Anthropic

Entity record, United States

Above, counterparties named in the control disclosures. Below, 4 facilities linked to Anthropic or its group, including sites reached through control disclosures, by status.

Control

Control claims document ownership, operation or contractual capacity.

Anthropic contracts compute from at least 9 companies and counterparties not named, per its own and their disclosures and a third party’s filing.

Control disclosures, 26
Control relations on record, 1418 Sep 2026

Title0Owns the facility, or holds its ground lease.No site-specific title on record. Ownership requires a disclosure naming the facility; a company-wide statement that it owns data centres leaves individual sites unresolved.

Operation0Runs the facility day to day.No operating arrangement on record.

Contract12Holds capacity by lease, offtake, colocation, or reservation.

One arrangement, documented in 2 disclosures: SEC Form 8-K by a third party, Filed 19 Nov 2025; Press release by the subject, Published 18 Nov 2025. Counted once in the band total.

Capacity reservationcounterparties not named1.0 GW, basis unspecified
SEC Form 8-K by a third party. Filed 19 Nov 2025.
Receipt
“Announced that, for the first time, Anthropic will run and scale on NVIDIA infrastructure, initially adopting 1 gigawatt of compute capacity with NVIDIA Grace Blackwell and Vera Rubin systems.”

Recorded as sec_8k, disclosed by a third party, authority tier 1. Claim id ctrl-anthropic-unnamed-org-level-capacity_reservation-2025-867311.

NVIDIA’s results release says Anthropic is “initially adopting 1 gigawatt of compute capacity with NVIDIA Grace Blackwell and Vera Rubin systems”, without Anthropic’s “up to”. NVIDIA supplies the systems and is not recorded as the counterparty.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-unnamed-org-level-capacityreservation-2025-867311,
  title = {[SEC Form 8-K concerning Anthropic’s capacity reservation with counterparties not named]},
  year = {2025},
  howpublished = {\url{https://www.sec.gov/Archives/edgar/data/1045810/000104581025000228/q3fy26pr.htm}},
  note = {Scrutica claim ctrl-anthropic-unnamed-org-level-capacity_reservation-2025-867311. Filed 19 Nov 2025.}
}
[SEC Form 8-K concerning Anthropic’s capacity reservation with counterparties not named] (2025). Filed 19 Nov 2025. Scrutica claim ctrl-anthropic-unnamed-org-level-capacity_reservation-2025-867311. https://www.sec.gov/Archives/edgar/data/1045810/000104581025000228/q3fy26pr.htm
Capacity reservationcounterparties not named1.0 GW, basis unspecifiedon NVIDIA Grace Blackwell and Vera Rubin systems
Press release by the subject. Published 18 Nov 2025.
Receipt
“Anthropic's compute commitment will initially be up to one gigawatt of compute capacity with NVIDIA Grace Blackwell and Vera Rubin systems.”

Recorded as press_release, disclosed by the subject, authority tier 2. Claim id ctrl-anthropic-unnamed-org-level-capacity_reservation-2025-4bca66.

Anthropic: “Anthropic’s compute commitment will initially be up to one gigawatt of compute capacity with NVIDIA Grace Blackwell and Vera Rubin systems.” The same announcement calls it “additional compute capacity up to one gigawatt”, beside the $30 billion Azure commitment, and names no counterparty for it.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-unnamed-org-level-capacityreservation-2025-4bca66,
  title = {[Press release concerning Anthropic’s capacity reservation with counterparties not named]},
  year = {2025},
  howpublished = {\url{https://www.anthropic.com/news/microsoft-nvidia-anthropic-announce-strategic-partnerships}},
  note = {Scrutica claim ctrl-anthropic-unnamed-org-level-capacity_reservation-2025-4bca66. Published 18 Nov 2025.}
}
[Press release concerning Anthropic’s capacity reservation with counterparties not named] (2025). Published 18 Nov 2025. Scrutica claim ctrl-anthropic-unnamed-org-level-capacity_reservation-2025-4bca66. https://www.anthropic.com/news/microsoft-nvidia-anthropic-announce-strategic-partnerships

One arrangement, documented in 4 disclosures: Press release by the subject, Published 6 May 2026; Press release by the counterparty, Published 6 Apr 2026; Press release by the subject, Published 6 Apr 2026; SEC Form 8-K by the counterparty, Filed 6 Apr 2026. Counted once in the band total.

Capacity reservationAlphabet5.0 GW, basis unspecifiedcoming online from 2027
Press release by the subject. Published 6 May 2026.
Receipt
“A 5 GW agreement with Google and Broadcom, which will begin coming online in 2027”

Recorded as press_release, disclosed by the subject, authority tier 2. Claim id ctrl-anthropic-alphabet-org-level-capacity_reservation-2026-4b7219.

Anthropic sizes the agreement at 5 GW, with Google and Broadcom together, coming online from 2027. Broadcom’s 3.5 GW is part of it: a part and the whole, printed side by side and never added.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-alphabet-org-level-capacityreservation-2026-4b7219,
  title = {[Press release concerning Anthropic’s capacity reservation with Alphabet]},
  year = {2026},
  howpublished = {\url{https://www.anthropic.com/news/higher-limits-spacex}},
  note = {Scrutica claim ctrl-anthropic-alphabet-org-level-capacity_reservation-2026-4b7219. Published 6 May 2026.}
}
[Press release concerning Anthropic’s capacity reservation with Alphabet] (2026). Published 6 May 2026. Scrutica claim ctrl-anthropic-alphabet-org-level-capacity_reservation-2026-4b7219. https://www.anthropic.com/news/higher-limits-spacex
Capacity reservationAlphabetcapacity not stated in this disclosurecoming online from 2027
Press release by the counterparty. Published 6 Apr 2026.
Receipt
“The expansion will provide Anthropic with multiple gigawatts of TPU capacity, expected to come online starting in 2027. This capacity expansion will be delivered through Google Cloud services, as well as access to Google-built TPUs supplied through Broadcom.”

Recorded as press_release, disclosed by the counterparty, authority tier 2. Claim id ctrl-anthropic-alphabet-org-level-capacity_reservation-2026-by-counterparty-e84122.

Google Cloud’s announcement of the same expansion: multiple gigawatts of TPU capacity from 2027, delivered through Google Cloud services and Google-built TPUs supplied through Broadcom.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-alphabet-org-level-capacityreservation-2026-by-counterparty-e84122,
  title = {[Press release concerning Anthropic’s capacity reservation with Alphabet]},
  year = {2026},
  howpublished = {\url{https://www.googlecloudpresscorner.com/2026-04-06-Anthropic-Expands-Use-of-Google-Cloud-and-TPUs}},
  note = {Scrutica claim ctrl-anthropic-alphabet-org-level-capacity_reservation-2026-by-counterparty-e84122. Published 6 Apr 2026.}
}
[Press release concerning Anthropic’s capacity reservation with Alphabet] (2026). Published 6 Apr 2026. Scrutica claim ctrl-anthropic-alphabet-org-level-capacity_reservation-2026-by-counterparty-e84122. https://www.googlecloudpresscorner.com/2026-04-06-Anthropic-Expands-Use-of-Google-Cloud-and-TPUs
Capacity reservationAlphabetcapacity not stated in this disclosurecoming online from 2027
Press release by the subject. Published 6 Apr 2026.
Receipt
“We have signed a new agreement with Google and Broadcom for multiple gigawatts of next-generation TPU capacity that we expect to come online starting in 2027.”

Recorded as press_release, disclosed by the subject, authority tier 2. Claim id ctrl-anthropic-alphabet-org-level-capacity_reservation-2026-de72c5.

Anthropic’s announcement of a new agreement with Google and Broadcom for “multiple gigawatts of next-generation TPU capacity” from 2027. Broadcom’s 8-K of the same day puts about 3.5 GW of it through Broadcom, and Anthropic sized the whole at 5 GW on 6 May.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-alphabet-org-level-capacityreservation-2026-de72c5,
  title = {[Press release concerning Anthropic’s capacity reservation with Alphabet]},
  year = {2026},
  howpublished = {\url{https://www.anthropic.com/news/google-broadcom-partnership-compute}},
  note = {Scrutica claim ctrl-anthropic-alphabet-org-level-capacity_reservation-2026-de72c5. Published 6 Apr 2026.}
}
[Press release concerning Anthropic’s capacity reservation with Alphabet] (2026). Published 6 Apr 2026. Scrutica claim ctrl-anthropic-alphabet-org-level-capacity_reservation-2026-de72c5. https://www.anthropic.com/news/google-broadcom-partnership-compute
Capacity reservationBroadcom Inc.3.5 GW, basis unspecified (estimate)access from 2027
SEC Form 8-K by the counterparty. Filed 6 Apr 2026.
Receipt
“Broadcom, Google and Anthropic PBC (“Anthropic”) have expanded their current strategic collaboration under which Anthropic, beginning in 2027, will access through Broadcom approximately 3.5 gigawatts as part of the multiple gigawatts of next generation TPU-based AI compute capacity committed by Anthropic.”

Recorded as sec_8k, disclosed by the counterparty, authority tier 1, an estimated value. Claim id ctrl-anthropic-broadcom-org-level-capacity_reservation-2026-ec7e72.

The collaboration involves Broadcom, Google and Anthropic. Anthropic’s access to approximately 3.5 GW is expected to begin in 2027 and depends on its continued commercial success. The filing’s separate 2031 horizon concerns Broadcom’s supply agreement with Google.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-broadcom-org-level-capacityreservation-2026-ec7e72,
  title = {[SEC Form 8-K concerning Anthropic’s capacity reservation with Broadcom Inc.]},
  year = {2026},
  howpublished = {\url{https://www.sec.gov/Archives/edgar/data/1730168/000119312526144028/d87999d8k.htm}},
  note = {Scrutica claim ctrl-anthropic-broadcom-org-level-capacity_reservation-2026-ec7e72. Filed 6 Apr 2026.}
}
[SEC Form 8-K concerning Anthropic’s capacity reservation with Broadcom Inc.] (2026). Filed 6 Apr 2026. Scrutica claim ctrl-anthropic-broadcom-org-level-capacity_reservation-2026-ec7e72. https://www.sec.gov/Archives/edgar/data/1730168/000119312526144028/d87999d8k.htm

One arrangement, documented in 2 disclosures: Press release by the counterparty, Published 23 Oct 2025; Press release by the subject, Published 23 Oct 2025. Counted once in the band total.

Capacity reservationAlphabetup to one million TPUs; more than 1 GW expected in 2026
Press release by the counterparty. Published 23 Oct 2025.
Receipt
“Anthropic and Google have a longstanding partnership and this latest expansion will help us continue to grow the compute we need to define the frontier of AI.”

Recorded as press_release, disclosed by the counterparty, authority tier 2, an estimated value. Claim id ctrl-anthropic-alphabet-org-level-capacity_reservation-2025-03eb2d.

Google and Anthropic describe an expansion of up to one million TPU chips, with more than a gigawatt expected in 2026. These rounded commitments do not establish an exact power allocation. Google values the agreement in the tens of billions of dollars.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-alphabet-org-level-capacityreservation-2025-03eb2d,
  title = {[Press release concerning Anthropic’s capacity reservation with Alphabet]},
  year = {2025},
  howpublished = {\url{https://www.googlecloudpresscorner.com/2025-10-23-Anthropic-to-Expand-Use-of-Google-Cloud-TPUs-and-Services}},
  note = {Scrutica claim ctrl-anthropic-alphabet-org-level-capacity_reservation-2025-03eb2d. Published 23 Oct 2025.}
}
[Press release concerning Anthropic’s capacity reservation with Alphabet] (2025). Published 23 Oct 2025. Scrutica claim ctrl-anthropic-alphabet-org-level-capacity_reservation-2025-03eb2d. https://www.googlecloudpresscorner.com/2025-10-23-Anthropic-to-Expand-Use-of-Google-Cloud-TPUs-and-Services
Capacity reservationAlphabetwell over 1 GW expected online in 2026
Press release by the subject. Published 23 Oct 2025.
Receipt
“The expansion is worth tens of billions of dollars and is expected to bring well over a gigawatt of capacity online in 2026.”

Recorded as press_release, disclosed by the subject, authority tier 2. Claim id ctrl-anthropic-alphabet-org-level-capacity_reservation-2025-by-subject-cae096.

Anthropic’s own announcement of the TPU expansion Google announced the same day: worth tens of billions of dollars, with well over a gigawatt expected online in 2026. “Well over a gigawatt” is a floor, so no capacity value is recorded.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-alphabet-org-level-capacityreservation-2025-by-subject-cae096,
  title = {[Press release concerning Anthropic’s capacity reservation with Alphabet]},
  year = {2025},
  howpublished = {\url{https://www.anthropic.com/news/expanding-our-use-of-google-cloud-tpus-and-services}},
  note = {Scrutica claim ctrl-anthropic-alphabet-org-level-capacity_reservation-2025-by-subject-cae096. Published 23 Oct 2025.}
}
[Press release concerning Anthropic’s capacity reservation with Alphabet] (2025). Published 23 Oct 2025. Scrutica claim ctrl-anthropic-alphabet-org-level-capacity_reservation-2025-by-subject-cae096. https://www.anthropic.com/news/expanding-our-use-of-google-cloud-tpus-and-services

One arrangement, documented in 2 disclosures: Press release by the subject, Published 20 Apr 2026; Press release by the counterparty, Published 20 Apr 2026. Counted once in the band total.

Capacity reservationAmazon.com, Inc.5.0 GW, basis unspecifiednearly 1 GW of Trainium2 and Trainium3 online by the end of 2026
Press release by the subject. Published 20 Apr 2026.
Receipt
“secure up to 5 gigawatts (GW) of capacity for training and deploying Claude, including new Trainium2 capacity coming online in the first half of this year and nearly 1GW total of Trainium2 and Trainium3 capacity coming online by the end of 2026.”

Recorded as press_release, disclosed by the subject, authority tier 2. Claim id ctrl-anthropic-amazon-org-level-capacity_reservation-2026-by-subject-233fa7.

Anthropic’s own announcement of the agreement Amazon announced the same day: up to 5 GW, with new Trainium2 capacity in the first half of 2026 and nearly 1 GW of Trainium2 and Trainium3 by the end of 2026.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-amazon-org-level-capacityreservation-2026-by-subject-233fa7,
  title = {[Press release concerning Anthropic’s capacity reservation with Amazon.com, Inc.]},
  year = {2026},
  howpublished = {\url{https://www.anthropic.com/news/anthropic-amazon-compute}},
  note = {Scrutica claim ctrl-anthropic-amazon-org-level-capacity_reservation-2026-by-subject-233fa7. Published 20 Apr 2026.}
}
[Press release concerning Anthropic’s capacity reservation with Amazon.com, Inc.] (2026). Published 20 Apr 2026. Scrutica claim ctrl-anthropic-amazon-org-level-capacity_reservation-2026-by-subject-233fa7. https://www.anthropic.com/news/anthropic-amazon-compute
Capacity reservationAmazon.com, Inc.5.0 GW, basis unspecified (stated ceiling)significant Trainium3 capacity expected online in 2026
Press release by the counterparty. Published 20 Apr 2026.
Receipt
“Anthropic to secure up to 5 gigawatts (GW) of current and future generations of Amazon's Trainium chips to train and power their advanced AI models. ... Anthropic to spend more than $100 billion over the next ten years on AWS technologies.”

Recorded as press_release, disclosed by the counterparty, authority tier 2, an estimated value. Claim id ctrl-anthropic-amazon-org-level-capacity_reservation-2026-d46307.

Amazon describes up to 5 GW of Trainium capacity for Anthropic, including significant Trainium3 capacity expected to come online in 2026, and a commitment from Anthropic to spend more than $100 billion on AWS technologies over ten years. Separately, Amazon is investing $5 billion in Anthropic, with up to $20 billion more tied to commercial milestones.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-amazon-org-level-capacityreservation-2026-d46307,
  title = {[Press release concerning Anthropic’s capacity reservation with Amazon.com, Inc.]},
  year = {2026},
  howpublished = {\url{https://www.aboutamazon.com/news/company-news/amazon-invests-additional-5-billion-anthropic-ai}},
  note = {Scrutica claim ctrl-anthropic-amazon-org-level-capacity_reservation-2026-d46307. Published 20 Apr 2026.}
}
[Press release concerning Anthropic’s capacity reservation with Amazon.com, Inc.] (2026). Published 20 Apr 2026. Scrutica claim ctrl-anthropic-amazon-org-level-capacity_reservation-2026-d46307. https://www.aboutamazon.com/news/company-news/amazon-invests-additional-5-billion-anthropic-ai
Capacity reservationAmazon.com, Inc.capacity not stated in this disclosurein use at Project Rainier
Press release by the counterparty, about Anthropic-Amazon New Carlisle. Updated 29 Oct 2025.
Receipt
“Anthropic is actively using Project Rainier to build and deploy its industry-leading AI model, Claude.”

Recorded as press_release, disclosed by the counterparty, authority tier 2. Claim id ctrl-anthropic-amazon-anthropic-amazon-new-carlisle-capacity_reservation-2025-2a40c7.

AWS describes roughly 500,000 Trainium2 chips at Project Rainier, with Anthropic expected to use more than one million by the end of 2025. The announcement gives no power capacity. Amazon’s separate November 2025 announcement of 2.4 GW in Northern Indiana does not name Anthropic.

Updated 29 Oct 2025. Amazon’s page metadata records publication on 24 June 2025 and an update on 29 October 2025.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-amazon-anthropic-amazon-new-carlisle-capacityreservation-2025-2a40c7,
  title = {[Press release concerning Anthropic’s capacity reservation with Amazon.com, Inc.]},
  year = {2025},
  howpublished = {\url{https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster}},
  note = {Scrutica claim ctrl-anthropic-amazon-anthropic-amazon-new-carlisle-capacity_reservation-2025-2a40c7. Updated 29 Oct 2025. Amazon’s page metadata records publication on 24 June 2025 and an update on 29 October 2025.}
}
[Press release concerning Anthropic’s capacity reservation with Amazon.com, Inc.] (2025). Updated 29 Oct 2025. Amazon’s page metadata records publication on 24 June 2025 and an update on 29 October 2025. Scrutica claim ctrl-anthropic-amazon-anthropic-amazon-new-carlisle-capacity_reservation-2025-2a40c7. https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster
Capacity reservationAMD2.0 GW, basis unspecifiedfirst gigawatt from the first half of 2027
Press release by the counterparty. Published 22 Jul 2026.
Receipt
“AMD (NASDAQ: AMD) and Anthropic today announced a strategic partnership to deploy up to 2 gigawatts of AMD Instinct™ MI450 Series GPUs in AMD Helios™ rackscale solutions, with deployment of the first gigawatt beginning in the first half of 2027.”

Recorded as press_release, disclosed by the counterparty, authority tier 2. Claim id ctrl-anthropic-amd-org-level-capacity_reservation-2026-f564d3.

AMD’s announcement: up to 2 GW of Instinct MI450 GPUs in Helios racks for Anthropic, the first gigawatt from the first half of 2027. AMD’s equity investment in Anthropic, announced with it, is not recorded here.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-amd-org-level-capacityreservation-2026-f564d3,
  title = {[Press release concerning Anthropic’s capacity reservation with AMD]},
  year = {2026},
  howpublished = {\url{https://newsroom.amd.com/news/amd-anthropic-strategic-partnership/}},
  note = {Scrutica claim ctrl-anthropic-amd-org-level-capacity_reservation-2026-f564d3. Published 22 Jul 2026.}
}
[Press release concerning Anthropic’s capacity reservation with AMD] (2026). Published 22 Jul 2026. Scrutica claim ctrl-anthropic-amd-org-level-capacity_reservation-2026-f564d3. https://newsroom.amd.com/news/amd-anthropic-strategic-partnership/
Capacity reservationBroadcom Inc.capacity not stated in this disclosure$10 billion of Ironwood TPU orders and a further $11 billion order, per Broadcom’s chief executive on the call of 11 Dec 2025, as DCD reportedfurther $11 billion order for delivery in 2026
News report of an earnings call by the counterparty. Earnings call 11 Dec 2025.
Receipt
“Broadcom CEO Hock Tan told investors during the vendor’s latest earnings call that Anthropic was the previously unnamed customer that had signed a $10 billion custom-chip deal earlier this year. ... Anthropic has since placed an additional order valued at $11 billion that Tan said is scheduled for delivery later next year.”

Recorded as earnings_call, the nearest of the record’s classes, disclosed by the counterparty, authority tier 3. Claim id ctrl-anthropic-broadcom-org-level-capacity_reservation-2025-11097d.

A DCD news report of Broadcom’s earnings call of 11 December 2025: Broadcom’s chief executive named Anthropic as the customer behind a $10 billion order for Google’s Ironwood TPUs, which Broadcom designs and sells, and said Anthropic had placed a further $11 billion order for delivery in 2026. He called it a system sale. Broadcom’s earnings release and 10-K do not give these figures. Its 8-K of April 2026 records a later agreement, for capacity from 2027.

Earnings call 11 Dec 2025. DCD published this report on 15 December 2025, after SDxCentral; Broadcom’s release of 11 December dates the call.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-broadcom-org-level-capacityreservation-2025-11097d,
  title = {[News report of an earnings call concerning Anthropic’s capacity reservation with Broadcom Inc.]},
  year = {2025},
  howpublished = {\url{https://www.datacenterdynamics.com/en/news/broadcom-bulges-with-anthropic-ai-orders/}},
  note = {Scrutica claim ctrl-anthropic-broadcom-org-level-capacity_reservation-2025-11097d. Earnings call 11 Dec 2025. DCD published this report on 15 December 2025, after SDxCentral; Broadcom’s release of 11 December dates the call.}
}
[News report of an earnings call concerning Anthropic’s capacity reservation with Broadcom Inc.] (2025). Earnings call 11 Dec 2025. DCD published this report on 15 December 2025, after SDxCentral; Broadcom’s release of 11 December dates the call. Scrutica claim ctrl-anthropic-broadcom-org-level-capacity_reservation-2025-11097d. https://www.datacenterdynamics.com/en/news/broadcom-bulges-with-anthropic-ai-orders/
Capacity reservationCoreWeavecapacity not stated in this disclosure
SEC Form 8-K by the counterparty. Filed 7 May 2026.
Receipt
“Signed multi-year agreement with Anthropic to support the development and deployment of Anthropic’s Claude family of AI models”

Recorded as sec_8k, disclosed by the counterparty, authority tier 1. Claim id ctrl-anthropic-coreweave-org-level-capacity_reservation-2026-cbc9c7.

CoreWeave’s first-quarter 2026 results release, filed as a Form 8-K exhibit: a multi-year agreement with Anthropic. It gives no value or capacity.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-coreweave-org-level-capacityreservation-2026-cbc9c7,
  title = {[SEC Form 8-K concerning Anthropic’s capacity reservation with CoreWeave]},
  year = {2026},
  howpublished = {\url{https://www.sec.gov/Archives/edgar/data/1769628/000176962826000220/coreweave1q26earningspress.htm}},
  note = {Scrutica claim ctrl-anthropic-coreweave-org-level-capacity_reservation-2026-cbc9c7. Filed 7 May 2026.}
}
[SEC Form 8-K concerning Anthropic’s capacity reservation with CoreWeave] (2026). Filed 7 May 2026. Scrutica claim ctrl-anthropic-coreweave-org-level-capacity_reservation-2026-cbc9c7. https://www.sec.gov/Archives/edgar/data/1769628/000176962826000220/coreweave1q26earningspress.htm

One arrangement, documented in 2 disclosures: Press release by the subject, Published 18 Nov 2025; Press release by the counterparty, Published 18 Nov 2025. Counted once in the band total.

Capacity reservationMicrosoft Corporationcapacity not stated in this disclosure$30 billion of Azure compute capacity
Press release by the subject. Published 18 Nov 2025.
Receipt
“Anthropic has committed to purchase $30 billion of Azure compute capacity”

Recorded as press_release, disclosed by the subject, authority tier 2. Claim id ctrl-anthropic-microsoft-org-level-capacity_reservation-2025-ac25f7.

Anthropic commits to purchase $30 billion of Azure compute capacity; Microsoft published the same announcement that day. The sentence continues “and to contract additional compute capacity up to one gigawatt” without naming from whom, so that gigawatt is a separate record whose counterparty is not named.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-microsoft-org-level-capacityreservation-2025-ac25f7,
  title = {[Press release concerning Anthropic’s capacity reservation with Microsoft Corporation]},
  year = {2025},
  howpublished = {\url{https://www.anthropic.com/news/microsoft-nvidia-anthropic-announce-strategic-partnerships}},
  note = {Scrutica claim ctrl-anthropic-microsoft-org-level-capacity_reservation-2025-ac25f7. Published 18 Nov 2025.}
}
[Press release concerning Anthropic’s capacity reservation with Microsoft Corporation] (2025). Published 18 Nov 2025. Scrutica claim ctrl-anthropic-microsoft-org-level-capacity_reservation-2025-ac25f7. https://www.anthropic.com/news/microsoft-nvidia-anthropic-announce-strategic-partnerships
Capacity reservationMicrosoft Corporationcapacity not stated in this disclosure$30 billion of Azure compute capacity
Press release by the counterparty. Published 18 Nov 2025.
Receipt
“Anthropic has committed to purchase $30 billion of Azure compute capacity and to contract additional compute capacity up to one gigawatt.”

Recorded as press_release, disclosed by the counterparty, authority tier 2. Claim id ctrl-anthropic-microsoft-org-level-capacity_reservation-2025-by-counterparty-05ae93.

Microsoft’s publication of the same announcement, in the same words: $30 billion of Azure compute capacity, and up to one gigawatt of additional compute capacity whose counterparty is not named.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-microsoft-org-level-capacityreservation-2025-by-counterparty-05ae93,
  title = {[Press release concerning Anthropic’s capacity reservation with Microsoft Corporation]},
  year = {2025},
  howpublished = {\url{https://blogs.microsoft.com/blog/2025/11/18/microsoft-nvidia-and-anthropic-announce-strategic-partnerships/}},
  note = {Scrutica claim ctrl-anthropic-microsoft-org-level-capacity_reservation-2025-by-counterparty-05ae93. Published 18 Nov 2025.}
}
[Press release concerning Anthropic’s capacity reservation with Microsoft Corporation] (2025). Published 18 Nov 2025. Scrutica claim ctrl-anthropic-microsoft-org-level-capacity_reservation-2025-by-counterparty-05ae93. https://blogs.microsoft.com/blog/2025/11/18/microsoft-nvidia-and-anthropic-announce-strategic-partnerships/
Capacity reservationNscalecapacity not stated in this disclosurepayments of up to about $44.6 billion, per Nscale (18 Sep 2026)
SEC Form S-1 (registration statement) by the counterparty. Filed 18 Sep 2026.
Receipt
“On August 25, 2026, we entered into a series of GPU Services Agreements (collectively, the “Anthropic Services Agreements”) with Anthropic PBC (“Anthropic”), pursuant to which we agreed to provide Anthropic with dedicated GPU infrastructure services at our Monarch Compute Campus to support the deployment of NVIDIA Vera Rubin NVL72 GPUs. The Anthropic Services Agreements provide for aggregate payments to us of up to approximately $44.6 billion.”

Recorded as sec_s1, the nearest of the record’s classes, disclosed by the counterparty, authority tier 1. Claim id ctrl-anthropic-nscale-org-level-capacity_reservation-2026-8615ff.

Nscale’s registration statement: four GPU services agreements of 25 August 2026 for dedicated NVIDIA Vera Rubin NVL72 capacity for Anthropic at the Monarch Compute Campus in Mason County, West Virginia, with payments of up to about $44.6 billion.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-nscale-org-level-capacityreservation-2026-8615ff,
  title = {[SEC Form S-1 (registration statement) concerning Anthropic’s capacity reservation with Nscale]},
  year = {2026},
  howpublished = {\url{https://www.sec.gov/Archives/edgar/data/2110365/000119312526395475/ck0002110365-20260918.htm}},
  note = {Scrutica claim ctrl-anthropic-nscale-org-level-capacity_reservation-2026-8615ff. Filed 18 Sep 2026.}
}
[SEC Form S-1 (registration statement) concerning Anthropic’s capacity reservation with Nscale] (2026). Filed 18 Sep 2026. Scrutica claim ctrl-anthropic-nscale-org-level-capacity_reservation-2026-8615ff. https://www.sec.gov/Archives/edgar/data/2110365/000119312526395475/ck0002110365-20260918.htm

One arrangement, documented in 4 disclosures from 2 documents: SEC Form 424B4 (final prospectus) by the counterparty, Filed 12 Jun 2026, on Colossus 1, Colossus 2 and MACROHARDRR; Press release by the subject, Published 6 May 2026, on Colossus 1. Counted once in the band total.

Capacity reservationSpace Exploration Technologies Corp.capacity not stated in this disclosureabout 325,000 NVIDIA GPUs across Colossus and Colossus II, per SpaceX’s prospectus (12 June 2026)capacity ramping from May–June 2026
SEC Form 424B4 (final prospectus) by the counterparty, about Colossus 1. Filed 12 Jun 2026.
Receipt
“For example, in May 2026, we entered into Cloud Services Agreements with Anthropic PBC (“Anthropic”), an AI research and development public benefit corporation, with respect to access to compute capacity across COLOSSUS and COLOSSUS II. Compute capacity provided includes approximately 325,000 NVIDIA GPUs, backed by hyperscale-class CPUs, exabyte-scale storage and high-speed networking and interconnects purpose-built for AI workloads. Pursuant to these agreements, the customer has agreed to pay us $1.25 billion per month through May 2029, with capacity ramping in May and June 2026 at a reduced fee. After the initial three-month period, the agreements may be terminated by either party upon 90 days’ notice.”

Recorded as sec_s1, the nearest of the record’s classes, disclosed by the counterparty, authority tier 1. Claim id ctrl-anthropic-spacex-xai-colossus-1-capacity_reservation-2026-dc73ef.

SpaceX’s final prospectus covers Anthropic’s access across Colossus and Colossus II, a wider scope than the Colossus 1 facility linked here. It describes payments of about $1.25 billion per month through May 2029 for capacity that includes approximately 325,000 NVIDIA GPUs, with reduced fees during the May–June 2026 capacity ramp. After an initial three months, either party may terminate on 90 days’ notice. The filing divides neither the payments nor the GPUs between the sites.

Source

Supersedes ctrl-anthropic-spacex-xai-colossus-1-capacity_reservation-2026-1e361a (record date 20 May 2026).

Cite this claim
@misc{scrutica-ctrl-anthropic-spacex-xai-colossus-1-capacityreservation-2026-dc73ef,
  title = {[SEC Form 424B4 (final prospectus) concerning Anthropic’s capacity reservation with Space Exploration Technologies Corp.]},
  year = {2026},
  howpublished = {\url{https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm}},
  note = {Scrutica claim ctrl-anthropic-spacex-xai-colossus-1-capacity_reservation-2026-dc73ef. Filed 12 Jun 2026.}
}
[SEC Form 424B4 (final prospectus) concerning Anthropic’s capacity reservation with Space Exploration Technologies Corp.] (2026). Filed 12 Jun 2026. Scrutica claim ctrl-anthropic-spacex-xai-colossus-1-capacity_reservation-2026-dc73ef. https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm
Capacity reservationSpace Exploration Technologies Corp.capacity not stated in this disclosureabout 325,000 NVIDIA GPUs across Colossus and Colossus II, per SpaceX’s prospectus (12 June 2026)capacity ramping from May–June 2026
SEC Form 424B4 (final prospectus) by the counterparty, about Colossus 2. Filed 12 Jun 2026.
Receipt
“with respect to access to compute capacity across COLOSSUS and COLOSSUS II”

Recorded as sec_s1, the nearest of the record’s classes, disclosed by the counterparty, authority tier 1. Claim id ctrl-anthropic-spacex-xai-colossus-2-capacity_reservation-2026-017b52.

The Colossus II half of the agreement in SpaceX’s final prospectus, which describes Colossus II as its data centres in Memphis and in Southaven, Mississippi. This record links the Memphis site held here as Colossus 2; the Southaven site and the Colossus 1 half are their own records. The filing divides neither the $1.25 billion a month nor the approximately 325,000 NVIDIA GPUs between the sites.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-spacex-xai-colossus-2-capacityreservation-2026-017b52,
  title = {[SEC Form 424B4 (final prospectus) concerning Anthropic’s capacity reservation with Space Exploration Technologies Corp.]},
  year = {2026},
  howpublished = {\url{https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm}},
  note = {Scrutica claim ctrl-anthropic-spacex-xai-colossus-2-capacity_reservation-2026-017b52. Filed 12 Jun 2026.}
}
[SEC Form 424B4 (final prospectus) concerning Anthropic’s capacity reservation with Space Exploration Technologies Corp.] (2026). Filed 12 Jun 2026. Scrutica claim ctrl-anthropic-spacex-xai-colossus-2-capacity_reservation-2026-017b52. https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm
Capacity reservationSpace Exploration Technologies Corp.capacity not stated in this disclosureabout 325,000 NVIDIA GPUs across Colossus and Colossus II, per SpaceX’s prospectus (12 June 2026)capacity ramping from May–June 2026
SEC Form 424B4 (final prospectus) by the counterparty, about MACROHARDRR. Filed 12 Jun 2026.
Receipt
“with respect to access to compute capacity across COLOSSUS and COLOSSUS II”

Recorded as sec_s1, the nearest of the record’s classes, disclosed by the counterparty, authority tier 1. Claim id ctrl-anthropic-spacex-xai-southaven-macrohardrr-capacity_reservation-2026-3a6b24.

The Colossus II half of the agreement in SpaceX’s final prospectus, which describes Colossus II as its data centres in Memphis and in Southaven, Mississippi. This record links the Southaven site; the Memphis site, held here as Colossus 2, and the Colossus 1 half are their own records. The filing divides neither the $1.25 billion a month nor the approximately 325,000 NVIDIA GPUs between the sites.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-spacex-xai-southaven-macrohardrr-capacityreservation-2026-3a6b24,
  title = {[SEC Form 424B4 (final prospectus) concerning Anthropic’s capacity reservation with Space Exploration Technologies Corp.]},
  year = {2026},
  howpublished = {\url{https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm}},
  note = {Scrutica claim ctrl-anthropic-spacex-xai-southaven-macrohardrr-capacity_reservation-2026-3a6b24. Filed 12 Jun 2026.}
}
[SEC Form 424B4 (final prospectus) concerning Anthropic’s capacity reservation with Space Exploration Technologies Corp.] (2026). Filed 12 Jun 2026. Scrutica claim ctrl-anthropic-spacex-xai-southaven-macrohardrr-capacity_reservation-2026-3a6b24. https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm
Capacity reservationSpace Exploration Technologies Corp.all of Colossus 1’s compute capacity, more than 300 MW and over 220,000 NVIDIA GPUs, per Anthropic (6 May 2026)
Press release by the subject, about Colossus 1. Published 6 May 2026.
Receipt
“We’ve signed an agreement with SpaceX to use all of the compute capacity at their Colossus 1 data center. This gives us access to more than 300 megawatts of new capacity (over 220,000 NVIDIA GPUs) within the month.”

Recorded as press_release, disclosed by the subject, authority tier 2. Claim id ctrl-anthropic-spacex-xai-colossus-1-capacity_reservation-2026-d190dc.

Anthropic: an agreement “to use all of the compute capacity at their Colossus 1 data center”, giving “more than 300 megawatts of new capacity (over 220,000 NVIDIA GPUs) within the month”. More than 300 MW is a floor, so no capacity value is recorded. SpaceX’s prospectus of 12 June puts the agreement at about 325,000 GPUs across Colossus and Colossus II, the company’s data centres in Memphis and Southaven.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-spacex-xai-colossus-1-capacityreservation-2026-d190dc,
  title = {[Press release concerning Anthropic’s capacity reservation with Space Exploration Technologies Corp.]},
  year = {2026},
  howpublished = {\url{https://www.anthropic.com/news/higher-limits-spacex}},
  note = {Scrutica claim ctrl-anthropic-spacex-xai-colossus-1-capacity_reservation-2026-d190dc. Published 6 May 2026.}
}
[Press release concerning Anthropic’s capacity reservation with Space Exploration Technologies Corp.] (2026). Published 6 May 2026. Scrutica claim ctrl-anthropic-spacex-xai-colossus-1-capacity_reservation-2026-d190dc. https://www.anthropic.com/news/higher-limits-spacex

One arrangement, documented in 2 disclosures: SEC Form 8-K by the counterparty, Filed 5 Aug 2026; SEC Form 8-K by the counterparty, Filed 6 Jul 2026. Counted once in the band total.

LeaseTeraWulf401 MW, critical IT load20-year termdelivery in the second half of 2027 and the first half of 2028
SEC Form 8-K by the counterparty. Filed 5 Aug 2026.
Receipt
“Executed 401 MW Anthropic Lease at Justified Data Campus”

Recorded as sec_8k, disclosed by the counterparty, authority tier 1. Claim id ctrl-anthropic-terawulf-org-level-lease-2026-982303.

Justified Data Campus, Hawesville, Kentucky. TeraWulf’s Q2 2026 business update, furnished as Exhibit 99.2 to its results filing, lists 401 MW for delivery between the second half of 2027 and the first half of 2028 and puts the lease’s long-term contracted cash flows at about $19 billion over the 20-year term. TeraWulf’s 6 July announcement gave the same figure as contracted revenue over the initial lease term.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-terawulf-org-level-lease-2026-982303,
  title = {[SEC Form 8-K concerning Anthropic’s lease with TeraWulf]},
  year = {2026},
  howpublished = {\url{https://www.sec.gov/Archives/edgar/data/1083301/000108330126000162/terawulfq22026investorpr.htm}},
  note = {Scrutica claim ctrl-anthropic-terawulf-org-level-lease-2026-982303. Filed 5 Aug 2026.}
}
[SEC Form 8-K concerning Anthropic’s lease with TeraWulf] (2026). Filed 5 Aug 2026. Scrutica claim ctrl-anthropic-terawulf-org-level-lease-2026-982303. https://www.sec.gov/Archives/edgar/data/1083301/000108330126000162/terawulfq22026investorpr.htm
LeaseTeraWulf401 MW, critical IT load20-year termdelivery late 2027 to early 2028
SEC Form 8-K by the counterparty. Filed 6 Jul 2026.
Receipt
“approximately 401 MW of critical IT load for high-performance computing ('HPC') operations ... Delivery of the leased capacity is expected to occur in phases beginning in late 2027 and concluding in early 2028. ... Anthropic's obligation to pay rent under the Justified Data Campus Lease will commence upon the delivery of the applicable leased premises and continue for a term of 20 years”

Recorded as sec_8k, disclosed by the counterparty, authority tier 1. Claim id ctrl-anthropic-terawulf-org-level-lease-2026-b13da9.

Justified Data Campus, Hawesville, Kentucky. The lease names Anthropic PBC as tenant and TeraWulf subsidiary Raylan Data LLC as landlord. Two five-year renewal options could extend the term to 30 years; delivery was expected to begin in late 2027. A separate Kentucky utility proceeding specifies 482 MW of maximum contract demand for Justified DataPower LLC. That utility demand measures a different quantity from this lease’s 401 MW of critical IT load, and the utility proceeding does not name Anthropic.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-terawulf-org-level-lease-2026-b13da9,
  title = {[SEC Form 8-K concerning Anthropic’s lease with TeraWulf]},
  year = {2026},
  howpublished = {\url{https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001104659-26-080583/tm2619468d1_8k.htm}},
  note = {Scrutica claim ctrl-anthropic-terawulf-org-level-lease-2026-b13da9. Filed 6 Jul 2026.}
}
[SEC Form 8-K concerning Anthropic’s lease with TeraWulf] (2026). Filed 6 Jul 2026. Scrutica claim ctrl-anthropic-terawulf-org-level-lease-2026-b13da9. https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001104659-26-080583/tm2619468d1_8k.htm
Form not stated2The source names the arrangement but not whether it is ownership, operation or a contract.

One arrangement, documented in 2 disclosures: Press release by the counterparty, Published 12 Nov 2025; Press release by the subject, Published 12 Nov 2025. Counted once in the band total.

Form not statedFluidstackcapacity not stated in this disclosure$50 billion of data centres in Texas and New York, custom built for Anthropic
Press release by the counterparty. Published 12 Nov 2025.
Receipt
“Fluidstack is announcing a $50 billion American computing infrastructure deal with Anthropic, building data centers in New York and Texas, with more sites to come. These facilities are custom built for Anthropic”

Recorded as press_release, disclosed by the counterparty, authority tier 2. Claim id ctrl-anthropic-fluidstack-org-level-unstated-2025-by-counterparty-199736.

Fluidstack’s announcement of the same arrangement, the same day: a $50 billion deal building data centres in New York and Texas, “custom built for Anthropic”.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-fluidstack-org-level-unstated-2025-by-counterparty-199736,
  title = {[Press release concerning Anthropic’s arrangement with Fluidstack]},
  year = {2025},
  howpublished = {\url{https://www.fluidstack.io/news/fluidstack-selected-by-anthropic-to-deliver-custom-data-centers-in-the-us}},
  note = {Scrutica claim ctrl-anthropic-fluidstack-org-level-unstated-2025-by-counterparty-199736. Published 12 Nov 2025.}
}
[Press release concerning Anthropic’s arrangement with Fluidstack] (2025). Published 12 Nov 2025. Scrutica claim ctrl-anthropic-fluidstack-org-level-unstated-2025-by-counterparty-199736. https://www.fluidstack.io/news/fluidstack-selected-by-anthropic-to-deliver-custom-data-centers-in-the-us
Form not statedFluidstackcapacity not stated in this disclosure$50 billion of data centres in Texas and New York, custom built for Anthropic
Press release by the subject. Published 12 Nov 2025.
Receipt
“Today, we are announcing a $50 billion investment in American computing infrastructure, building data centers with Fluidstack in Texas and New York, with more sites to come. These facilities are custom built for Anthropic”

Recorded as press_release, disclosed by the subject, authority tier 2. Claim id ctrl-anthropic-fluidstack-org-level-unstated-2025-ec9c42.

Anthropic announces a $50 billion investment in American computing infrastructure, building data centres with Fluidstack in Texas and New York, “custom built for Anthropic”. Neither party’s announcement says who will own, operate or lease them, so the form of control is not stated.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-fluidstack-org-level-unstated-2025-ec9c42,
  title = {[Press release concerning Anthropic’s arrangement with Fluidstack]},
  year = {2025},
  howpublished = {\url{https://www.anthropic.com/news/anthropic-invests-50-billion-in-american-ai-infrastructure}},
  note = {Scrutica claim ctrl-anthropic-fluidstack-org-level-unstated-2025-ec9c42. Published 12 Nov 2025.}
}
[Press release concerning Anthropic’s arrangement with Fluidstack] (2025). Published 12 Nov 2025. Scrutica claim ctrl-anthropic-fluidstack-org-level-unstated-2025-ec9c42. https://www.anthropic.com/news/anthropic-invests-50-billion-in-american-ai-infrastructure
Form not statedHut 8capacity not stated in this disclosure
SEC Form 10-K by the counterparty. Filed 25 Feb 2026.
Receipt
“In December 2025, we announced a strategic partnership with Anthropic, PBC (“Anthropic”) and Fluidstack Ltd. (“Fluidstack”) to develop AI data center infrastructure.”

Recorded as sec_10k, disclosed by the counterparty, authority tier 1. Claim id ctrl-anthropic-hut-8-org-level-unstated-2026-9acb6d.

Hut 8’s annual report: a partnership of December 2025 with Anthropic and Fluidstack to develop AI data-center infrastructure, whose first phase is Hut 8’s lease to Fluidstack at River Bend, Louisiana (its own record). The filing does not state Anthropic’s own form of control.

Source

Cite this claim
@misc{scrutica-ctrl-anthropic-hut-8-org-level-unstated-2026-9acb6d,
  title = {[SEC Form 10-K concerning Anthropic’s arrangement with Hut 8]},
  year = {2026},
  howpublished = {\url{https://www.sec.gov/Archives/edgar/data/1964789/000110465926019392/hut-20251231x10k.htm}},
  note = {Scrutica claim ctrl-anthropic-hut-8-org-level-unstated-2026-9acb6d. Filed 25 Feb 2026.}
}
[SEC Form 10-K concerning Anthropic’s arrangement with Hut 8] (2026). Filed 25 Feb 2026. Scrutica claim ctrl-anthropic-hut-8-org-level-unstated-2026-9acb6d. https://www.sec.gov/Archives/edgar/data/1964789/000110465926019392/hut-20251231x10k.htm
14 documented arrangements, grouped by form of control; repeated disclosures of the same arrangement count once in each band.
Disclosed term lengths5 Aug 2026

TeraWulf20 yr, 401 MWattested

Lease, 6 Jul 2026 and 5 Aug 2026 (2 disclosures)

Contract durations in years, with disclosed capacity; the control table gives each capacity figure’s measurement basis. No contract start date is on record. Record dates appear below the names; each receipt explains its date.
Sources of control disclosures
Disclosed by178Through1553
Disclosed bythe counterparty 17the subject 8a third party 1
ThroughPress release 15SEC Form 8-K 5SEC Form 424B4 (final prospectus) 3News report of an earnings call 1SEC Form S-1 (registration statement) 1SEC Form 10-K 1
26 disclosures covering 14 arrangements, split by discloser (top) and document type (bottom); widths show each category’s share of all 26 disclosures.
Control arrangements across tracked organisations
14
Anthropic Title Operation Contract Form not stated
19 of 20 tracked organisations plotted, ordered by the number of documented control arrangements and stacked by form of control; coverage varies by organisation. 1 organisation is excluded because arrangement identity is unresolved. Anthropic’s bar is labelled.

Of the 19 plotted organisations, 16 have contractual capacity on record and no facility title on record.

Capacity

Catalogue figures as compiled 11 Nov 2026. Hardware ownership identifies the owner of the compute equipment; facility ownership and operation require separate evidence.

Epoch’s frontier catalog includes 3 of the 4 additional facilities linked through control disclosures. Operating power totals ~2.9 GW (includes estimates). All facility links come from the control disclosures above.

Capacity and delivery by status

Operating

Amazon (Anthropic-Amazon New Carlisle): in use at Project Rainier; site ~1.2 GW (Epoch AI estimate), Anthropic’s share not on record. Amazon release, Oct 2025, attested

Space Exploration Technologies (Memphis and Southaven): all of Colossus 1’s compute capacity, more than 300 MW and over 220,000 NVIDIA GPUs, per Anthropic (6 May 2026); about 325,000 NVIDIA GPUs across Colossus and Colossus II, per SpaceX’s prospectus (12 June 2026); capacity ramping from May–June 2026. Space Exploration Technologies and Anthropic prospectus and release, May and Jun 2026, attested

Being built or delivered

Alphabet and Broadcom: 5.0 GW with Google and Broadcom, per Anthropic; ~3.5 GW of it through Broadcom, per Broadcom; coming online from 2027. Anthropic, Alphabet and Broadcom release and 8-K, Apr and May 2026, attested

Amazon: up to 5.0 GW; nearly 1 GW of Trainium2 and Trainium3 online by the end of 2026. Anthropic and Amazon releases, Apr 2026, attested

AMD: up to 2.0 GW; first gigawatt from the first half of 2027. AMD release, Jul 2026, attested

TeraWulf: 401 MW critical IT load; 20-year lease; delivery in the second half of 2027 and the first half of 2028. TeraWulf 8-Ks, Jul and Aug 2026, attested

Alphabet: up to one million TPUs; more than 1 GW expected in 2026. Alphabet and Anthropic releases, Oct 2025, attested

Broadcom: $10 billion of Ironwood TPU orders and a further $11 billion order, per Broadcom’s chief executive on the call of 11 Dec 2025, as DCD reported; further $11 billion order for delivery in 2026. Broadcom news report of an earnings call, Dec 2025, reported

Status not on record

Counterparties not named: 1.0 GW initially, per NVIDIA; up to 1.0 GW initially, per Anthropic; on NVIDIA Grace Blackwell and Vera Rubin systems. NVIDIA and Anthropic 8-K and release, Nov 2025, attested

CoreWeave: capacity not on record. CoreWeave 8-K, May 2026, attested

Microsoft: $30 billion of Azure compute capacity. Anthropic and Microsoft releases, Nov 2025, attested

Nscale: payments of up to about $44.6 billion, per Nscale (18 Sep 2026) Nscale sec form s-1 (registration statement), Sep 2026, attested

Fluidstack: form not stated; $50 billion of data centres in Texas and New York, custom built for Anthropic. Fluidstack and Anthropic releases, Nov 2025, attested

Hut 8: form not stated; capacity not on record. Hut 8 10-K, Feb 2026, attested

Facilities and capacity evidence, 4 linked records
Additional sites in control disclosures4These links come from control disclosures; the facility catalogs do not name this organisation as owner, operator or hardware owner. The two grade marks assess the capacity figure and the disclosure linking it to the site separately.
Colossus 21.3 GW (est.) per Epoch AI Frontier Data CentersOperational linked by attested claimhardware owner (per Epoch AI Frontier Data Centers): xAISource
Anthropic-Amazon New Carlisle1.2 GW (est.) per Epoch AI Frontier Data CentersOperational linked by attested claimhardware owner (per Epoch AI Frontier Data Centers): Amazon.com, Inc.Source
Colossus 1425 MW (est.) per Epoch AI Frontier Data CentersOperational linked by attested claimhardware owner (per Epoch AI Frontier Data Centers): xAISource
MACROHARDRRno capacity figure recordedOperational linked by attested claimSource

Export controls

Headquarters: United States.

Headquartered in the United States, so US chip-export rules place no destination limit on it. US rules as of 17 Jul 2026

No US Entity List entry matches it. US Entity List as recorded to 21 Aug 2026, attested

12 of its 14 arrangements on record buy capacity from other companies.

Designation matches and country access rules
Jurisdiction

Headquarters: the United States.

Export-control posture

Full Access. The listed accelerators are recorded as available. The US export rules compared here govern shipments to other countries. Classification based on rules as of 17 Jul 2026.

  • The CHIPS and Science Act appropriated $52.7 billion for semiconductor manufacturing, research and related workforce programmes.
Designations

No designation matches this organisation in Scrutica’s cross-reference, which links 39 organisations to export-control lists sourced from the Federal Register.

Latest recorded listing change: 21 Aug 2026.

Searches

Up to 2 GW of AMD MI450 GPUs that Anthropic is to deploy, the first gigawatt beginning in the first half of 2027: the announcement names no site, owner or facility operator. AMD release, 22 Jul 2026, attested

No disclosure states a capacity for 5 of the 12 contracts on record.

No SEC registrant identifier of its own is on record; the LEI registry holds candidate records, none yet confirmed as its own. GLEIF search, 25 Sep 2026

Subscription supply data places it at or above the 90th percentile of 5,370 organisations by number of supply relationships; the relationships are withheld.

Registry searches and disclosure posture
Legal entity identifierSearched, not linked here

The global LEI index was searched on 25 September 2026. It holds ANTHROPIC, PBC (LEI 984500B6DEB8CEBC4Z70), file 4860621 on the Delaware Division of Corporations’ records, at a Wilmington address. NSCALE’s registration statement of September 2026 names the company “Anthropic PBC, a Delaware public benefit corporation”, at a San Francisco address. Delaware lets a name that is not distinguishable from another stand with the holder’s written consent, so the name alone does not tie the two, and no LEI is linked here.

The organisation’s registration in the global Legal Entity Identifier (LEI) system.

as of 25 Sep 2026, registry record

Parent-reporting declarationsSearched, not linked here

The registry returned candidate LEIs whose identity is still unresolved. A confirmed match is needed to retrieve this organisation’s parent reports.

Why the organisation has not reported a direct or ultimate consolidating parent to the LEI registry.

as of 25 Sep 2026, registry record

Consolidation records naming this identifier as parentSearched, not linked here

Consolidation records name a parent by its LEI, so none can be matched to this organisation until a candidate LEI is confirmed as its own.

Reports from LEI-registered entities whose accounts are consolidated by this organisation.

as of 25 Sep 2026, registry record

SEC registrant recordNo registry identifier linked

No SEC registrant identifier is linked to this organisation in Scrutica.

SEC filings under the organisation’s own Central Index Key (CIK).

Counterparties supplied 17 of the 26 control disclosures.

Supply comparisons

Subscription corporate data supplies these comparisons; the underlying relationships cannot be republished.

Supply relationships

The number of supply relationships involving this organisation is at or above the 90th percentile of the 5,370 organisations in the supply dataset.

Counterparty corroboration

Partially corroborated: the supply data connects at least one-third and fewer than two-thirds of the 11 publicly documented counterparty pairs.

Contradiction check

The review on 12 Aug 2026 found no conflict between the subscription data and the public claims cited here.

Sources

Compiled 11 Nov 2026. Supply comparisons cover 5,370 organisations and 11 publicly cited counterparty pairs involving this organisation.
4 sources
Data
How the figures were made

Of the statements on this page, 15 are attested and 1 is reported.

Grades depend on the source’s authority tier, the discloser’s role and the estimate flag.

Attested. A non-estimated claim from a primary or research source, disclosed by the organisation, a counterparty or a regulator.

Reported. Press or third-party reporting.

Inferred. Derived or estimated, including announced capacity ceilings.

A value flagged as estimated grades inferred regardless of its source. This includes capacity ceilings announced by a party to the agreement.

Control claims cite supporting disclosures for ownership, operating and contractual arrangements. Export-control designations use Federal Register citations, the designation-to-organisation cross-reference, and rule-derived country access classifications.

Disclosure posture reads the Global LEI Foundation golden copy by the organisation’s own identifier and its SEC registrant record where one exists. Capacity comes from facility catalogs; each figure links to its source.

An empty section includes its search method and date if a search has been completed. Not yet searched means no search is on file. Unverified leads remain in the search notes.

Subscription corporate data guides source searches and coverage checks. Published control claims cite public disclosures. Supply comparisons use broad percentile bands and corroboration classes; underlying licensed records and identifiers are withheld.

Corrections to this page, 3