Capacity, hardware inventory, ownership chain, and supply-chain position for Giga Texas Data Center. Any export-control exposure is walked through the canonical organization graph — surfacing when the BIS Entity List touches a node above the facility in the chain — rather than asserted at the facility row.
As of 2026-07-27
Description
Grid queue discovery: ERCOT queue #25INR0688. Applicant: Giga Texas Energy, LLC (Tesla subsidiary). Classification: genuine_dc. Interconnection: HORNSBY Substation, 345kV (behind-meter at 24.9kV)
Notes
Queue ID: 25INR0688. Interconnecting Entity: Giga Texas Energy, LLC. Gen Type: Other - Battery Energy Storage (NOTE: Filed as battery storage interconnection, facility is data center per project name).
nyiso_ercot_grid_queue_id_scheme_merge — Merged duplicate grid-queue facility fac-grid-ercot-25INR0688 (data_source='scrutica-grid-queue-discovery', a one-time research/discovery pass) into the canonical, actively-refreshed gridstatus-ercot-25INR0688 (data_source='gridstatus'). Both represent the same NYISO/ERCOT interconnection queue position (exact queue_id match, exact power_capacity_mw match: 133 MW). fac-grid-ercot-25INR0688's richer applicant/classification/interconnection research was merged into this row's description/notes/source_url before deletion. Audit finding: NYISO + ERCOT grid-queue double-ingestion, 2026-07-10 (6.85% US power_capacity_mw inflation).