Meta Prometheus

TypeAI TrainingStatusOperationalWhereNew Albany, Ohio, USIndexed fromEpoch AI Frontier Data Centers

Operational; Meta Platforms, Inc. is recorded as owning the AI hardware inside this site

Description quoted from Epoch AI Frontier Data Centers

Meta Prometheus is unusual for its ad hoc construction, spanning the full length of New Albany Business Park. A combination of weatherproof tents, colocation facilities and Meta’s traditional data center buildings, this data center shows Meta’s pivot towards AI. Reflecting that patchwork, our analysis uses a combination of land use maps, natural gas turbine permitting, and satellite/aerial imagery of cooling equipment to estimate compute capacity.

Source: Epoch AI Frontier Data Centers, CC BY 4.0

1/3site roles identified2 site relationships1 finding in the company chain0 export-control designationsFurthest finding: company at site

Date in site records: Aug 31, 2026. Site data: Epoch AI Frontier Data Centers.

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · data to Aug 31, 2026

AI hardware owner · per catalog

Meta Platforms, Inc. parent ownership unresolved 1 finding

Which organisation owns the AI hardware inside it?

Meta PrometheusSite

AI hardware owner · per catalog Meta Platforms, Inc. Epoch AI's field for who owns the AI hardware, which it defines as not necessarily the owner or operator of the facility. source

Companies are grouped by their role at the site, with recorded parents above them. No parent companies were found in the ownership data. Further ownership remains unresolved where labelled. Record source: Epoch AI Frontier Data Centers; authority tier 2. Each role is drawn only as the relationship its own source establishes, listed above; none implies exclusive control of the full site. Ticks count the export-control and government-link findings for each company.
Plate II. Organisations recorded at the sitescrutica.com · data to Aug 31, 2026

Power provider

American Electric Power

Named in Epoch AI's field for companies involved in providing power to the site.

Epoch AI Frontier Data Centers source

Power provider

Williams

Named in Epoch AI's field for companies involved in providing power to the site.

Epoch AI Frontier Data Centers source

Two relationships are recorded at Meta Prometheus, both labelled “Power provider”.

Export controls and government links

No export-control designations were found in the checked company chains.

Plate III. Export controls and government linksscrutica.com · data to Aug 31, 2026
site1A company in the ownership chain is headquartered in the United Statescompany levels
Company at site

Headquarters jurisdiction
A company in the ownership chain is headquartered in the United States

United States: Operates the Export Administration Regulations (EAR) and the BIS Entity List under 15 CFR 730–774; deemed-export rules extend reach to foreign nationals on US soil. Export-control regimes listed for this jurisdiction: Wassenaar Arrangement, US EAR (BIS Entity List authority).

Country is the recorded headquarters location.Linked through the company recorded as owning the AI hardware inside this site.

Triangle: export-control designation or regulatory flag. Square: sovereign capital linkage. Circle: headquarters jurisdiction. Level 1 is a company at the site; higher levels are its parents. 1 finding is recorded; 0 are export-control designations.

Capacity

Reading. Power and acceleratorsscrutica.com · data to Aug 31, 2026
612 MW

Facility power

Estimated.

471 MW

Power for IT equipment

Estimated.

not recorded

Accelerators

An estimated 536,343 H100-equivalent.

Meta New Albany (Prometheus) has 3 records, and their power figures are never added together. Across the platform, recorded totals count the marked figure once; operating totals count a member’s figure only if it is operating capacity. Measurement scope is unrecorded for 3 of them.

Scope: not stated · Status: operational · counted in recorded totals

Meta Prometheus

612 MW · operating capacity · Epoch AI Frontier Data Centers

Scope: not stated · Status: announced

Meta Prometheus New Albany

1.3 GW · not operating capacity · Epoch AI GPU Clusters

Scope: not stated · Status: operational

Meta New Albany Data Center

no power figure · Documented ownership record

Power comparison

612 MW is at the 99th percentile among the 310 operating AI Training records with a reported power figure. These represent 84% of the 369 operating AI Training records tracked; announced, under-construction and campus build-out figures are not ranked. The scale ends at the largest operating figure in this group, 1,276 MW.

Methods and sources

Ownership roles

Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility.

Each role requires its own attribution. An operator named in a source supplies evidence of operation only.

Parent companies

Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented.

Level 1 identifies a company at the site, level 2 its parent, and each further level another parent. Export-control designations and government investments are assigned to the company concerned.

Missing values

Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits

Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld.

Epoch AI estimates capacity using satellite imagery, permits and corporate disclosures. Its catalog is the source for this site record.

Curator’s note on this campus

Three records describe Meta’s Prometheus campus at New Albany. The grouping cites Spectrum News 1’s 17 November 2025 report naming Prometheus at that location. Power totals use Epoch’s site estimate and exclude the overlapping 1,281.28 MW cluster figure. The cluster is announced, so its 500,000 accelerators count in recorded accelerator totals but not in operating ones. The OpenStreetMap record has no capacity figures. Reports of gigawatt-scale expansion make this estimate due for review when a site-level source states the completed capacity.