Skip to main content

Fluidstack

HQUS

No corporate parent is shown

0
ownership levels above this company
0
supply relationships · 0 with suppliers, 0 with customers
1
linked facility
0
export-control designations found
0
sovereign commitments to funds investing in this company
Scrutica id
org-fluidstack
Name and corporate-form variants · 1 FLUIDSTACK LTD

Ownership chain

The main chain follows the strongest parent claim by confidence, source authority and date; other named parents appear beside it. A holding reviewed as conferring no control is listed under the company it is held in, never as its parent.

  1. Fluidstack (US)

    Starting organisation.

End of the displayed chain

The displayed ownership chain ends at Fluidstack

Compute arrangements

Filings and announcements recording who owns, runs or contracts compute capacity, where Fluidstack is one of the parties: 6 disclosures, of which 4 concern arrangements Fluidstack holds and 2 concern arrangements held by others with it. Each is graded by its source’s authority, who disclosed it and whether its figure is an estimate.

Held by Fluidstack4 disclosuresArrangements in which Fluidstack is the party holding the site or its capacity.
Colocationwith Cipher Digital39 MW, critical IT load10-year term
Attested · SEC Form 8-K by Cipher Digital · Filed Nov 20, 2025 · Source ↗
Receipt
“Under the Original Fluidstack Lease, Fluidstack was entitled to 168 megawatts (MW) of critical IT load for high-performance computing data center operations. The A&R Fluidstack Lease entitles Fluidstack to an additional 39 MW of critical IT load in a second phase of development (“Phase II”).”

This amendment adds 39 MW of critical IT load to Fluidstack’s original 168 MW Barber Lake lease. Cipher reports a cumulative Google backstop of $1.73 billion across the two agreements.

Colocationwith Cipher Digital168 MW, critical IT load10-year term
Attested · SEC Form 8-K by Cipher Digital · Filed Sep 25, 2025 · Source ↗
Receipt
“On September 25, 2025, Cipher Mining Inc. (the “Company”) announced that its wholly owned indirect subsidiary Cipher Barber Lake LLC (“Cipher Barber Lake”) had entered into a Datacenter Lease (the “Fluidstack Lease”) with Fluidstack USA II Inc. (“Fluidstack”) ... The Facility is expected to provide 168 megawatts (MW) of critical IT load”

Barber Lake, Colorado City, Texas. The lease names Fluidstack USA II Inc. as tenant and Cipher Barber Lake LLC as landlord. Google provides financial backing and receives warrants. Two five-year extensions could bring total contract revenue to approximately $7 billion. Cipher Mining, the name used at signing, later became Cipher Digital.

Leasewith TeraWulf160 MW, critical IT load
Attested · Press release by TeraWulf · TeraWulf Lake Mariner Campus · Published Aug 18, 2025 · Source ↗
Receipt
“The expansion adds CB-5, a new purpose-built data center building providing an incremental 160 MW of critical IT load, with operations expected to commence in the second half of 2026. ... on the same economic terms as the initial Fluidstack leases for CB-3 and CB-4.”

Fluidstack exercised its option for the CB-5 building at Lake Mariner four days after the CB-3 and CB-4 agreements. The release refers to the earlier economic terms without separately stating a base duration. Operations were expected in the second half of 2026. Together, the agreements cover more than 360 MW of critical IT load, with a cumulative Google backstop of approximately $3.2 billion.

Leasewith TeraWulf200 MW, critical IT load10-year term
Attested · Press release by TeraWulf · TeraWulf Lake Mariner Campus · Published Aug 14, 2025 · Source ↗
Receipt
“Critical IT Load: 200+ MW; Gross Capacity: ~250 MW; Facility: Lake Mariner data center campus, Western New York... Initial Contract Value: ~$3.7 billion; Potential Total (with extensions): ~$8.7 billion... Google's Role — Backstop Amount: $1.8 billion of Fluidstack lease obligations; Equity Stake: Approximately 8% via warrants.”

The two colocation agreements cover Lake Mariner’s CB-3 and CB-4 buildings. TeraWulf expected an initial 40 MW in the first half of 2026 and the full 200-plus MW by year-end. Google backs Fluidstack’s obligations; Fluidstack is the tenant.

Held by others with Fluidstack2 disclosuresArrangements another organisation holds, with Fluidstack as the other party.

One arrangement, documented in 2 disclosures.

Form not statedheld by Anthropiccapacity not stated in this disclosure$50 billion of data centres in Texas and New York, custom built for Anthropic
Attested · Press release by Fluidstack · Published Nov 12, 2025 · Source ↗ · Anthropic’s entity record
Receipt
“Fluidstack is announcing a $50 billion American computing infrastructure deal with Anthropic, building data centers in New York and Texas, with more sites to come. These facilities are custom built for Anthropic”

Fluidstack’s announcement of the same arrangement, the same day: a $50 billion deal building data centres in New York and Texas, “custom built for Anthropic”.

Form not statedheld by Anthropiccapacity not stated in this disclosure$50 billion of data centres in Texas and New York, custom built for Anthropic
Attested · Press release by Anthropic · Published Nov 12, 2025 · Source ↗ · Anthropic’s entity record
Receipt
“Today, we are announcing a $50 billion investment in American computing infrastructure, building data centers with Fluidstack in Texas and New York, with more sites to come. These facilities are custom built for Anthropic”

Anthropic announces a $50 billion investment in American computing infrastructure, building data centres with Fluidstack in Texas and New York, “custom built for Anthropic”. Neither party’s announcement says who will own, operate or lease them, so the form of control is not stated.

Sovereign investment through funds

Sovereign fund linkage is withdrawn while its fund-type and identity checks are rebuilt.

Known facilities

Sites whose record names this company, in any role. Each facility record states the relationship its source establishes.

Power and accelerator figures are each site’s own; where this company uses or contracts a site rather than holding it, its share is not on record.
FacilityRolePower
Operating capacity1 of 1 site
TeraWulf Lake Mariner CampusOperationalAI TrainingUnited StatesAttribution withheld · Leases capacity510 MW

Related analysis

Source coverage

Licensed supply-chain records are available for this company. Geographic revenue, business segments and capital allocation are unavailable from the licensed financial dataset. No stock ticker or SEC filing identifier is recorded for Fluidstack. The public industry classification (SIC, NAICS) is also unrecorded. Sources and publication limits.