Core42

No corporate parent is shown

0
ownership levels above this company
0
supply relationships · 0 with suppliers, 0 with customers
1
linked facility
0
export-control designations found
0
sovereign commitments to funds investing in this company
Scrutica id
org-core42

Ownership chain

The main chain follows the strongest parent claim by confidence, source authority and date; other named parents appear beside it. A holding reviewed as conferring no control is listed under the company it is held in, never as its parent.

  1. Core42

    Starting organisation.

End of the displayed chain

The displayed ownership chain ends at Core42

Compute arrangements

Filings and announcements recording who owns, runs or contracts compute capacity, where Core42 is one of the parties: 3 disclosures. Each is graded by its source’s authority, who disclosed it and whether its figure is an estimate.

Held by Core423 disclosuresArrangements in which Core42 is the party holding the site or its capacity.
Leasewith TeraWulf60 MW, critical IT load10-year term
Attested · SEC Form 8-K by TeraWulf · TeraWulf Lake Mariner Campus · Filed Nov 10, 2025 · Source ↗
Receipt
“Lake Mariner Campus – 426 MW Critical IT • 60 MW leased by Core42 (backed by G42) ... Leased Critical Capacity: 594 MW ▪ Core42: 60 MW in 2025 ... Note: MW figures represent critical IT MW”

This presentation reports the same Core42 lease at 60 MW of critical IT load that the August presentation described as 72.5 MW gross. The difference is the measurement basis. The ten-year term comes from a presentation bullet covering the Fluidstack and Core42 contracts together; it is not a Core42-specific term statement.

Leasewith TeraWulf73 MW, gross power
Attested · SEC Form 8-K by TeraWulf · TeraWulf Lake Mariner Campus · Filed Aug 14, 2025 · Source ↗
Receipt
“72.5 MW contracted to Core42 (online 2025) ... (1) Reflects planned capex spend for 72.5 MW of gross contracted HPC hosting capacity for Core42. ... Lake Mariner • Barker, NY • Core42 lease for 72.5 MW”

The presentation’s footnote defines its 72.5 MW Core42 figure as gross capacity. The later 60 MW figure measures critical IT load for the same lease; the two disclosures do not establish a fall in capacity.

Leasewith TeraWulfcapacity not stated in this disclosure
Attested · SEC Form 8-K by TeraWulf · TeraWulf Lake Mariner Campus · Filed Dec 23, 2024 · Source ↗
Receipt
“On December 23, 2024, TeraWulf Inc. (“TeraWulf” or the “Company”) entered into long-term data center lease agreements (the “Lease Agreements”) with Core42, a G42 company specializing in sovereign cloud, AI infrastructure, and digital services. Under the Lease Agreements, TeraWulf will deliver over 70 megawatts (“MW”) of turn-key data center infrastructure to host Core42’s deployment at the Lake Mariner facility in Upstate New York.”

TeraWulf describes more than 70 MW for Core42 without giving an exact amount. It states two five-year renewal options but no base term. The filing identifies Core42 as a G42 company.

Known facilities

Sites whose record names this company, in any role. Each facility record states the relationship its source establishes.

Power and accelerator figures are each site’s own; where this company uses or contracts a site rather than holding it, its share is not on record.
FacilityRolePower
Operating capacity1 of 1 site
TeraWulf Lake Mariner CampusOperationalAI TrainingUnited StatesAttribution withheld · Leases capacity510 MW

Related analysis

Source coverage

Geographic revenue, business segments and capital allocation are unavailable from the licensed financial dataset. No stock ticker or SEC filing identifier is recorded for Core42. The public industry classification (SIC, NAICS) is also unrecorded. Sources and publication limits.