Skip to main content

YTL Johor

TypeAI TrainingStatusOperationalWhereJohor, MYIndexed fromEpoch AI Frontier Data Centers

No organisation is recorded as holding this site, running it, or owning the AI hardware inside it

0/3site roles identified0 site relationships0 findings · no company identified

Date in site records: Jul 13, 2026. Site data: Epoch AI Frontier Data Centers.

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · data to Jul 13, 2026
YTL JohorSite
Companies are grouped by their role at the site, with recorded parents above them. No company is identified in these roles, so their ownership chains could not be checked.

Export controls and government links

No site owner, operator or hardware owner is identified, so the company checks could not run.

Capacity

155 MW

Facility power

Estimated.

113 MW

Power for IT equipment

Estimated.

not recorded

Accelerators

An estimated 153,532 H100-equivalent.

YTL Green Data Center Campus, Kulai, Johor has 2 records, and their power figures are never added together:

  • YTL Johor155 MW, operational, scope: current deployment, operating capacity. Epoch AI Frontier Data Centers
  • YTL AI Johor37 MW, announced, scope: named cluster, not operating capacity. Epoch AI GPU Clusters

Power comparison

155 MW is at the 89th percentile among the 310 operating AI Training records with a reported power figure. These represent 84% of the 369 operating AI Training records tracked; announced, under-construction and campus build-out figures are not ranked. The scale ends at the largest operating figure in this group, 1,276 MW.