Operational; Institute of Information Science is recorded as the hosting centre, and no source here establishes who holds or runs the site
Vega is hosted at IZUM (Institut informacijskih znanosti) in Maribor, the first EuroHPC system delivered. GPU partition: 60 nodes × 4× NVIDIA A100 = 240 A100 GPUs. EuroHPC-published peak 10.05 PFLOPS FP64. Atos BullSequana XH2000.
Source: EuroHPC Joint Undertaking
Dates in site records: Apr 20, 2021 – Apr 20, 2024. Site data: EuroHPC Joint Undertaking.
Ownership and operation
Hosting centre Institute of Information Science. The organisation's own statement states that the site hosts the system. “Commissioned as the primary supercomputer system of the Slovenian national research infrastructures upgrade project “HPC RIVR” and delivered as the first of EuroHPC Joint Undertaking systems, Vega is hosted at the Institute of Information Science – IZUM in Maribor.” source
Recorded operator attribution withheld Institute of Information Science. The cited source does not establish that this organisation operates the site. “Commissioned as the primary supercomputer system of the Slovenian national research infrastructures upgrade project “HPC RIVR” and delivered as the first of EuroHPC Joint Undertaking systems, Vega is hosted at the Institute of Information Science – IZUM in Maribor.” source
Recorded owner attribution withheld EuroHPC JU. The cited source does not establish that this organisation holds title to the site. “Commissioned as the primary supercomputer system of the Slovenian national research infrastructures upgrade project “HPC RIVR” and delivered as the first of EuroHPC Joint Undertaking systems, Vega is hosted at the Institute of Information Science – IZUM in Maribor.” source
Export controls and government links
No export-control designations were found in the checked company chains.
Headquarters jurisdiction
A company in the ownership chain is headquartered in SI
This headquarters jurisdiction has no classification in the export-control regime table.
Capacity
Power capacity
No power figure is recorded for this site.
Power for IT equipment
Accelerators
Methods and sources
Ownership roles
Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility.
Each role requires its own attribution. An operator named in a source supplies evidence of operation only.
Parent companies
Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented.
Level 1 identifies a company at the site, level 2 its parent, and each further level another parent. Export-control designations and government investments are assigned to the company concerned.
Missing values
Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.
Publication limits
Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld.
Related analysis
- Vega (EuroHPC) on the global mapOpens the map at this site’s pin, among the facilities around it.
- Vega (EuroHPC) in the threshold comparisonEach listed site’s estimated compute against regulatory training thresholds, or the reason no estimate is admitted.
- Allied coordination: Ownership chain incompletely recordedThe Allied Coordination Gap Analyzer lists this site under that class of ownership chain.
Browse the facilities directory.