that an AI model will be used for a weapons of mass destruction or military-intelligence end use or end user. BIS Advisory Opinion, 13 Jan 2009, p. 2, answer (1); BIS policy statement, 13 May 2025, p. 1

7 sources
One such company spreads its use over data centres that are not linked, each giving such companies 12,000,000 aggregate TPP or less.

The data-centre prohibition counts access at one data centre or through linked data centres, so it sets no licence requirement on this case, unless the Bureau of Industry and Security informs those concerned that a licence is required. § 744.24(a)(1), p. 33; § 744.24(d)(2), p. 36; § 744.24(a)(2), p. 34

Renting such companies time on these chips in a data centre abroad needs no licence in the Bureau's 2009 reading, though it said in 2025 that certain activities may trigger a licence requirement under its catch-all controls when there is knowledge that an AI model will be used for a weapons of mass destruction or military-intelligence end use or end user. BIS Advisory Opinion, 13 Jan 2009, p. 2, answer (1); BIS policy statement, 13 May 2025, p. 1

7 sources
A company headquartered elsewhere gets access to more than 12,000,000 aggregate TPP at a data centre and trains AI models for, or supplies them to, a company headquartered in an arms-embargoed country or Macau.

The requirement counts access given to such companies or for them. § 744.24(a)(1), p. 33

Preamble of the released ruleThe preamble says access is for a Country Group D:5 company where there is knowledge that a data centre gives it to a non-D:5 customer that trains AI models for, helps train them for, or supplies them to that company. Preamble, p. 8

Renting such access needs no licence in the Bureau's 2009 reading, though it said in 2025 that a transfer (in-country) of chips a cloud provider already holds may need a licence under its catch-all controls where there is knowledge that they will be used to train AI models for or on behalf of such companies and that a model will be used for a weapons of mass destruction or military-intelligence end use or end user. BIS Advisory Opinion, 13 Jan 2009, p. 2, answer (1); BIS policy statement, 13 May 2025, p. 1; BIS policy statement, 13 May 2025, p. 1, second bullet

7 sources
A customer headquartered outside an arms-embargoed country and Macau is owned or controlled from one, but its ultimate parent company is headquartered elsewhere.

The requirement turns on where a company or its ultimate parent company is headquartered, while the diligence the exporter is expected to obtain asks whether customers are owned or controlled, directly or indirectly, by persons located or headquartered in such a country or Macau. § 744.24(a)(1), p. 33; Note 3 to § 744.24(a)(1), p. 34

A question the released text leaves openWhether ownership or control short of an ultimate parent brings a customer within the requirement is left open by the released text. § 744.24(a)(1), p. 33; Note 3 to § 744.24(a)(1), p. 34

The end-user requirement for such entities abroad turns on the same two facts, where the entity is headquartered and where its ultimate parent company is. 15 CFR 744.23(a)(3)(i)(A); BIS guidance of 31 May 2026, para. 1

7 sources
The customer is a university, a research institute or a state body headquartered in an arms-embargoed country or Macau.

The requirement, the recommender exclusion, the paragraph on data centres already giving access and the notice all describe the customer as a company. § 744.24(a)(1), p. 33; § 744.24(b)(2), p. 35; § 744.24(b)(3), p. 36; § 744.24(e), p. 37

Preamble of the released ruleThe preamble's background, in its first description of the requirement, speaks of access for an entity. Preamble, I. Background, p. 4

A question the released text leaves openWhether access for a customer that is not a company falls under the requirement is left open by the released text. § 744.24(a)(1), p. 33; Preamble, I. Background, p. 4

Renting such access needs no licence in the Bureau's 2009 reading, though it said in 2025 that certain activities may trigger a licence requirement under its catch-all controls when there is knowledge that an AI model will be used for a weapons of mass destruction or military-intelligence end use or end user; the end-user requirement for exports abroad speaks of any entity headquartered in such a country or Macau. BIS Advisory Opinion, 13 Jan 2009, p. 2, answer (1); BIS policy statement, 13 May 2025, p. 1; 15 CFR 744.23(a)(3)(i)(A)

7 sources
The customer is headquartered in Hong Kong.

The words Hong Kong do not appear in the released text, whose requirement names Macau and Country Group D:5. § 744.24(a)(1), p. 33

A note on export filings says Hong Kong is considered a part of the People's Republic of China under the Export Administration Regulations. Note 1 to 15 CFR 758.1(b)(10)

none held
The data centre is in the United States.

The requirement covers items destined to such a data centre in any destination worldwide and applies to their export, reexport or transfer (in-country). § 744.24(a)(1), p. 33

Preamble of the released ruleThe summary speaks of overseas data centres, and the preamble of data centres outside the United States and of data centres wherever located. Summary, p. 1; Preamble, p. 13; Preamble, I. Background, p. 4

A question the released text leaves openThe released text does not settle whether a data centre in the United States falls within the requirement. § 744.24(a)(1), p. 33; Preamble, p. 13

The regulations define an export to include a shipment or transmission out of the United States, a reexport to include one from one foreign country to another, and a transfer (in-country) as a change in end use or end user within the same foreign country. 15 CFR 734.13(a)(1); 15 CFR 734.14(a)(1); 15 CFR 734.16

none held
A data centre gives such companies access to some of its chips, and the 12,000,000 aggregate TPP has to be counted.

The requirement turns on whether a data centre is providing or will provide access to more than 12,000,000 aggregate TPP, at that data centre or through linked data centres, to or for such companies, and aggregate TPP is the sum of the total processing performance of a group of the listed chips. § 744.24(a)(1), p. 33; § 772.1, Aggregate TPP, p. 44

A question the released text leaves openThe words can be read as counting the chips one such company can use, the chips all such companies can use together, or all the chips at the data centre and those linked to it, and the released text chooses none of these readings. § 744.24(a)(1), p. 33; § 772.1, Aggregate TPP, p. 44

Rented access needs no licence at any aggregate TPP in the Bureau's 2009 reading, though it said in 2025 that certain activities may trigger a licence requirement under its catch-all controls when there is knowledge that an AI model will be used for a weapons of mass destruction or military-intelligence end use or end user. BIS Advisory Opinion, 13 Jan 2009, p. 2, answer (1); BIS policy statement, 13 May 2025, p. 1

7 sources
What an exporter must ask and tell
An exporter ships the listed advanced computing items to a foreign data centre.

To show it lacks knowledge, the exporter is expected to obtain, and be able to provide, enough information from the data centre about its know-your-customer checks, and a data centre that declines or cannot provide information enough to verify compliance raises a red flag that presumptively gives the exporter knowledge unless the exporter resolves it before proceeding. Note 3 to § 744.24(a)(1), p. 34

Preamble of the released ruleThe summary says data centres, foreign foundries and chip exporters must perform due diligence on their customers, and the preamble describes the note as setting expectations for US persons and foreign data centres. Summary, p. 1; Preamble, p. 10

The know-your-customer guidance does not mention data centres, and its red flag on computing services concerns assistance in training an AI model whose weights ECCN 4E091 controls. Supplement no. 3 to part 732, red flag 28

none held
On or after publication, an exporter ships the listed items without a licence because it has no knowledge of a prohibited end use and no other licence requirement applies.

The exporter must tell the recipient that an authorisation from the Bureau of Industry and Security is required if the items will be used at a data centre giving access to more than 12,000,000 aggregate TPP to or for companies headquartered in an arms-embargoed country or Macau, or whose ultimate parent company is. § 744.24(e), p. 37

In the passages searched, the regulations in force require no notice of this kind, and a later change in end use or end user within the same foreign country is a transfer (in-country). 15 CFR 734.16

none held
A data centre operator receives the listed items with that notice.

The notice must say that the transferor, such as the data centre operator, must obtain authorisation for the change of end use and must follow the know-your-customer guidance in the regulations. § 744.24(e), p. 37

A change in end use or end user within the same foreign country is a transfer (in-country), and the Bureau has said such a transfer of chips a cloud provider already holds may need a licence under its catch-all controls where there is knowledge that the AI models trained for such companies will be used for a weapons of mass destruction or military-intelligence end use or end user. 15 CFR 734.16; BIS policy statement, 13 May 2025, p. 1; BIS policy statement, 13 May 2025, p. 1, second bullet

none held
Foundries and packagers
A foundry or packager ships an advanced logic chip for a designer located in, or with an ultimate parent headquartered in, Country Group D:1, D:4 or D:5 or in Indonesia, Malaysia, Singapore, Brazil or Thailand.

Of the three ways a foundry or packager can overcome the presumption that the chip is an ECCN 3A090.a chip designed or marketed for data centres, the two resting on a transistor count attested after packaging are closed for such a designer. Note 1 to ECCN 3A090.a, p. 76; Note 1 to ECCN 3A090.a, paragraph b., p. 78; Note 1 to ECCN 3A090.a, paragraph c., p. 78

Preamble of the released ruleThe summary says these amendments reduce the ways to overcome the presumptions for chip designers located in destinations that face a licence requirement for these chips. Summary, p. 2

A transistor-count attestation by the foundry after packaging outside an arms-embargoed country or Macau, or by an approved packager, overcomes the presumption whatever the designer's location. Note 1 to ECCN 3A090.a; Note 1 to ECCN 3A090.a, paragraph b.; Note 1 to ECCN 3A090.a, paragraph c.

none held
A foundry or packager ships an advanced logic chip specified in ECCN 3A090.a whose designer is neither an approved nor an authorised designer.

A licence is required to export, reexport or transfer it to or within any destination. § 744.23(a)(3)(i)(C), p. 32

A licence is required for every ECCN 3A090.a chip to or within any destination worldwide, and a foundry's or packager's advanced logic chip is presumed to be one unless the presumption is overcome. 15 CFR 742.6(a)(6)(iii)(A); Note 1 to ECCN 3A090.a

none held
What the rule removes
The regulations hold License Exception Artificial Intelligence Authorization, License Exception Low Processing Performance and the list of Artificial Intelligence Authorization countries.

The rule removes all three and reserves their places. Amendatory instruction 6, p. 25; Amendatory instruction 7, p. 25; Amendatory instruction 8, p. 25

Preamble of the released ruleThe summary says the rule formally rescinds the regulations implementing the AI Diffusion Rule, which it says has never been enforced. Summary, p. 2

The regulations hold all three. 15 CFR 740.27; 15 CFR 740.29; Supplement no. 5 to part 740

none held
The regulations control the weights of AI models trained with 10²⁶ or more operations.

The rule removes ECCN 4E091, the foreign direct product rule for model weights and the paragraph on classification requests for AI models. Amendatory instruction 28, p. 44; Amendatory instruction 3, p. 24; Amendatory instruction 18, p. 37; Preamble, p. 15

Preamble of the released ruleThe preamble lists further removals tied to model weights, among them a know-your-customer red flag and the definition of model weights. Preamble, p. 15

ECCN 4E091 controls such weights, and the regulations hold a foreign direct product rule for them and a paragraph on classification requests for AI models. ECCN 4E091; 15 CFR 734.9(l); 15 CFR 748.3(f)

none held
A data centre holds or seeks a Data Center Validated End-User authorisation.

The rule removes the Data Center Validated End-User authorisation, with its guidelines. Preamble, p. 15; Amendatory instruction 22, p. 42

The regulations hold guidelines for the Data Center Validated End-User authorisation. Supplement no. 10 to part 748

none held
Periods that run from publication
Items that lose eligibility for a licence exception or for shipment without a licence are en route to a port of export under actual orders on the day of publication.30 days from publication

They may proceed under their former eligibility if the export, reexport or transfer (in-country) is completed within 30 days of publication. Preamble, Savings Clause, p. 19

No such period runs before the rule's publication. Preamble, Savings Clause, p. 19; DATES, p. 3

none held
A reader wishes to comment on the rule's revisions and additions.60 days from publication

Comments must be received by the Bureau of Industry and Security within 60 days of publication. DATES, p. 3

No comment period runs before the rule's publication. DATES, p. 3

none held
The period for a data centre already giving such companies a significant volume of compute to obtain a licence.90 days from publication

The 90 days run from the rule's effective date, which is the day of publication, and a data centre still without a licence at their end faces future export restrictions. § 744.24(b)(3), p. 36; DATES, p. 3

No such period runs before the rule's publication. § 744.24(b)(3), p. 36; DATES, p. 3

7 sources
An exporter relies on the exclusion for an ultimate consignee or end user headquartered in the United States in Indonesia, Malaysia, Singapore, Brazil or Thailand.

It must report monthly on every shipment made under the exclusion on or after publication, each report due by the first business day of the month after the shipment. § 743.10(a), p. 29; § 743.10(d), p. 30

No such reports are due before the rule's publication, when the exclusion they serve takes effect. § 743.10(a), p. 29; DATES, p. 3

none held

The threshold in chips

Aggregate TPP is the sum of each chip’s total processing performance: its dense throughput on the maker’s datasheet, in TFLOPS or TOPS, multiplied by the bit length of the operation.

ChipThroughputTPP per chipChips that exceed 12,000,000Source
AMD Instinct MI400Estimated figures20,000 TFLOPS at 8 bits160,000AMD Advancing AI Event June 2025
NVIDIA Rubin GPUEstimated figures17,500 TFLOPS at 8 bits140,000NVIDIA HGX Rubin individual-GPU specifications (preliminary)
NVIDIA B30015,000 TFLOPS at 4 bits60,000NVIDIA Technical Blog "Inside NVIDIA Blackwell Ultra" + GB300 NVL72 product page
AMD Instinct MI355X2,516.6 TFLOPS at 16 bits40,265.6AMD MI355X GPU brochure (CDNA 4, Advancing AI 2025)
MI350X2,309.6 TFLOPS at 16 bits36,953.6AMD MI350X GPU brochure (CDNA 4, Advancing AI 2025)
Google TPU v7 (Ironwood)4,614 TFLOPS at 8 bits36,912Google Cloud blog (Ironwood: the age of inference)
B2002,250 TFLOPS at 16 bits36,000NVIDIA Blackwell Architecture Technical Brief; HGX B200 1000W variant
Gaudi 31,835 TFLOPS at 16 bits29,360Intel Gaudi 3 datasheet (cdrdv2-public.intel.com/845118)
B1001,750 TFLOPS at 16 bits28,000NVIDIA Blackwell Architecture announcement (GTC 2024); Tom's Hardware GTC 2024 coverage
MI300X2,614.9 TOPS at 8 bits20,919.2AMD MI300X datasheet
MI325X2,614.9 TFLOPS at 8 bits20,919.2AMD Instinct MI325X data sheet
AWS Trainium3Estimated figures2,520 TFLOPS at 8 bits20,160AWS Trn3 UltraServer announcement
H100 SXM5989.5 TFLOPS at 16 bits15,832NVIDIA H100 datasheet
H200 SXM989.5 TFLOPS at 16 bits15,832NVIDIA H200 datasheet; BIS Jan 2026 press release
H800 SXM5Estimated figures989.5 TFLOPS at 16 bits15,832NVIDIA / tier-2 technical analysis (no public NVIDIA H800 SXM5 datasheet exists)
Google TPU v6e (Trillium)918 TFLOPS at 16 bits14,688Google Cloud TPU v6e documentation
Huawei Ascend 920Estimated figures900 TFLOPS at 16 bits14,400TrendForce
B30AEstimated figures1,750 TFLOPS at 8 bits14,000TrendForce (Aug 2025)
H100 NVL835.5 TFLOPS at 16 bits13,368NVIDIA H100 NVL Product Brief PB-11773-001 (March 2024) + current NVIDIA H100 product page
Huawei Ascend 910CEstimated figures780 TFLOPS at 16 bits12,480DeepSeek research / Tom's Hardware
H100 PCIe1,513 TFLOPS at 8 bits12,104NVIDIA H100 PCIe GPU Product Brief PB-11133-001 (November 2022)
H800 PCIe1,513 TFLOPS at 8 bits12,104Lenovo ThinkSystem NVIDIA H800 PCIe Gen5 GPU product guide (lp1814)
Google TPU v5p459 TFLOPS at 16 bits7,344Google Cloud TPU v5p documentation
Ascend 910BEstimated figures375 TFLOPS at 16 bits6,000CSET Georgetown "Pushing the Limits" sub-variant analysis
Tenstorrent Blackhole p150664 TFLOPS at 8 bits5,312Tenstorrent Blackhole specifications
A100 SXM312 TFLOPS at 16 bits4,992NVIDIA A100 datasheet
A800312 TFLOPS at 16 bits4,992NVIDIA / Tom's Hardware analysis

The table lists chips of 4,800 TPP or more. A chip under that is specified in ECCN 3A090, and so counted, only where its performance density, a figure worked out from its die area, is high enough.

Add up an inventory

Enter a count beside any chip; the sums are worked in this browser, and nothing you enter is sent.

  • Count

H100 SXM5: 758 × 15,832 = 12,000,656

The sum is 12,000,656 aggregate TPP, which is more than 12,000,000.

A question the released text leaves openThe words can be read as counting the chips one such company can use, the chips all such companies can use together, or all the chips at the data centre and those linked to it, and the released text chooses none of these readings. § 744.24(a)(1), p. 33; § 772.1, Aggregate TPP, p. 44

The text, compared

Where the summary, the preamble and the operative text differ, and what each amended provision says in the Code of Federal Regulations as in force on 9 Nov 2026.

The released rule beside the Code of Federal Regulations in force

Where a licence is needed for chips in 3A090.a

Operative text

“(A) A license is required for items specified in ECCNs 3A001.z; 3A090 (except for 3A090.c);”

§ 742.6(a)(6)(iii)(A), p. 26

Operative text

“for exports, reexports, and transfers (in-country) to or within the destinations specified under paragraphs (a)(6)(iii)(A)(1)-(2). (1) Indonesia, Malaysia, Singapore, Brazil, and Thailand.”

§ 742.6(a)(6)(iii)(A) and (A)(1), p. 27

In force

“(A) Worldwide license requirement. A license is required to export, reexport, or transfer (in-country) items specified in ECCNs 3A001.z.1.a, z.2.a, z.3.a, z.4.a; 3A090.a;”

15 CFR 742.6(a)(6)(iii)(A)

In force

“to or within any destination worldwide.”

15 CFR 742.6(a)(6)(iii)(A)

In force, § 742.6(a)(6)(iii)(A) requires a licence for chips in 3A090.a to or within any destination worldwide; the released paragraph requires one for chips in 3A090 other than 3A090.c to or within Indonesia, Malaysia, Singapore, Brazil and Thailand and to or within the destinations of its paragraph (A)(2).

The case-by-case review below 21,000 TPP and 6,500 GB/s

Operative text

“(2) Policy for Country Groups D:1, D:4, D:5 and the United Arab Emirates. There is a case-by-case license review policy for license applications for exports of commodities with a TPP (as defined in Technical Note 2 to 3A090.a and 3A090.b) less than 21,000, and a 'total DRAM bandwidth' (as defined in the notes to paragraph (dd)(1) in supplement no. 2 to part 748) less than 6,500 GB/s, when destined to end-users located in China or Macau, provided the applicant provides the additional information described in supplement no. 2 to part 748 under paragraph (dd).”

§ 742.6(b)(10)(iii)(A)(2), p. 28

In force

“(A)(1) Policy for Country Group D:5 and Macau. There is a case-by-case license review policy for license applications for exports of commodities with a TPP (as defined in Technical Note 2 to 3A090.a and 3A090.b) less than 21,000, and a 'total DRAM bandwidth' (as defined in the notes to paragraph (dd)(1) in supplement no. 2 to part 748) less than 6,500 GB/s, when destined to end-users located in China or Macau, provided the applicant provides the additional information described in supplement no. 2 to part 748 under paragraph (dd).”

15 CFR 742.6(b)(10)(iii)(A)(1)

The sentence that sets a case-by-case review for commodities under 21,000 TPP and 6,500 GB/s of total DRAM bandwidth destined to end users in China or Macau is the same word for word; in force it belongs to § 742.6(b)(10)(iii)(A)(1), the policy for Country Group D:5 and Macau, and in the released text to (A)(2), the policy for Country Groups D:1, D:4, D:5 and the United Arab Emirates.

The presumption of denial for Macau and Country Group D:5

Operative text

“All other applications for exports, reexports, or transfers (in-country) to or within Country Group D:5 and Macau or for an entity headquartered or with an ultimate parent headquartered in Country Group D:5 or Macau will be reviewed under a presumption of denial.”

§ 742.6(b)(10)(iii)(A)(2), p. 28

In force

“All other applications for exports, reexports, or transfers (in-country) will be reviewed under a presumption of denial to or within Macau or destinations specified in Country Group D:5 or to an entity headquartered in, or whose ultimate parent company is headquartered in, either Macau or a destination specified in Country Group D:5.”

15 CFR 742.6(b)(10)(iii)(A)(1)

The text in force applies the presumption of denial to all other applications to or within Macau or Country Group D:5 or to an entity headquartered, or with an ultimate parent company headquartered, in either; the released text applies it to all other applications to or within them or for such an entity.

An application that meets more than one review policy

Operative text

“All other applications to or within destinations specified in Country Groups D:1 and D:4 (excluding any destinations also specified in Country Groups A:5 or A:6) and the United Arab Emirates will be reviewed under a presumption of approval.”

§ 742.6(b)(10)(iii)(A)(2), p. 28

Operative text

“If the license application meets the criteria of more than one licensing policy, then this licensing policy and its requirements will be applied.”

§ 742.6(b)(10)(iii)(A)(2), p. 28

In force

“If the license application meets the criteria of more than one licensing policy, then this licensing policy and its requirements will be applied.”

15 CFR 742.6(b)(10)(iii)(A)(1)

The sentence is the same word for word; in force it closes the policy for Country Group D:5 and Macau, and in the released text it closes the policy for Country Groups D:1, D:4, D:5 and the United Arab Emirates, after a presumption of approval for all other applications to or within Country Groups D:1 and D:4 outside A:5 and A:6 and the United Arab Emirates.

The items in § 744.23(a)(3)(i)(A)

Operative text

“Any item subject to the EAR and specified in ECCN 3A001.z; 3A090 (except for 3A090.c); 4A003.z; 4A004.z; 4A005.z; 4A090; 5A002.z; 5A004.z; 5A992.z, 5D002.z; 5D992.z destined to any destination other than those specified in Country Groups D:1, D:4, or D:5 (excluding any destination also specified in Country Groups A:5 or A:6) for an entity that is headquartered in, or whose ultimate parent company is headquartered in, either Macau or a destination specified in Country Group D:5”

§ 744.23(a)(3)(i)(A), p. 32

In force

“Any item subject to the EAR and specified in ECCN 3A001.z.1.b, z.2.b, z.3.b, z.4.b; 3A090.b; 4A003.z.1.b, z.2.b; 4A004.z.2; 4A005.z.2; 4A090.b; 5A002.z.1.b, z.2.b, z.3.b, z.4.b, z.5.b; 5A004.z.1.b, z.2.b; 5A992.z.2, 5D002.z.1.b, z.2.b, z.3.b, z.4.b, z.5.b, z.6.b, z.7.b, z.8.b, and z.9.b; 5D992.z.2 destined to any destination other than those specified in Country Groups D:1, D:4, or D:5 (excluding any destination also specified in Country Groups A:5 or A:6) for an entity that is headquartered in, or whose ultimate parent company is headquartered in, either Macau or a destination specified in Country Group D:5”

15 CFR 744.23(a)(3)(i)(A)

The text in force lists 3A090.b, 4A090.b and the .b or .2 subparagraphs of the .z entries; the released text lists 3A090 other than 3A090.c, 4A090 and the .z entries without subparagraphs, with the same destinations and the same condition on where the entity or its ultimate parent company is headquartered.

Foundries and packagers in § 744.23(a)(3)(i)(C)

Operative text

“(C) An “applicable advanced logic integrated circuit” that is subject to the EAR, specified in 3A090.a, designed by a company that is neither an approved IC designer (specified in supplement no. 6 to part 740) nor an authorized IC designer (as described in Note 1 to 3A090.a), and exported, exported from abroad, reexported, or transferred (in-country) by a “front end fabricator” or “OSAT” to or within any destination.”

§ 744.23(a)(3)(i)(C), p. 32

In force

“(B) Any item subject to the EAR and specified in ECCN 3A090.c destined to any destination other than Macau or those specified in Country Group D:5, for an entity that is headquartered in, or whose ultimate parent company is headquartered in, either Macau or a destination specified in Country Group D:5.”

15 CFR 744.23(a)(3)(i)(B)

In force, § 744.23(a)(3)(i) ends at (B), on 3A090.c; the released text adds (C), which covers an applicable advanced logic integrated circuit in 3A090.a designed by a company that is neither an approved nor an authorised IC designer, when a front-end fabricator or OSAT exports it, exports it from abroad, reexports it or transfers it in-country, to or within any destination.

The destinations in § 740.2(a)(9)(ii)

Operative text

“is being exported, reexported, or transferred (in-country) to or within a destination specified in § 742.6(a)(6)(iii)(A), excluding the United Arab Emirates, or to an entity headquartered in or whose ultimate parent company is headquartered in, Macau or a destination specified in Country Group D:5, wherever located,”

§ 740.2(a)(9)(ii), p. 24

In force

“is being exported, reexported, or transferred (in-country) to or within a destination specified in Country Group D:1, D:4, or D:5, excluding any destination also specified in Country Groups A:5 or A:6, or to an entity headquartered in or whose ultimate parent is headquartered in, Macau or a destination specified in Country Group D:5, wherever located,”

15 CFR 740.2(a)(9)(ii)

In force, the destinations in § 740.2(a)(9)(ii) are Country Groups D:1, D:4 and D:5 outside A:5 and A:6; in the released paragraph they are the destinations of § 742.6(a)(6)(iii)(A) other than the United Arab Emirates, and both paragraphs also name an entity headquartered, or with an ultimate parent headquartered, in Macau or Country Group D:5, wherever located.

License Exception ACA

Operative text

“and the license exception is other than: TMP, restricted to eligibility under the provisions of § 740.9(a)(6); NAC/ACA, under the provisions of § 740.8;”

§ 740.2(a)(9)(ii), p. 24

In force

“and the license exception is other than: TMP, restricted to eligibility under the provisions of § 740.9(a)(6); NAC/ACA, under the provisions of § 740.8;”

15 CFR 740.2(a)(9)(ii)

In force

“License Exception ACA authorizes the export, reexport, and transfer (in-country) of any item classified in ECCN 3A090 (except for 3A090.c), 4A090, 3A001.z, 4A003.z, 4A004.z, 4A005.z, 5A002.z, 5A004.z, 5A992.z, 5D002.z, or 5D992.z, except for items designed or marketed for use in a datacenter and meeting the parameters of 3A090.a, to or within any destination worldwide (except Macau, a destination specified in Country Group D:5, or an entity headquartered in, or whose ultimate parent is headquartered in, Macau or a destination specified in Country Group D:5, wherever located), as well as transfers (in-country) within Macau and destinations specified in Country Group D:5.”

15 CFR 740.8(a)

The released text does not amend § 740.8 and keeps NAC/ACA in the list in § 740.2(a)(9)(ii); in force, § 740.8 authorises ACA for the items it lists, other than items designed or marketed for use in a data centre and meeting the parameters of 3A090.a, to or within any destination worldwide except Macau, Country Group D:5 and an entity headquartered, or with an ultimate parent headquartered, in either, and for transfers in-country within Macau and Country Group D:5.

The chip designer’s location in Note 1 to 3A090.a

Operative text

“b. If the integrated circuit designer is neither located in nor has an ultimate parent headquartered in a destination specified in Country Groups D;1, D:4, or D:5 of supplement no. 1 to part 740 of the EAR or in paragraph (a)(6)(iii)(A)(1) of § 742.6, and if the integrated circuit die is packaged by the “front-end fabricator” at a location outside of Macau or a destination specified in Country Group D:5 in supplement no. 1 to part 740,”

Note 1 to 3A090.a, paragraph b., p. 78

Operative text

“c. If the integrated circuit designer is neither located in nor have an ultimate parent headquartered in a destination specified in Country Groups D;1, D:4, or D:5 of supplement no. 1 to part 740 of the EAR or in paragraph (a)(6)(iii)(A)(1) of § 742.6, and if the integrated circuit is packaged by an approved “OSAT” company listed in supplement no. 7 to part 740 of the EAR,”

Note 1 to 3A090.a, paragraph c., p. 78

In force

“b. If the integrated circuit die is packaged by the “front-end fabricator” at a location outside of Macau or a destination specified in Country Group D:5 in supplement no. 1 to part 740,”

Note 1 to 3A090.a, paragraph b.

In force

“c. If the integrated circuit is packaged by an approved “OSAT” company listed in supplement no. 7 to part 740 of the EAR,”

Note 1 to 3A090.a, paragraph c.

The released text opens paragraphs b. and c. of the note with a condition that the integrated circuit designer is neither located in nor has an ultimate parent headquartered in Country Groups D:1, D:4 or D:5 or a destination in § 742.6(a)(6)(iii)(A)(1); in force, the two paragraphs open with where the die is packaged and with packaging by an approved OSAT company.

License Exceptions AIA and LPP

Operative text

“6. Remove and reserve § 740.27. 7. Remove and reserve § 740.29.”

Amendatory instructions 6 and 7, p. 25

In force

“§ 740.27 License Exception Artificial Intelligence Authorization (AIA).”

15 CFR 740.27

In force

“§ 740.29 License Exception Low Processing Performance (LPP).”

15 CFR 740.29

The released text removes and reserves §§ 740.27 and 740.29, which hold License Exceptions AIA and LPP in the text in force.

Supplement no. 5 to part 740 and supplement no. 10 to part 748

Operative text

“8. Remove and reserve supplement no. 5 to part 740—Artificial Intelligence Authorization Countries.”

Amendatory instruction 8, p. 25

Operative text

“22. Remove supplement no. 10 to part 748.”

Amendatory instruction 22, p. 42

In force

“Supplement No. 5 to Part 740—Artificial Intelligence Authorization Countries”

Supplement No. 5 to Part 740

In force

“Supplement No. 10 to Part 748—Data Center VEU Authorization Guidelines”

Supplement No. 10 to Part 748

The released text removes and reserves supplement no. 5 to part 740 and removes supplement no. 10 to part 748; both are in the text in force.

ECCN 4E091 and the model weights rule in § 734.9(l)

Operative text

“3. Amend § 734.9 by removing paragraph (l).”

Amendatory instruction 3, p. 24

Operative text

“28. Amend supplement no. 1 to part 774 by: a. Revising ECCNs 3A001, 3A090, 3D001, 3E001, 4A003, 4A004, 4A005, 4A090, 4D001, 4D090, 4E001; b. Removing ECCN 4E091;”

Amendatory instruction 28, p. 44

In force

“(l) AI Model weights FDP rule.”

15 CFR 734.9(l)

In force

“4E091 'Parameters' for an artificial intelligence model trained utilizing 10^26 or more 'operations.'”

ECCN 4E091

The released text removes paragraph (l) of § 734.9 and ECCN 4E091; both are in the text in force.

Red Flag 28 and § 748.3(f) on artificial intelligence models

Operative text

“2. Amend supplement no. 3 to part 732 by removing and reserving paragraph 28 under “Red Flags.””

Amendatory instruction 2, p. 23

Operative text

“18. Amend § 748.3 by removing paragraph (f).”

Amendatory instruction 18, p. 37

In force

“28. You will be providing Infrastructure-as-a-Service (IaaS) products or services, or other computing products or services, to assist in training an AI model with model weights captured by ECCN 4E091 for an entity headquartered, or whose ultimate parent is headquartered, in any destination other than those listed in paragraph (a) of supplement no. 5 to part 740 of the EAR.”

Supplement No. 3 to Part 732, Red Flag 28

In force

“(f) Classification requests for artificial intelligence models.”

15 CFR 748.3(f)

The released text removes and reserves paragraph 28 under Red Flags in supplement no. 3 to part 732 and removes paragraph (f) of § 748.3; both are in the text in force.

Paragraphs in force that cite § 742.6(b)(10)(iii)(A)(1)

Operative text

“(1) License review policy for paragraph (a)(6)(iii)(A)(1). Applications for exports, reexports, and transfers (in-country) will be reviewed on a case-by-case basis to determine whether the transaction is contrary to the national security or foreign policy interests of the United States, to include the effectiveness of a destination’s export control regimes and coordination with BIS on the enforcement of export controls.”

§ 742.6(b)(10)(iii)(A)(1), p. 28

Operative text

“(2) Policy for Country Groups D:1, D:4, D:5 and the United Arab Emirates. There is a case-by-case license review policy for license applications for exports of commodities with a TPP (as defined in Technical Note 2 to 3A090.a and 3A090.b) less than 21,000, and a 'total DRAM bandwidth' (as defined in the notes to paragraph (dd)(1) in supplement no. 2 to part 748) less than 6,500 GB/s, when destined to end-users located in China or Macau, provided the applicant provides the additional information described in supplement no. 2 to part 748 under paragraph (dd).”

§ 742.6(b)(10)(iii)(A)(2), p. 28

In force

“(iii) For items specified in paragraph (a)(3)(i)(A) of this section that meet the criteria for case-by-case license review under § 742.6(b)(10)(iii)(A)(1); or”

15 CFR 744.23(d)(3)(iii)

In force

“(1) Certification. To qualify for the case-by-case licensing policy under § 742.6(b)(10)(iii)(A)(1), for commodities with a TPP less than 21,000, and a 'total DRAM bandwidth' less than 6,500 GB/s”

Supplement No. 2 to Part 748, paragraph (dd)(1)

Section 744.23(d)(3)(iii) and paragraph (dd)(1) of supplement no. 2 to part 748, which the released text does not amend, cite § 742.6(b)(10)(iii)(A)(1) for the case-by-case review below 21,000 TPP and 6,500 GB/s; the released text moves that review to (A)(2) and gives (A)(1) to the review of applications for Indonesia, Malaysia, Singapore, Brazil and Thailand.

Within the released text

A significant volume of compute beside 12,000,000 aggregate TPP

Summary

“First, this rule establishes new restrictions which will apply for exports, reexports, or transfers (in-country) to overseas data centers that remotely supply significant volumes of compute to companies headquartered in Country Group D:5 or Macau.”

Summary, p. 1

Preamble

“when there is “knowledge” the items are destined for use in data centers, wherever located, that will provide direct or indirect access to a significant volume of computing power to or for an entity headquartered in, or whose ultimate parent company is headquartered in, Macau or destination specified in Country Group D:5.”

Preamble, p. 4

Operative text

“Any data center providing significant volume of compute power to companies headquartered, or with an ultimate parent headquartered, in Macau or Country Group D:5 prior to the publication date of this rule that wishes to continue providing these services must obtain a license with 90 days of the effective date of this IFR or face future export restrictions.”

§ 744.24(b)(3), p. 36

Operative text

“without a license if you have “knowledge” at the time of the export, reexport, or transfer (in-country) that the item is destined to a data center to or within any destination worldwide that is providing or will provide access to more than 12,000,000 “aggregate TPP” either at one data center or through ‘linked data centers’ to or for companies headquartered in, or whose ultimate parent company is headquartered in, Macau or a destination specified in Country Group D:5 in supplement no. 1 to part 740 of the EAR.”

§ 744.24(a)(1), p. 33

The passages quoted from the summary, the preamble and § 744.24(b)(3) speak of a significant volume of compute without a figure; § 744.24(a)(1) speaks of access to more than 12,000,000 aggregate TPP, as does the preamble on page 8.

Where the data centre is

Summary

“First, this rule establishes new restrictions which will apply for exports, reexports, or transfers (in-country) to overseas data centers that remotely supply significant volumes of compute to companies headquartered in Country Group D:5 or Macau.”

Summary, p. 1

Preamble

“when there is “knowledge” the items are destined for use in data centers, wherever located, that will provide direct or indirect access to a significant volume of computing power to or for an entity headquartered in, or whose ultimate parent company is headquartered in, Macau or destination specified in Country Group D:5.”

Preamble, p. 4

Preamble

“Exporters, reexporters, and transferors are encouraged to examine both end-use controls in § 744.23(a)(3) and in new § 744.24 to the extent their transactions involve exports, reexports, or transfers to data centers outside of the United States where there is knowledge that a company headquartered in, or whose ultimate parent is headquartered in, Macau or D:5 will be an intended remote end user.”

Preamble, p. 13

Operative text

“without a license if you have “knowledge” at the time of the export, reexport, or transfer (in-country) that the item is destined to a data center to or within any destination worldwide that is providing or will provide access to more than 12,000,000 “aggregate TPP” either at one data center or through ‘linked data centers’ to or for companies headquartered in, or whose ultimate parent company is headquartered in, Macau or a destination specified in Country Group D:5 in supplement no. 1 to part 740 of the EAR.”

§ 744.24(a)(1), p. 33

The summary says overseas data centres, and the preamble says data centres wherever located in one passage and data centres outside of the United States in another; § 744.24(a)(1) says a data centre to or within any destination worldwide.

Access for a commercial recommender system

Summary

“The license requirement will not apply to commercial recommender systems, such as those used by online retailers or social media companies, as these functions do not pose the same national security threat.”

Summary, p. 1

Preamble

“Bona fide operators of data centers who are otherwise engaged in activities consistent with the EAR and were providing remote access used for ‘commercial recommender systems’ (as defined in the new § 744.24(d)(1)) may continue providing these services for 90 days, but must obtain a license following expiration of this period to continue these services.”

Preamble, p. 14

Operative text

“The prohibitions under this section do not apply when the computing power access is only being provided for a ‘commercial recommender system’ and you submit the following information to https://www.bis.gov/ai/exclusionnotesubmission, which will be shared with the End User Review Committee.”

§ 744.24(b)(2), p. 35

The summary excludes commercial recommender systems from the licence requirement and § 744.24(b)(2) excludes access provided only for one, on condition of a submission to BIS; the preamble says bona fide operators of data centres that were providing remote access used for commercial recommender systems may continue for 90 days and must then obtain a licence to continue.

Who is told to carry out due diligence

Summary

“Data centers, foreign foundries, and chip exporters are required to perform robust due diligence on their customers, including any direct or indirect ownership or control by persons in Country Group D:5 or Macau, as part of complying with this new control.”

Summary, p. 1

Preamble

“Note 3 to paragraph (a)(1) describes due diligence expectations imposed on “U.S. persons” and foreign data centers to ensure compliance with these controls.”

Preamble, p. 10

Operative text

“To satisfy the requirement that you do not have “knowledge” for purposes of this paragraph, you will be expected to obtain and be able to provide sufficient information from the foreign data center regarding that data center’s “know your customer” due diligence checks.”

Note 3 to § 744.24(a)(1), p. 34

The summary requires due diligence of data centres, foreign foundries and chip exporters, and the preamble says Note 3 places expectations on U.S. persons and foreign data centres; Note 3 addresses the person exporting, reexporting or transferring the items, who is expected to obtain information from the foreign data centre on that data centre’s know-your-customer checks.

Ownership or control beside headquarters

Preamble

“Foreign data centers will be expected to perform robust due diligence on their customers to identify direct or indirect ownership or control by Country Group D:5 or Macau persons. This diligence will ensure that companies cannot circumvent new controls through corporate restructurings or spinoffs.”

Preamble, p. 10

Operative text

“Such diligence checks will include diligence on whether any data center customers are subject to direct or indirect ownership or control by persons located in, headquartered in, or whose ultimate parent is headquartered in, Macau or a destination specified in Country Group D:5.”

Note 3 to § 744.24(a)(1), p. 34

Operative text

“without a license if you have “knowledge” at the time of the export, reexport, or transfer (in-country) that the item is destined to a data center to or within any destination worldwide that is providing or will provide access to more than 12,000,000 “aggregate TPP” either at one data center or through ‘linked data centers’ to or for companies headquartered in, or whose ultimate parent company is headquartered in, Macau or a destination specified in Country Group D:5 in supplement no. 1 to part 740 of the EAR.”

§ 744.24(a)(1), p. 33

Note 3 asks for diligence on direct or indirect ownership or control of customers by persons located, headquartered or with an ultimate parent headquartered in Macau or Country Group D:5, and the preamble speaks of ownership or control by persons of those places; § 744.24(a)(1) sets the licence requirement by where the companies to or for which access is provided, or their ultimate parent companies, are headquartered.

Companies beside an entity

Preamble

“when there is “knowledge” the items are destined for use in data centers, wherever located, that will provide direct or indirect access to a significant volume of computing power to or for an entity headquartered in, or whose ultimate parent company is headquartered in, Macau or destination specified in Country Group D:5.”

Preamble, p. 4

Preamble

“The term “for an entity” as used in this § 744.24(a)(1) applies to instances in which there is “knowledge” that a data center is providing remote access to a non-D:5 customer that is in turn training SI models for, or participating in the training of SI models for, or providing SI models to a D:5 company.”

Preamble, p. 8

Operative text

“without a license if you have “knowledge” at the time of the export, reexport, or transfer (in-country) that the item is destined to a data center to or within any destination worldwide that is providing or will provide access to more than 12,000,000 “aggregate TPP” either at one data center or through ‘linked data centers’ to or for companies headquartered in, or whose ultimate parent company is headquartered in, Macau or a destination specified in Country Group D:5 in supplement no. 1 to part 740 of the EAR.”

§ 744.24(a)(1), p. 33

The preamble describes access to or for an entity and explains the phrase for an entity as used in § 744.24(a)(1); § 744.24(a)(1) says to or for companies, and the word entity does not occur in § 744.24.

A change of end use after the chips arrive

Preamble

“This requirement, provided in new paragraph (e) of § 744.24, and described in more detail further in this section, is triggered if there is a change in end-use of the items described in paragraph (a)(1) of § 744.24. In the event of such a change, a BIS authorization may be required.”

Preamble, p. 9

Preamble

“Changes in end-use from a non-prohibited end-use to a prohibited end-use under paragraphs (a)(1) are considered a “transfer (in-country)” for purposes of paragraphs (a)(1) or (2) and require an EAR authorization under § 744.24.”

Preamble, p. 12

Operative text

“The notification from the exporter, reexporter, or transferor must also specify that the transferor, e.g., the data center operator, must obtain authorization for this change in end-use.”

§ 744.24(e), p. 37

In force

“Except as set forth in § 734.18(a)(3), a Transfer (in-country) is a change in end use or end user of an item within the same foreign country. Transfer (in-country) is synonymous with In-country transfer.”

15 CFR 734.16

The preamble says first that a BIS authorisation may be required on a change of end use and later that a change from a non-prohibited to a prohibited end use is considered a transfer (in-country) and requires authorisation; § 744.24(e) requires the notice from the exporter, reexporter or transferor to say that the transferor, for example the data centre operator, must obtain authorisation for the change, and § 734.16 in force defines a transfer (in-country) as a change in end use or end user within the same foreign country.

What the exporter’s notice must say

Preamble

“the exporter, reexporter, or transferor must inform the recipient that BIS authorization is required if the item will be transferred in-country; and that the recipient must follow the know-your-customer guidance in supplement no. 3 Part 732 of the EAR.”

Preamble, p. 12

Operative text

“the exporter, reexporter, or transferor must inform the recipient that a BIS authorization is required if the item or items will be used at a data center to provide access to more than 12,000,000 “aggregate TPP” either at one data center or through ‘linked data centers’ to or for companies headquartered in, or whose ultimate parent company is headquartered in, Macau or a destination specified in Country Group D:5 in supplement no. 1 to part 740 of the EAR.”

§ 744.24(e), p. 37

Operative text

“The notification from the exporter, reexporter, and transferor must also specify that the transferor must follow the know-your-customer guidance in supplement no. 3 Part 732 of the EAR.”

§ 744.24(e), p. 37

The preamble says the notice tells the recipient that authorisation is required if the item will be transferred in-country and that the recipient must follow the know-your-customer guidance; § 744.24(e) says it tells the recipient that authorisation is required if the items will be used at a data centre to provide access to more than 12,000,000 aggregate TPP to or for companies headquartered, or with an ultimate parent company headquartered, in Macau or Country Group D:5, and that the transferor must follow that guidance.

A data centre that was already providing the compute before publication

Operative text

“Any data center providing significant volume of compute power to companies headquartered, or with an ultimate parent headquartered, in Macau or Country Group D:5 prior to the publication date of this rule that wishes to continue providing these services must obtain a license with 90 days of the effective date of this IFR or face future export restrictions.”

§ 744.24(b)(3), p. 36

Operative text

“without a license if you have “knowledge” at the time of the export, reexport, or transfer (in-country) that the item is destined to a data center to or within any destination worldwide that is providing or will provide access to more than 12,000,000 “aggregate TPP” either at one data center or through ‘linked data centers’ to or for companies headquartered in, or whose ultimate parent company is headquartered in, Macau or a destination specified in Country Group D:5 in supplement no. 1 to part 740 of the EAR.”

§ 744.24(a)(1), p. 33

Section 744.24(b)(3) requires a data centre that was providing a significant volume of compute to companies headquartered, or with an ultimate parent headquartered, in Macau or Country Group D:5 before publication, and wishes to continue, to obtain a licence or face future export restrictions; § 744.24(a)(1) attaches the licence requirement to the export, reexport or transfer (in-country) of the items.

The prohibition that no licence exception overcomes

Preamble

“As described under § 744.24(b), no license exceptions may overcome the prohibition described in paragraph (a)(2) of § 744.24, except when noted by BIS.”

Preamble, p. 10

Operative text

“No license exceptions may overcome the prohibition described in paragraph (a) of this section, except as noted by BIS when a destination is designated under paragraphs (3) of this section.”

§ 744.24(b)(1), p. 35

The preamble says no licence exception may overcome the prohibition in paragraph (a)(2) of § 744.24, except when noted by BIS; § 744.24(b)(1) says the prohibition in paragraph (a), except as noted by BIS when a destination is designated under paragraphs (3) of the section.

Adding countries to the licence requirement

Summary

“Second, in addition to the current license requirements for advanced semiconductors, a license will be required to export, reexport, or transfer (in-country) advanced semiconductors to Indonesia, Malaysia, Singapore, Thailand, or Brazil (and any additional country designated by the Secretary of Commerce, in consultation with the Secretary of State or the Assistant to the President for National Security Affairs) – countries which present a higher-than-normal risk of diversion.”

Summary, p. 1

Operative text

“for exports, reexports, and transfers (in-country) to or within the destinations specified under paragraphs (a)(6)(iii)(A)(1)-(2). (1) Indonesia, Malaysia, Singapore, Brazil, and Thailand.”

§ 742.6(a)(6)(iii)(A) and (A)(1), p. 27

Operative text

“The Secretary of State or the Assistant to the President for National Security Affairs may notify the Secretary of Commerce that a certain destination is at high risk of use in, or diversion to, the activities specified in paragraph (a)(1) of this section. Within 10 days of receipt of such notice, the Secretary of Commerce shall, if he deems it appropriate, inform persons, either individually by specific notice or through amendment to the EAR, that a license is required for the export, reexport, or transfer (in-country) of specific items to that destination.”

§ 744.24(a)(2), p. 35

The summary adds to Indonesia, Malaysia, Singapore, Thailand and Brazil any additional country designated by the Secretary of Commerce in consultation with the Secretary of State or the Assistant to the President for National Security Affairs; § 742.6(a)(6)(iii)(A)(1) lists those countries by name, and under § 744.24(a)(2), on notice from either official that a destination is at high risk of use in or diversion to the activities in § 744.24(a)(1), the Secretary of Commerce, if he deems it appropriate, informs persons that a licence is required for specific items to that destination.

What a linked data centre is

Preamble

“‘Linked data centers’ are data centers that use networking infrastructure that links two or more separate data centers together to allow physical and virtual facilities to share resources, balance workloads, and replicate data as a unified whole.”

Preamble, p. 8

Preamble

“For purposes of § 744.24, ‘linked data center’ means a data center that uses networking infrastructure that links two or more separate data centers together that allows physical and virtual facilities to share resources, balance workloads, and replicate data as a unified whole. This includes digitally-linked infrastructure, not just physically-linked infrastructure.”

Preamble, p. 11

Operative text

“For purposes of this section, a ‘linked data center’ means a data center that uses networking infrastructure that links two or more separate data centers together, through digitally-linked or physically-linked infrastructure, that allows physical and virtual facilities to share resources, balance workloads, and replicate data as a unified whole. ‘Linked data center’ includes digitally-linked infrastructure, not just physically-linked infrastructure.”

§ 744.24(d)(2), p. 36

The preamble first defines linked data centres in the plural, as data centres that use networking infrastructure linking two or more separate data centres together; its second definition and § 744.24(d)(2) define a linked data centre in the singular, as a data centre that uses networking infrastructure that links two or more separate data centres, and § 744.24(d)(2) adds through digitally-linked or physically-linked infrastructure.

The exclusion for a headquarters in the United States

Summary

“The license requirement for these five countries will not apply to semiconductors destined to companies headquartered in, or whose ultimate parent company is headquartered in, the United States, provided certain reporting requirements are met.”

Summary, p. 2

Operative text

“Note 1 to paragraph (a)(6)(iii)(A)(1): The license requirements in this paragraph (a)(6)(iii)(A)(1) do not apply to exports, reexports, and transfers (in-country) to an ultimate consignee or end user headquartered in, or whose ultimate parent company is headquartered in, the United States, provided the exporter, reexporter, or transferor follows the reporting requirements in § 743.10 Reporting Requirements to Qualify for Exclusion from Certain Regional Stability License Requirements.”

Note 1 to § 742.6(a)(6)(iii)(A)(1), p. 27

The summary excludes semiconductors destined to companies headquartered, or with an ultimate parent company headquartered, in the United States, provided certain reporting requirements are met; Note 1 to § 742.6(a)(6)(iii)(A)(1) excludes exports, reexports and transfers (in-country) to an ultimate consignee or end user so headquartered, provided the exporter, reexporter or transferor follows the reporting requirements in § 743.10.

Advanced node beside advanced logic

Preamble

“Finally, § 744.23(a)(3)(i)(C) is added to create a license requirement for “applicable advanced node integrated circuits” that are subject to the EAR, specified in 3A090.a, designed by a company that is neither an approved IC designer (specified in supplement no. 6 to part 740) or an authorized IC designer (as described in Note 1 to 3A090.a), and exported, exported from abroad, reexported, or transferred (in-country) by a “front end fabricator” or “OSAT” to or within any destination.”

Preamble, p. 14

Operative text

“(C) An “applicable advanced logic integrated circuit” that is subject to the EAR, specified in 3A090.a, designed by a company that is neither an approved IC designer (specified in supplement no. 6 to part 740) nor an authorized IC designer (as described in Note 1 to 3A090.a), and exported, exported from abroad, reexported, or transferred (in-country) by a “front end fabricator” or “OSAT” to or within any destination.”

§ 744.23(a)(3)(i)(C), p. 32

The preamble describes the requirement added as § 744.23(a)(3)(i)(C) as one for applicable advanced node integrated circuits; § 744.23(a)(3)(i)(C) says an applicable advanced logic integrated circuit.

Destinations also in Country Groups A:5 or A:6

Operative text

“(2) A destination in Country Groups D:1, D:4, or D:5 (excluding destinations also specified in Country Groups A:5 or A:6) or the United Arab Emirates, except that a license is not required when the ultimate consignee and all end users are approved entities in the United Arab Emirates listed in supplement no. 8 to part 740 and specified as approved to receive the items covered by this paragraph.”

§ 742.6(a)(6)(iii)(A)(2), p. 27

Operative text

“b. If the integrated circuit designer is neither located in nor has an ultimate parent headquartered in a destination specified in Country Groups D;1, D:4, or D:5 of supplement no. 1 to part 740 of the EAR or in paragraph (a)(6)(iii)(A)(1) of § 742.6, and if the integrated circuit die is packaged by the “front-end fabricator” at a location outside of Macau or a destination specified in Country Group D:5 in supplement no. 1 to part 740,”

Note 1 to 3A090.a, paragraph b., p. 78

Operative text

“c. If the integrated circuit designer is neither located in nor have an ultimate parent headquartered in a destination specified in Country Groups D;1, D:4, or D:5 of supplement no. 1 to part 740 of the EAR or in paragraph (a)(6)(iii)(A)(1) of § 742.6, and if the integrated circuit is packaged by an approved “OSAT” company listed in supplement no. 7 to part 740 of the EAR,”

Note 1 to 3A090.a, paragraph c., p. 78

Section 742.6(a)(6)(iii)(A)(2) excludes destinations also in Country Groups A:5 or A:6 from Country Groups D:1, D:4 and D:5; the designer condition in paragraphs b. and c. of Note 1 to 3A090.a names Country Groups D:1, D:4 and D:5 without that exclusion, and of § 742.6 it cites paragraph (a)(6)(iii)(A)(1) alone.

The tense and preposition of the prohibition

Preamble

“You may not knowingly export, reexport, or transfer (in-county) items specified in paragraph (a) of § 744.24 for use in a data center to or within any destination worldwide that will provide access to more than 12,000,000 “aggregate TPP” (either at one data center or through ‘linked data centers’ (including digitally-linked infrastructure, not just physically-linked infrastructure) to companies headquartered in, or whose ultimate parent company is headquartered in, Macau or a destination specified in Country Group D:5 in supplement no. 1 to part 740 of the EAR.”

Preamble, p. 8

Operative text

“without a license if you have “knowledge” at the time of the export, reexport, or transfer (in-country) that the item is destined to a data center to or within any destination worldwide that is providing or will provide access to more than 12,000,000 “aggregate TPP” either at one data center or through ‘linked data centers’ to or for companies headquartered in, or whose ultimate parent company is headquartered in, Macau or a destination specified in Country Group D:5 in supplement no. 1 to part 740 of the EAR.”

§ 744.24(a)(1), p. 33

The preamble’s restatement of the prohibition on page 8 speaks of a data centre that will provide access to companies headquartered, or with an ultimate parent company headquartered, in Macau or Country Group D:5; § 744.24(a)(1) speaks of one that is providing or will provide access to or for them.

Method

The page quotes the text Commerce released on 16 Nov 2026: 132 pages, in a file whose SHA-256 begins 8329860e901198e9. Page numbers are that file’s. Quotations of the released text were cut from that file by a script, and quotations of the text in force from the Electronic Code of Federal Regulations.

Each sentence about what the rule requires was written from the passages it names and then checked against them by a second reader who had not seen the first’s work. A sentence prints only where that reading supports it.

The text in force is the Electronic Code of Federal Regulations as issued on 9 Nov 2026.

A chip’s total processing performance is computed from its datasheet figures as the technical notes to ECCN 3A090 define it. The number of chips that exceed 12,000,000 is that figure divided into 12,000,000, rounded down, plus one.