€5.6 million spent by December 2025, 12 months after the 2025 budget year began, of the €128 million national contribution budgeted for the AI factory over 2025-2030. The Ministry of Economic Affairs' 2025 annual report shows €5.6 mln paid in 2025 on the AI-fabriek subsidy line, against the €127.9 mln national contribution the Minister set out for 2025-2030 (raised to €130.935 mln, without a period, in December 2025); the 2027 draft budget moves most of the 2026 cash into 2027-2031.
A part of the programme. Both budget lines fund the subsidy to the consortium (Stichting Nederlandse AI-fabriek, SURF, AIC4NL, Samenwerking Noord, TNO) for the Groningen AI factory: 'AI-fabriek' pools the €70.935 mln from six ministries and 'PEGA – AI-fabriek' carries the €60 mln from the Nij Begun economic agenda, which the government calls the region's contribution but which is appropriated on the national EZ budget. Excluded: EuroHPC's €71.7 mln (EU money) and Snellius (the second line). The budget is the Minister's September 2025 total with its 2025-2030 annual profile, the only statement of the national contribution that gives a period; the December 2025 total (€130.935 mln, no period) and the 2027 draft budget (cash to 2031, subsidy end year 2031) are kept among the line's figures.
In a budget estimate: the €128 million national contribution budgeted for the AI factory over 2025-2030, January 2025 to December 2030. Printed as “€ 127,9 mln”. About $150M at the reference rate of 26 Sep 2025. Totaal bezien bedraagt de nationale bijdrage aan de AI-fabriek € 127,9 mln. [...] (in duizendtallen): 2025: € 500 2026: € 42.097 2027: € 17.598 2028: € 16.739 2029: € 15.379 2030: € 35.622 (In total the national contribution to the AI factory is €127.9 mln. [...] (in thousands): 2025: €500; 2026: €42,097; 2027: €17,598; 2028: €16,739; 2029: €15,379; 2030: €35,622.)
Tweede Kamer der Staten-Generaal (Officiële bekendmakingen); answers of the Minister of Economic Affairs, Kamerstuk 36 820 XIII, nr. 4: Verslag houdende een lijst van vragen en antwoorden (suppletoire begroting EZ 2025, wijziging samenhangende met de Miljoenennota); answers by letter of 26 September 2025, questions 6 and 7, 29 Sep 2025
Spent: €5.6 million by 31 Dec 2025. Printed as “5.600”. 12 of the budget’s 72 months had passed. About $7M at the reference rate of 31 Dec 2025. Tabel 7 Budgettaire gevolgen van beleid artikel 1 (bedragen x € 1.000) [...] AI-fabriek 5.600 5.600 (Table 7 Budgetary consequences of policy, article 1 (amounts x €1,000) [...] AI factory: 2025 outturn 5,600; difference from the approved 2025 budget 5,600.)
Ministry of Economic Affairs; Tweede Kamer der Staten-Generaal (Officiële bekendmakingen), Kamerstuk 36 945 XIII, nr. 1: Jaarverslag Ministerie van Economische Zaken 2025, Tabel 7 'Budgettaire gevolgen van beleid artikel 1 (bedragen x € 1.000)', row 'AI-fabriek': Realisatie 2025 = 5.600; Vastgestelde begroting 2025 blank; Verschil 2025 = 5.600 (PDF page 53), 20 May 2026
Committed: €132 million, 31 Dec 2025. Printed as “€ 131,5 mln”. The legal commitment entered in 2025 when the subsidy was awarded to the consortium at the end of 2025; a commitment, not spending. It differs from the €127.9 mln budget (September 2025) and the €130.935 mln stated in December 2025; no document read reconciles the three. Het aangaan van de verplichting voor het realiseren van de AI-fabriek (€ 131,5 mln). Deze middelen waren nog niet geraamd bij de Ontwerpbegroting aangezien zij pas zijn toegekend bij de eerste suppletoire begroting. (Entering into the commitment to build the AI factory (€131.5 mln). These funds were not yet in the draft budget because they were only granted in the first supplementary budget.)
Ministerie van Financiën (rijksfinancien.nl) for the Ministry of Economic Affairs, Jaarverslag Ministerie van Economische Zaken 2025 (Kamerstuk 36 945 XIII, nr. 1), artikel 1, toelichting verplichtingen (rijksfinancien.nl edition), Artikel 1, E. Toelichting op de financiële instrumenten, Verplichtingen (PDF edition page 54), 20 May 2026
Announced: €131 million, 19 Dec 2025. Printed as “€ 130,935 mln.”. The cabinet's later statement of the same national contribution (six ministries €70.935 mln plus Nij Begun €60 mln), €3.035 mln above the September 2025 allocation used as the budget. It states no period, so it cannot be the line's budget; both are recorded because the government states the quantity differently. Het gaat om een investering van in totaal € 202,635 mln., waarvan € 71,7 miljoen van EuroHPC JU komt en € 130,935 mln. van Rijk en regio. (It is an investment of €202.635 mln in total, of which €71.7 million comes from the EuroHPC JU and €130.935 mln from the central government and the region.)
Tweede Kamer der Staten-Generaal (Officiële bekendmakingen); letter of the Minister of Economic Affairs and the State Secretary of the Interior, Kamerstuk 26 643, nr. 1451: Brief regering, Voortgang AI-fabriek en AI-gigafabrieken initiatief, Bijlage 1 'Kader Beleidskeuzes uitgelegd – AI-fabriek in Groningen' (CW 3.1), Bijlage 1, section 3 'Financiële gevolgen voor het Rijk & maatschappelijke sectoren' (PDF page 6), 19 Dec 2025
Announced: €70.9 million, 19 Dec 2025. Printed as “€ 70.935.000,-”. The six ministries' share of the €130.935 mln: Economic Affairs €31 mln, Defence €30 mln, Education €3.935 mln, Interior €2 mln, Agriculture €2 mln, Health €2 mln; transferred to the EZ 'AI-fabriek' line. Vanuit het Rijk is in totaal € 70.935.000,- aan middelen gereserveerd, te weten: Ministerie van Economische Zaken (€ 31mln.); Ministerie van Defensie (€ 30mln.); Ministerie van Onderwijs, Cultuur en Wetenschappen (€ 3,935mln.) [...] Ministerie van Volksgezondheid, Welzijn en Sport (€ 2mln.). (From central government a total of €70,935,000 has been reserved: Economic Affairs (€31 mln); Defence (€30 mln); Education, Culture and Science (€3.935 mln) [...] Health, Welfare and Sport (€2 mln). [The elided entries are Interior €2 mln and Agriculture €2 mln.])
Tweede Kamer der Staten-Generaal (Officiële bekendmakingen); letter of the Minister of Economic Affairs and the State Secretary of the Interior, Kamerstuk 26 643, nr. 1451: Brief regering, Voortgang AI-fabriek en AI-gigafabrieken initiatief, Bijlage 1 'Kader Beleidskeuzes uitgelegd – AI-fabriek in Groningen' (CW 3.1), Bijlage 1, section 3 'Financiële gevolgen voor het Rijk & maatschappelijke sectoren' (PDF page 6), 19 Dec 2025
Announced: €60 million, 19 Dec 2025. Printed as “€ 60 mln.”. The 'regional' share from the Nij Begun economic agenda, budgeted on the EZ line 'PEGA – AI-fabriek'. Vanuit de regio, is € 60 mln. aan middelen gereserveerd, te weten: Regio Groningen en Noord-Drenthe vanuit de Economische Agenda van Nij Begun (€ 60mln.). (From the region €60 mln has been reserved: the Groningen and North Drenthe region from the Nij Begun Economic Agenda (€60 mln).)
Tweede Kamer der Staten-Generaal (Officiële bekendmakingen); letter of the Minister of Economic Affairs and the State Secretary of the Interior, Kamerstuk 26 643, nr. 1451: Brief regering, Voortgang AI-fabriek en AI-gigafabrieken initiatief, Bijlage 1 'Kader Beleidskeuzes uitgelegd – AI-fabriek in Groningen' (CW 3.1), Bijlage 1, section 3 'Financiële gevolgen voor het Rijk & maatschappelijke sectoren' (PDF page 6), 19 Dec 2025
Announced: €71.7 million, 13 Oct 2025. Printed as “€ 71,7 miljoen”. EuroHPC co-financing approved by its Governing Board on 9 October 2025; EU money, which belongs to the EuroHPC row. The same letter rounds the national and regional reservation to €130 million. Het gaat om een bijdrage van ongeveer € 71,7 miljoen, in aanvulling op de reeds gereserveerde bijdrage van € 130 miljoen van Rijk en regio. (It is a contribution of about €71.7 million, in addition to the contribution of €130 million already reserved by central government and the region.)
Tweede Kamer der Staten-Generaal (Officiële bekendmakingen); letter of five ministers led by Economic Affairs, Kamerstuk 26 643, nr. 1424: Brief regering, Honorering EU-financiering voor de AI-fabriek in Groningen, section 'Besluit van de EuroHPC Governing Board' (PDF page 2), 13 Oct 2025
Annual appropriation: €500,000, 2 Apr 2026. Printed as “500”. 2026 cash appropriation for the 'AI-fabriek' line after the first supplementary budget (enacted 8 July 2026). AI-fabriek 500 500 500 (AI factory: 500 (draft budget 2026), 500 (approved budget 2026), 500 (after the first supplementary budget), in thousands of euros.)
Ministerie van Financiën (rijksfinancien.nl) for the Ministry of Economic Affairs, Kamerstuk 36 915 XIII, nr. 2: Memorie van toelichting, wijziging van de begrotingsstaten van het Ministerie van Economische Zaken (XIII) voor 2026 (Voorjaarsnota); enacted by the Wet van 8 juli 2026 (Stb. 2026, 242), Tabel 4 'Budgettaire gevolgen van beleid art. 1 Goed functionerende economie en markten (Eerste suppletoire begroting) (bedragen x € 1.000)', row 'AI-fabriek': Ontwerpbegroting 2026 500, Vastgestelde begroting 2026 500, Stand 1e suppletoire begroting 500, 2 Apr 2026
Annual appropriation: €41.6 million, 2 Apr 2026. Printed as “41.597”. 2026 cash appropriation for the 'PEGA – AI-fabriek' line after the first supplementary budget. PEGA – AI-fabriek 41.597 41.597 41.597 (PEGA – AI factory: 41,597 in the draft, approved and first-supplementary 2026 budgets, in thousands of euros.)
Ministerie van Financiën (rijksfinancien.nl) for the Ministry of Economic Affairs, Kamerstuk 36 915 XIII, nr. 2: Memorie van toelichting, wijziging van de begrotingsstaten van het Ministerie van Economische Zaken (XIII) voor 2026 (Voorjaarsnota); enacted by the Wet van 8 juli 2026 (Stb. 2026, 242), Tabel 4 (as above), row 'PEGA – AI-fabriek': 41.597 in each of the three columns, 2 Apr 2026
Revised estimate: €481,000, 15 Sep 2026. Printed as “481”. The 2026 figure for 'AI-fabriek' in the 2027 draft budget (500 in the spring appropriation); the same row gives 351 for 2027, 0 for 2028, then 17,330, 18,294 and 30,257 for 2029-2031 (thousands). AI-fabriek 5.600 481 351 0 17.330 18.294 30.257 Geen 2029 2031 (AI factory: 2025 5,600; 2026 481; 2027 351; 2028 0; 2029 17,330; 2030 18,294; 2031 30,257 (thousands of euros); last evaluation none; next evaluation 2029; subsidy end year 2031.)
Ministerie van Financiën (rijksfinancien.nl) for the Ministry of Economic Affairs and Climate, Kamerstuk 37 020 XIII, nr. 2: Memorie van toelichting, begroting Ministerie van Economische Zaken en Klimaat 2027 (rijksfinancien.nl edition), Tabel 58 'Subsidies (bedragen x € 1.000)', row 'AI-fabriek': 2025 5.600, 2026 481, 2027 351, 2028 0, 2029 17.330, 2030 18.294, 2031 30.257; next evaluation 2029; subsidy end year 2031 (same 2025-2031 figures in Tabel 10, artikel 1), 15 Sep 2026
Revised estimate: €1.4 million, 15 Sep 2026. Printed as “1.396”. The 2026 figure for 'PEGA – AI-fabriek' in the 2027 draft budget, down from the 41,597 appropriated in spring 2026; 38,109 now falls in 2027 and the rest in 2028-2031. No document read explains the shift. PEGA - AI-fabriek 0 1.396 38.109 15.410 2.397 0 2.688 Geen 2029 2031 (PEGA – AI factory: 2025 0; 2026 1,396; 2027 38,109; 2028 15,410; 2029 2,397; 2030 0; 2031 2,688 (thousands of euros); next evaluation 2029; subsidy end year 2031.)
Ministerie van Financiën (rijksfinancien.nl) for the Ministry of Economic Affairs and Climate, Kamerstuk 37 020 XIII, nr. 2: Memorie van toelichting, begroting Ministerie van Economische Zaken en Klimaat 2027 (rijksfinancien.nl edition), Tabel 58 (as above), row 'PEGA - AI-fabriek': 2025 0, 2026 1.396, 2027 38.109, 2028 15.410, 2029 2.397, 2030 0, 2031 2.688, 15 Sep 2026
rijksfinancien.nl (Ministry of Finance budget site), Ministry of Economic Affairs chapter XIII: Ontwerpbegroting 2026 and 2027; eerste suppletoire begroting 2025 and 2026; tweede suppletoire begroting 2025; Jaarverslag 2025 (article 1 tables and explanations). AI-fabriek and PEGA – AI-fabriek lines on article 1 from 2025: realisation 2025 5,600 thousand (all on AI-fabriek), commitment €131.5 mln in 2025, 2026 appropriation 500 + 41,597 thousand, re-phased in the 2027 draft to 481 + 1,396 for 2026. No 2026 realisation is published before the 2026 annual report. rijksfinancien.nl (Ministry of Finance budget site), Ministry of Economic Affairs chapter XIII, 2 Nov 2026
Officiële bekendmakingen (repository.overheid.nl SRU search): All 220 official publications matching 'AI-fabriek' (2024-06 to 2026-10) listed and screened by title; read: Kamerstukken 26 643 nrs. 1354, 1424, 1451, 1538; 36 820 XIII nrs. 2 and 4; 36 800 XIII nr. 3; 36 850 XIII nrs. 2 and 4; 36 915 XIII nr. 3; 36 945 XIII nr. 1; 37 020 XIII Q&A (kst-1275767); 37 035 VIII nr. 3; Aanhangsel 2025-2026 nr. 589. The national contribution stated as €127.9 mln (Sept 2025), €130 million (Oct 2025) and €130.935 mln (Dec 2025); €5.1 mln made available at the end of 2025 for 2025 costs and early-2026 start-up; progress letter of 1 July 2026 with no payment figure; €185.5 million for Snellius's successor (2027-2030). Officiële bekendmakingen (repository.overheid.nl SRU search), 2 Nov 2026
Officiële bekendmakingen (repository.overheid.nl SRU), September 2026 supplementary budget for chapter XIII: Title searches for the Economic Affairs (XIII) 2026 amendment linked to the Miljoenennota (terms 'Economische Zaken', 'XIII', 'jaar 2026', 'Miljoenennota'; and records modified from 10 September 2026 with 'Miljoenennota' and 'XIII'). No record returned; the document that moved the 2026 AI-factory cash into later years was not located. Officiële bekendmakingen (repository.overheid.nl SRU), September 2026 supplementary budget for chapter XIII, 2 Nov 2026
Algemene Rekenkamer (Netherlands Court of Audit): Verantwoordingsonderzoek 2025, Ministerie van Economische Zaken en Nationaal Groeifonds (report and letter, 20 May 2026); letter on the 2027 draft budget chapter XIII (22 September 2026). Nothing on the AI factory. Algemene Rekenkamer (Netherlands Court of Audit), 2 Nov 2026
rijksfinancien.nl, Ministry of Education, Culture and Science chapter VIII: Jaarverslag OCW 2025, searched for SURF, Snellius, supercomputer, rekeninfrastructuur, rekenkracht, AI-fabriek. One mention of the EU funding application for the AI factory; no line for SURF or Snellius. rijksfinancien.nl, Ministry of Education, Culture and Science chapter VIII, 2 Nov 2026
Nationaal Groeifonds project AiNed (EZ article 1): Jaarverslag EZ 2025, Tabel 7 row 'NGF - project AiNed'. AiNed is a separate AI research and innovation programme with its own line (realisation 2025 16,911 thousand); it funds no compute infrastructure and is outside this programme record, so it is not recorded. Nationaal Groeifonds project AiNed (EZ article 1), 2 Nov 2026