Skip to main content

Nscale Keflavik

TypeAI TrainingStatusOperationalWhereSuðurnes, ISIndexed fromEpoch AI Frontier Data Centers

Operational; Nscale is recorded as owning the AI hardware inside this site

1/3site roles identified0 site relationships1 finding in the company chain0 export-control designationsFurthest finding: company at site

Date in site records: Jul 27, 2026. Site data: Epoch AI Frontier Data Centers.

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · data to Jul 27, 2026

AI hardware owner · per catalog

Nscale parent ownership unresolved 1 finding

Which organisation owns the AI hardware inside it?

Nscale KeflavikSite

AI hardware owner · per catalog Nscale. “Owner: Nscale #confident” source

Companies are grouped by their role at the site, with recorded parents above them. No parent companies were found in the ownership data. Further ownership remains unresolved where labelled. Record source: Epoch AI Frontier Data Centers; authority tier 2. Ticks count the export-control and government-link findings for each company.

Export controls and government links

No export-control designations were found in the checked company chains.

Plate III. Export controls and government linksscrutica.com · data to Jul 27, 2026
site1A company in the ownership chain is headquartered in the United Kingdomcompany levels
Company at site

Headquarters jurisdiction
A company in the ownership chain is headquartered in the United Kingdom

United Kingdom: Post-Brexit operates its own dual-use control regime via the Export Control Joint Unit (ECJU); UK Sanctions and Anti-Money Laundering Act 2018 underpins targeted measures. Export-control regimes listed for this jurisdiction: Wassenaar Arrangement, UK Strategic Export Controls.

Triangle: export-control designation or regulatory flag. Square: sovereign capital linkage. Circle: headquarters jurisdiction. Level 1 is a company at the site; higher levels are its parents.

Capacity

7 MW

Facility power

Estimated.

5 MW

Power for IT equipment

Estimated.

not recorded

Accelerators

An estimated 5,821 H100-equivalent.

Power comparison

6.64 MW is at the 68th percentile among the 310 operating AI Training records with a reported power figure. These represent 84% of the 369 operating AI Training records tracked; announced, under-construction and campus build-out figures are not ranked. The scale ends at the largest operating figure in this group, 1,276 MW.