Taiwan sovereign AI programme

Taiwan had two systems of 1,760 and 144 accelerators in operation.

AI New Ten Major Construction, 2025–2029; the record also covers NCHC Sovereign Compute

Accelerators1,760 and 144 operating
A full bar is 300,000 accelerators. Each system in operation is a segment of its own, and no total is printed, since two records can describe one machine.

Systems

Two hardware records. Each is run by NCHC.

The programme’s systems
In operationH200
In operationGB200

Funding

Funding components
Government

Money on record

state an allocation of 31.1 billion TWD, 2026.

Chips and rules

Accelerators
NVIDIA’s accelerators are in both of its systems.Chip makers’ product pages
Fabrication
fabricates the Hopper and Blackwell parts that two of its systems name.Chip makers’ product pages
US export rules
Taiwan is in , outside the groups where exporting advanced AI chips needs a licence from the US Bureau of Industry and Security (BIS).Electronic Code of Federal Regulations, 29 Oct 2026
Scrutica’s rating
Scrutica rates the programme’s dependence on NVIDIA hardware and on US technology high, on a scale of none, low, medium and high.A qualitative assessment of the programme’s chips, partners and supplier relationships, as none, low, medium or high

Partners

6 partners by procurement stage and 6 more named in the programme’s sources.

In service, 1
Named in sources
NCHC, NSTC, NDC, AMD, Hon Hai (Foxconn), Visionbay.ai

Sources

15 sources
SourceDate
NCHC Nano4 specification: 220 eight-H200 nodes and two 72-Blackwell-GPU GB200 NVL72 systems8 Sep 2026
NCHC, 1 June 2026: Nano4 service begins, June trial period and July charging schedule8 Sep 2026
NVIDIA, 18 May 2025: planned H200, GB200 NVL72 and HGX B300 systems; announcement is not evidence of commissioning8 Sep 2026
NSTC, 15 April 2024: TAIDE-LX-7B model released for download8 Sep 2026
Official AI Basic Act: promulgated 14 January 2026 and effective on promulgation under Article 208 Sep 2026
Executive Yuan, 20 August 2026: central-budget review completed; aggregate cuts/freezes do not identify final programme-level AI funding8 Sep 2026
Ten AI Initiatives (NDC official)7 Apr 2026
Taiwan AI RAP (TAIWAN AI RAP): government-funded AI application development platform
Central Weather Administration, 16 May 2025: Taiwan Compute Alliance members and the agency’s weather-computing role8 Sep 2026
WiAdvance, 23 May 2023: company English name and cloud-services business; identity support for 緯謙科技 in the alliance roster8 Sep 2026
Ubilink company About page: bilingual company name and HPC/AI services8 Sep 2026
DGBAS, 21 August 2025, §5(5): Cabinet-approved FY2026 draft assigns NT$31.1B to the Ten AI Initiatives, comprising NT$28B central budget and NT$3.1B business/non-business funds; submission to legislature follows8 Sep 2026
Tainan sovereign AI data center opening28 Mar 2026
TechSoda, 18 June 2025: draft NT$200B / US$6.2B plan and proposed NT$90B / US$2.8B expansion, pending Executive Yuan submission and approval8 Sep 2026
Taiwan Compute Alliance and strategy analysis28 Mar 2026
Data
How the figures were made

Operating compute / delivered hardware. Reported operational or delivered: 1,760 NVIDIA H200 (physical hardware); 144 NVIDIA Blackwell (GB200 NVL72) (physical hardware). The stage is assigned from reported hardware status, disbursements and commitments.

NCHC opened Nano4 for service on 1 June 2026. Its configuration includes 1,760 H200 GPUs and two GB200 NVL72 systems with 144 Blackwell GPUs between them. NVIDIA's May 2025 announcement also included an HGX B300 system; NCHC’s Nano4 specification lists H200 and GB200 NVL72 hardware, with no B300 entry. Taiwan has released TAIDE language models, beginning with TAIDE-LX-7B in April 2024. The AI Basic Act took effect on 14 January 2026. The Executive Yuan reported completion of the 2026 central-budget review in August; the statement gives no programme-specific AI appropriation.

Caveats on this record, 5

  • The Nano4 counts use accelerator units: 220 nodes with eight H200 GPUs each, plus two GB200 NVL72 systems with 72 Blackwell GPUs each.
  • A current installed GPU count for the HGX B300 system in NVIDIA’s May 2025 announcement has not been established; it is excluded from the hardware total.
  • TechSoda reported a draft of approximately NT$200B (US$6.2B) in June 2025, including a proposed NT$90B (US$2.8B) expansion from science, construction and National Development Fund budgets. The report anticipated submission for Executive Yuan approval later that month.
  • The Cabinet’s August 2025 draft for FY2026 assigned NT$31.1B to the Ten AI Initiatives: NT$28B in the central budget and NT$3.1B from business and non-business funds. It then went to the legislature. The August 2026 central-budget completion statement gives no final programme amount.
  • The hardware entries cover the two named Nano4 configurations. They exclude other NCHC systems.
Identifiers
Scrutica ID
sovereign-tw
Country code
TW
Name in the record
Taiwan: AI New Ten Major Construction + NCHC Sovereign Compute