Announced commitments against government budgets and reported disbursements, by country.
Announced commitments against government budgets and reported disbursements, by country.
Sovereign programme record · United Arab Emirates · 2024–2029
Every figure below derives from the same record the dashboard reads — this page is the programme as a citable object: the reconciliation with its denominator stated, the decomposition with its residual, and the dated evidence behind each claim. $500B of the announced figure is UNVERIFIED — the record’s own flag, verbatim: The $500B total is unverified: it represents the 5 GW campus aspiration, and the first-cluster financial commitment beyond Phase 1 is not publicly disclosed in primary sources. A previously cited $20B attributed to OpenAI via The National was incorrect — that article covered Aleria, a separate UAE AI venture, not Stargate UAE — and the figure has been removed pending a primary source for any first-cluster dollar attribution.
Pipeline stage: Deployed (primary-verified evidence) — 4,000 accelerators tracked. The stage is a Scrutica derivation (tier 4), computed from the figures above, never asserted by the source.
| Component | Kind | Amount |
|---|---|---|
| UAE Stargate project (OpenAI/Oracle/NVIDIA/Cisco; 5 GW aspirational total) UNVERIFIED | Foreign direct investment | $500B |
| Microsoft cumulative AI infrastructure pledge through 2029 (subsumes prior $1.5B Apr 2024 G42 equity; $4.6B+ datacenter capex; $1.2B+ local OpEx + COGS; remainder forward-pledged through 2029) | Foreign direct investment | $15.20B |
| Abu Dhabi Government Digital Strategy 2025-2027 (incl. Oracle Sovereign AI Supercluster, 4,000+ NVIDIA Blackwell GPUs in OCI Abu Dhabi region) | Government | $3.54B |
The residualThe amount-bearing components sum to $519B against the $519B headline — they reconcile.
| Model | Count | Status | Owner |
|---|---|---|---|
| NVIDIA DGX H100 (Core42 AI Cloud) | — | operational | Core42 (G42 subsidiary) |
| NVIDIA Blackwell (Oracle OCI Supercluster, Abu Dhabi region) | 4,000 | operational | Oracle Cloud Infrastructure (delivering compute for Abu Dhabi Government Digital Strategy 2025-2027) |
| Partner | GPUs | Model | Stage | Award |
|---|---|---|---|---|
| G42 | — | NVIDIA Grace Blackwell GB300 | announced | Primary source · 2025-05-22 |
| Khazna Data Centers | — | — | announced | Research database · 2025-10-16 |
| OpenAI | — | — | announced | Primary source · 2025-05-22 |
| Oracle | — | — | announced | Primary source · 2025-05-22 |
| NVIDIA | — | NVIDIA Grace Blackwell GB300 | announced | Primary source · 2025-05-22 |
| Cisco | — | — | announced | Primary source · 2025-05-22 |
| SoftBank Group | — | — | announced | Primary source · 2025-05-22 |
NVIDIA hardware: high · TSMC fabrication: high · US technology: high · BIS jurisdiction reach: low. Dependence levels are Scrutica classifications (tier 4) from the programme’s own disclosures — which hardware it buys, where it fabricates, and whose export jurisdiction its supply chain crosses.
Named partners: Microsoft, OpenAI, NVIDIA, Oracle, Cisco, SoftBank, Technology Innovation Institute (TII), G42, Core42, Khazna Data Centers, Abu Dhabi Department of Government Enablement (DGE).
Three concurrent UAE vehicles, each carried as its own entry in the decomposition of the announced figure. Stargate UAE is $500B aspirational, with Phase 1 at 200 MW in Q3 2026. Microsoft's cumulative $15.2B through 2029 comprises $1.5B of April 2024 G42 equity (subsumed within the later figure), $4.6B+ of datacenter capex, $1.2B+ of local operating expenditure, and forward pledges; the 200 MW Khazna datacenter expansion comes online before end-2026. The Abu Dhabi Government Digital Strategy 2025-2027 is $3.54B, with the Oracle Sovereign AI Supercluster — 4,000+ NVIDIA Blackwell GPUs in the OCI Abu Dhabi region, operational November 2025 — as its compute substrate. G42 divested its Chinese technology holdings in 2024 as a condition of the Microsoft investment, and received US chip export approval in November 2025. MGX Fund I closed at $49B on 2026-07-01; that is investment-vehicle context and is not counted toward compute-capacity totals.
Machine surfacesThis record is one object under one id: the evidence-trail feed and the derivation-chain export serialize the same programme this page renders.