Abernathy HPC Campus
TypeAI TrainingStatusUnder constructionWhereAbernathy, Texas, USIndexed fromSEC EDGAR
No organisation is recorded as holding this site, running it, or owning the AI hardware inside it
A liquid-cooled AI data centre at Abernathy, Texas, designed for up to 240 MW of gross power and 168 MW of critical IT load, leased to Fluidstack under a 25-year lease with Google backing. A joint venture of TeraWulf and Fluidstack was building it in May 2026 for delivery in the fourth quarter of 2026, and in July 2026 TeraWulf agreed to sell its 50.1% stake to an investor group led by Fluidstack.
Source: SEC EDGAR
0/3site roles identified0 site relationships0 findings · no company identified
Date in site records: Dec 29, 2025. Site data: SEC EDGAR.
Ownership and operation
Plate I. Site owner, operator and hardware ownerscrutica.com · data to Dec 29, 2025
Abernathy HPC CampusSite
Export controls and government links
No site owner, operator or hardware owner is identified, so the company checks could not run.
Capacity
240 MW
Facility power
Source-reported power. Not operating capacity: under construction.
168 MW
Power for IT equipment
Source-reported power.
not recorded
Accelerators