TeraWulf

HQUSListedWULF

No corporate parent is shown

0
ownership levels above this company
0
supply relationships in public sources · 0 with suppliers, 0 with customers
1
counterparties named from licensed supply-chain data · 1 supplier
1
linked facility
0
export-control designations found
Scrutica id
org-terawulf
SEC CIK
1083301
Ticker
WULF

Ownership chain

No corporate parent is shown for TeraWulf. Shareholder concentration requires separate shareholding data.

Compute arrangements

Filings and announcements recording who owns, runs or contracts compute capacity, where TeraWulf is one of the parties: 7 disclosures. Each is graded by its source’s authority, who disclosed it and whether its figure is an estimate.

Held by others with TeraWulf7 disclosuresArrangements another organisation holds, with TeraWulf as the other party.

One arrangement, documented in 2 disclosures.

Leaseheld by Anthropic401 MW, critical IT load20-year termdelivery in the second half of 2027 and the first half of 2028
Attested · SEC Form 8-K by TeraWulf · Filed Aug 5, 2026 · Source ↗ · Anthropic’s entity record
Receipt
“Executed 401 MW Anthropic Lease at Justified Data Campus”

Justified Data Campus, Hawesville, Kentucky. TeraWulf’s Q2 2026 business update, furnished as Exhibit 99.2 to its results filing, lists 401 MW for delivery between the second half of 2027 and the first half of 2028 and puts the lease’s long-term contracted cash flows at about $19 billion over the 20-year term. TeraWulf’s 6 July announcement gave the same figure as contracted revenue over the initial lease term.

Leaseheld by Anthropic401 MW, critical IT load20-year termdelivery late 2027 to early 2028
Attested · SEC Form 8-K by TeraWulf · Filed Jul 6, 2026 · Source ↗ · Anthropic’s entity record
Receipt
“approximately 401 MW of critical IT load for high-performance computing ('HPC') operations ... Delivery of the leased capacity is expected to occur in phases beginning in late 2027 and concluding in early 2028. ... Anthropic's obligation to pay rent under the Justified Data Campus Lease will commence upon the delivery of the applicable leased premises and continue for a term of 20 years”

Justified Data Campus, Hawesville, Kentucky. The lease names Anthropic PBC as tenant and TeraWulf subsidiary Raylan Data LLC as landlord. Two five-year renewal options could extend the term to 30 years; delivery was expected to begin in late 2027. A separate Kentucky utility proceeding specifies 482 MW of maximum contract demand for Justified DataPower LLC. That utility demand measures a different quantity from this lease’s 401 MW of critical IT load, and the utility proceeding does not name Anthropic.

Leaseheld by Core4260 MW, critical IT load10-year term
Attested · SEC Form 8-K by TeraWulf · TeraWulf Lake Mariner Campus · Filed Nov 10, 2025 · Source ↗
Receipt
“Lake Mariner Campus – 426 MW Critical IT • 60 MW leased by Core42 (backed by G42) ... Leased Critical Capacity: 594 MW ▪ Core42: 60 MW in 2025 ... Note: MW figures represent critical IT MW”

This presentation reports the same Core42 lease at 60 MW of critical IT load that the August presentation described as 72.5 MW gross. The difference is the measurement basis. The ten-year term comes from a presentation bullet covering the Fluidstack and Core42 contracts together; it is not a Core42-specific term statement.

Leaseheld by Core4273 MW, gross power
Attested · SEC Form 8-K by TeraWulf · TeraWulf Lake Mariner Campus · Filed Aug 14, 2025 · Source ↗
Receipt
“72.5 MW contracted to Core42 (online 2025) ... (1) Reflects planned capex spend for 72.5 MW of gross contracted HPC hosting capacity for Core42. ... Lake Mariner • Barker, NY • Core42 lease for 72.5 MW”

The presentation’s footnote defines its 72.5 MW Core42 figure as gross capacity. The later 60 MW figure measures critical IT load for the same lease; the two disclosures do not establish a fall in capacity.

Leaseheld by Core42capacity not stated in this disclosure
Attested · SEC Form 8-K by TeraWulf · TeraWulf Lake Mariner Campus · Filed Dec 23, 2024 · Source ↗
Receipt
“On December 23, 2024, TeraWulf Inc. (“TeraWulf” or the “Company”) entered into long-term data center lease agreements (the “Lease Agreements”) with Core42, a G42 company specializing in sovereign cloud, AI infrastructure, and digital services. Under the Lease Agreements, TeraWulf will deliver over 70 megawatts (“MW”) of turn-key data center infrastructure to host Core42’s deployment at the Lake Mariner facility in Upstate New York.”

TeraWulf describes more than 70 MW for Core42 without giving an exact amount. It states two five-year renewal options but no base term. The filing identifies Core42 as a G42 company.

Leaseheld by Fluidstack160 MW, critical IT load
Attested · Press release by TeraWulf · TeraWulf Lake Mariner Campus · Published Aug 18, 2025 · Source ↗
Receipt
“The expansion adds CB-5, a new purpose-built data center building providing an incremental 160 MW of critical IT load, with operations expected to commence in the second half of 2026. ... on the same economic terms as the initial Fluidstack leases for CB-3 and CB-4.”

Fluidstack exercised its option for the CB-5 building at Lake Mariner four days after the CB-3 and CB-4 agreements. The release refers to the earlier economic terms without separately stating a base duration. Operations were expected in the second half of 2026. Together, the agreements cover more than 360 MW of critical IT load, with a cumulative Google backstop of approximately $3.2 billion.

Leaseheld by Fluidstack200 MW, critical IT load10-year term
Attested · Press release by TeraWulf · TeraWulf Lake Mariner Campus · Published Aug 14, 2025 · Source ↗
Receipt
“Critical IT Load: 200+ MW; Gross Capacity: ~250 MW; Facility: Lake Mariner data center campus, Western New York... Initial Contract Value: ~$3.7 billion; Potential Total (with extensions): ~$8.7 billion... Google's Role — Backstop Amount: $1.8 billion of Fluidstack lease obligations; Equity Stake: Approximately 8% via warrants.”

The two colocation agreements cover Lake Mariner’s CB-3 and CB-4 buildings. TeraWulf expected an initial 40 MW in the first half of 2026 and the full 200-plus MW by year-end. Google backs Fluidstack’s obligations; Fluidstack is the tenant.

Suppliers and customers

Licensed supply-chain database

A licensed supply-chain database records 1 supplier of TeraWulf, named here by headquarters country. The database’s own figures are withheld.

Suppliers · 1
Ireland · 1

Kingspan Group

Known facilities

Sites whose record names this company, in any role. Each facility record states the relationship its source establishes.

FacilityRolePower
Operating capacity1 of 1 site
TeraWulf Lake Mariner CampusOperationalAI TrainingUnited StatesSite owner · Site operator · Leases out capacity510 MW

Related analysis

Source coverage

Licensed supply-chain records are available for this company. Geographic revenue, business segments and capital allocation are unavailable from the licensed financial dataset. The public industry classification (SIC, NAICS) is also unrecorded. Sources and publication limits.