Skip to main content
ScruticaOpen data and analysis for AI compute governance

Sovereign AI Programmes

Sweden sovereign AI programme

Sweden had two systems of 752 and 128 accelerators in operation.

Berzelius, 2024–2026; the record also covers MIMER AI Factory (EuroHPC)

Sweden
Accelerators752 and 128 operating
A full bar is 300,000 accelerators. Each system in operation is a segment of its own, and no total is printed, since two records can describe one machine.

Systems

Two from the programme’s hardware records and one from its partners’ allocations; the pale row is under way.

The programme’s systems
Under wayNAISSGB200
In operationLinköping UniversityA100
In operationLinköping UniversityH200

Funding

state an allocation of 80 million SEK, 2026.

Chips and rules

Accelerators
NVIDIA’s accelerators are in all three of its systems.Chip makers’ product pages
Fabrication
fabricates the Hopper and Blackwell parts that two of its systems name.Chip makers’ product pages
US export rules
Sweden is in , outside the groups where exporting advanced AI chips needs a licence from the US Bureau of Industry and Security (BIS).Electronic Code of Federal Regulations, 29 Oct 2026
Scrutica’s rating
Scrutica rates the programme’s dependence on NVIDIA hardware and on US technology high, on a scale of none, low, medium and high.A qualitative assessment of the programme’s chips, partners and supplier relationships, as none, low, medium or high

Sites

Sites on record in the programme’s country, or owned by its own body.

Sites on record
Owner
Arrhenius (EuroHPC)Linköping, SwedenUnder constructionEuroHPC JU

Partners

2 partners by procurement stage, besides the operators in Systems, and 6 more named in the programme’s sources.

Awarded, 1
Named in sources
Knut and Alice Wallenberg Foundation, Linköping University, Eviden, AI Sweden, EuroHPC JU, Swedish Research Council

Sources

8 sources
Data
How the figures were made

Operating compute / delivered hardware. Reported operational or delivered: 752 NVIDIA A100 (physical hardware); 128 NVIDIA H200 (physical hardware). The stage is assigned from reported hardware status, disbursements and commitments.

Berzelius at Linköping University has 752 A100 GPUs and 128 H200 GPUs across 110 DGX nodes. The Knut and Alice Wallenberg Foundation funded the system and its expansions. MIMER’s April 2026 procurement selected Bull to supply a separate system with 400 GB200 GPUs, with installation planned later in 2026. Its approximately €30 million budget covers acquisition, delivery, installation and maintenance; Sweden and EuroHPC each fund half.

Caveats on this record, 3

  • The Swedish government’s September 2025 budget proposal included SEK479 million for AI and data reforms in 2026. This broader package does not provide a dollar-denominated programme total.
  • The Berzelius inventory comprises 94 eight-A100 nodes and 16 eight-H200 nodes. Its operator dates the latest expansion to 2025.
  • Ericsson, AstraZeneca, SAAB, SEB and Wallenberg Investments announced a separate company-led AI Factory in May 2025, with two planned DGX SuperPODs using GB300 systems.
Identifiers
Scrutica ID
sovereign-se
Country code
SE
Name in the record
Sweden: Berzelius + MIMER AI Factory (EuroHPC)