Skip to main content
Record to Jun 15, 2026

Colossus 2

TypeAI TrainingStatusOperationalWhereMemphis, Tennessee, USIndexed fromEpoch AI Frontier Data Centers

Operational; xAI is recorded as owning the AI hardware inside this site

Description quoted from Epoch AI Frontier Data Centers

xAI Colossus 2 is the follow-up to Colossus 1. Like its predecessor, it is located in Memphis and was converted from an existing building. To start powering the data center, xAI made the unusual choice to install natural gas turbines across the border in Mississippi, possibly to get faster approval for their operation. We use a combination of satellite/aerial images and announcements to estimate the timeline and compute capacity of the data center.

Source: Epoch AI Frontier Data Centers, CC BY 4.0

1/3site roles identified2 site relationships1 finding in the company chain0 export-control designationsFurthest finding: company at site

Date in site records: Jun 15, 2026. Site data: Epoch AI Frontier Data Centers.

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · data to Jun 15, 2026

AI hardware owner · per catalog

xAI 1 recorded parent level 1 finding

Recorded parent Parent company

Which organisation owns the AI hardware inside it?

Colossus 2Site

AI hardware owner · per catalog xAI. Epoch AI's field for who owns the AI hardware, which it defines as not necessarily the owner or operator of the facility. source

Companies are grouped by their role at the site, with recorded parents above them. Record source: Epoch AI Frontier Data Centers; authority tier 2. Each role is drawn only as the relationship its own source establishes, listed above; none implies exclusive control of the full site. Ticks count the export-control and government-link findings for each company.
Plate II. Organisations recorded at the sitescrutica.com · data to Jun 15, 2026

Uses the compute

Anthropic

Named in Epoch AI's field for labs using the compute; it records use, not a lease.

Epoch AI Frontier Data Centers source

Uses the compute

Cursor

Named in Epoch AI's field for labs using the compute; it records use, not a lease.

Epoch AI Frontier Data Centers source

Two relationships are recorded at Colossus 2, both labelled “Uses the compute”.

Export controls and government links

No export-control designations were found in the checked company chains.

Plate III. Export controls and government linksscrutica.com · data to Jun 15, 2026
site1A company in the ownership chain is headquartered in the United States2company levels
Company at site

Headquarters jurisdiction
A company in the ownership chain is headquartered in the United States

United States: Operates the Export Administration Regulations (EAR) and the BIS Entity List under 15 CFR 730–774; deemed-export rules extend reach to foreign nationals on US soil. Export-control regimes listed for this jurisdiction: Wassenaar Arrangement, US EAR (BIS Entity List authority).

Country is the recorded headquarters location.Linked through the company recorded as owning the AI hardware inside this site.

Triangle: export-control designation or regulatory flag. Square: sovereign capital linkage. Circle: headquarters jurisdiction. Level 1 is a company at the site; higher levels are its parents. 1 finding is recorded; 0 are export-control designations.

Capacity

Reading. Power and acceleratorsscrutica.com · data to Jun 15, 2026
1.3 GW

Facility power

Estimated.

946 MW

Power for IT equipment

Estimated.

not recorded

Accelerators

An estimated 1,111,672 H100-equivalent.

xAI Colossus 2 (Memphis) has 4 records, and their power figures are never added together. Across the platform, recorded totals count the marked figure once; operating totals count a member’s figure only if it is operating capacity.

Scope: site total · Status: operational · counted in recorded totals

Colossus 2

1.3 GW · operating capacity · Epoch AI Frontier Data Centers

Scope: multi-site program total · Status: expanding

xAI Colossus Memphis

2.0 GW · not operating capacity · Press reporting

Scope: named cluster (phase 1) · Status: announced

xAI Colossus 2 Memphis Phase 1

264 MW · not operating capacity · Epoch AI GPU Clusters

Scope: named cluster (phase 2) · Status: announced

xAI Colossus 2 Memphis Phase 2

1.4 GW · not operating capacity · Epoch AI GPU Clusters

Power comparison

1.276 GW is at the 100th percentile among the 310 operating AI Training records with a reported power figure. These represent 84% of the 369 operating AI Training records tracked; announced, under-construction and campus build-out figures are not ranked. The scale ends at the largest operating figure in this group, 1.276 GW.

Data quality · 1 flag
  • When this flag was raised, the FLOP figure here diverged from Epoch AI’s published estimate by more than 50%. The record no longer has a FLOP figure.
    Curator’s working note

    When this flag was raised, this record's peak FP16 figure, 569,705 PFLOP/s, was the sum of three operational phases of xAI's Memphis cluster: Phase 1 (98,940), Phase 2 (197,885) and Phase 3 (272,880). Those are Colossus 1's phases, not this site's; the deployment linker read "Colossus 1" and "Colossus 2" as the same name. Epoch AI also chains the three cumulatively, each phase including the one before, so their sum counted the same accelerators more than once. The linker was corrected on 22 Oct 2026 and the record no longer has a peak FP16 figure. A since-retired validation table had compared the sum with four Epoch AI cluster records and reported divergences from −58.6% to +187.9%.

Methods and sources

Ownership roles

Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility.

Each role requires its own attribution. An operator named in a source supplies evidence of operation only.

Parent companies

Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented.

Level 1 identifies a company at the site, level 2 its parent, and each further level another parent. Export-control designations and government investments are assigned to the company concerned.

Missing values

Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits

Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld.

Epoch AI estimates capacity using satellite imagery, permits and corporate disclosures. Its catalog is the source for this site record.

Curator’s note on this campus

Four records describe xAI’s second Memphis-area site and overlapping projects. Power totals use Epoch’s site estimate. The announced cluster-phase figures of 264.26 and 1,409.41 MW are excluded from power totals. The 2,000 MW press figure covers the wider Memphis programme, including Colossus 1 and Colossus 2; it is retained here for comparison and is also excluded.

Browse the facilities directory or search the company directory.