EuroHPCOperational HPC centre, Barcelona, Spain

1,000 km
1,000 km
Barcelona, Spain

MareNostrum 5 is hosted by BSC-CNS at the Torre Girona chapel (UPC Nord campus, Plaça Eusebi Güell 1-3). Total peak 314 PFLOPS FP64 across partitions: General Purpose (Intel Sapphire Rapids, 6,408 nodes, 45.9 PFLOPS), Accelerated (1,120 nodes × 4× NVIDIA Hopper H100 = 4,480 H100, 260 PFLOPS), General Purpose Next-Gen (NVIDIA Grace), and Accelerated Next-Gen (NVIDIA GB200 partition added 2025). Bull SAS / Lenovo procurement.

From EuroHPC Joint Undertaking.

Companies and export controls

This record names as , but the cited source does not establish that this organisation operates the site.

This record names as , but the cited source does not establish that this organisation holds title to the site.

  1. This site
  2. Parent ownership unresolved
  1. This site
  2. Named on the record
  3. Parent ownership unresolved

The site’s companies and their recorded parents were checked; no export-control designation, sovereign investment or classified jurisdiction was found.

Headquarters country is unrecorded for 2 companies, leaving their jurisdiction checks incomplete.

Capacity

Site records dated 10 Jul 2024.

Accelerators, catalogue count

Location

The nearest destination the advanced-computing licence rules name (Macao and Country Group D:5) is Libya, 1,233 km from the recorded position: a reply within 11.95 ms over standard single-mode fibre to a timing server at the site would rule it out.

Campus records

MareNostrum 5, Barcelona has two records, and their power figures are never added together.

Sources

EuroHPC Joint Undertaking. Site records dated 21 Dec 2023 to 10 Jul 2024. Compiled 20 Nov 2026.
4 sources
SourceUsed forRecords
EuroHPC Joint UndertakingSite identity, control roles and capacity
Ownership graphParent-company relationships, with sources recorded for each link
Export-control designationsFederal Register-anchored designations attached to the relevant organisation0 records
Licensed corporate databaseCorporate affiliations and sovereign investment links
Data
How the figures were made

Ownership roles. The site owner, operator and AI-hardware owner can be different companies. Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility. Each role requires its own attribution: a role is shown only where its own source establishes it. An operator named in a source supplies evidence of operation only, and no role implies exclusive control of the full site.

Parent companies. Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented. Each finding is assigned to the company it concerns.

Visibility tier. The corporate-traceability tier does not verify property ownership or facility operation. Basis: Company identified; parent unrecorded.

Campus records. The power figures of a campus’s records are never added together. Across the platform, recorded totals count Mare Nostrum 5’s figure once; operating totals count a member’s figure only if it is operating capacity. Measurement scope is unrecorded for 2 of MareNostrum 5, Barcelona’s 2 records. Curator’s note on this campus: MareNostrum 5, a EuroHPC supercomputer at Barcelona, held by two records: Epoch's GPU-cluster catalogue and the EuroHPC list. The EuroHPC Joint Undertaking names one machine of that name there. Counted once, at 6 MW (operational), the figure on Mare Nostrum 5. No folded record carries a power figure; the fold changes site counts only. Both records carry its accelerators, which this fold does not touch.

Data quality. Any power figure on this record is excluded from power totals to avoid counting overlapping campus capacity twice. Curator’s working note: Part of campus MareNostrum 5, Barcelona. This record is a second record of a site that Mare Nostrum 5 represents, so it is not counted again in site totals; it carries no power figure. Its accelerator figures are kept.

Missing values. Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits. Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld. Per-fund identities and amounts are withheld.

Estimates. Figures from EuroHPC Joint Undertaking retain the source’s estimate flags. The tilde marks an estimate.

Compiled. Compiled 20 Nov 2026. Dates attached to findings refer to the source evidence.

Identifiers
Scrutica ID
fac-eurohpc-marenostrum-5
Class
HPC centre
Coordinates
41.3877, 2.1132
Visibility tier
Tier 4