Italy sovereign AI programme

Italy had one system of 13,824 accelerators in operation, with 1,328 under way.

IT4LIA AI Factory, from 2022; the record also covers Leonardo and CINECA

Italy
Accelerators13,824 operating
A full bar is 300,000 accelerators.

Systems

Two hardware records; the pale row is under way.

The programme’s systems
Under wayCINECAHopper
In operationCINECAA100Leonardo

Funding

Money on record

state an announced budget of €120 million, 2019 to 2025.

Chips and rules

Accelerators
NVIDIA’s accelerators are in both of its systems.Chip makers’ product pages
Fabrication
fabricates the Hopper parts that one of its systems names.Chip makers’ product pages
US export rules
Italy is in , outside the groups where exporting advanced AI chips needs a licence from the US Bureau of Industry and Security (BIS).Electronic Code of Federal Regulations, 29 Oct 2026
Scrutica’s rating
Scrutica rates the programme’s dependence on NVIDIA hardware and on US technology high, on a scale of none, low, medium and high.A qualitative assessment of the programme’s chips, partners and supplier relationships, as none, low, medium or high

Sites

Sites on record in the programme’s country, or owned by its own body. A site’s count is its whole machine; a system above can be an addition to it.

Sites on record
Owner
Leonardo (EuroHPC)Bologna, ItalyOperational13,824EuroHPC JU

Partners

8 partners by procurement stage and 7 more named in the programme’s sources.

Named in sources
CINECA, EuroHPC JU, MUR, ACN, INFN, Leonardo S.p.A., IQM

Sources

13 sources
Data
How the figures were made

Operating compute / delivered hardware. Reported operational or delivered: 13,824 NVIDIA A100 (Leonardo partition) (physical hardware). The stage is assigned from reported hardware status, disbursements and commitments.

CINECA operates Leonardo at Bologna’s Tecnopolo DAMA. Its Booster partition has 13,824 NVIDIA A100 GPUs and entered full production in July 2023. The LISA extension adds a separate 1,328-GPU system; at its June 2026 inauguration, user access was expected during the summer. IT4LIA’s new AI supercomputer was contracted to E4 Computer Engineering and Dell in April 2026.

Caveats on this record, 5

  • Leonardo’s Booster partition has 3,456 nodes with four A100 GPUs each. LISA’s 166 eight-GPU servers are a separate extension.
  • The ministry’s February 2022 financing statement assigns €120M to Leonardo over 2019–25, alongside €120M allocated by EuroHPC. These allocations do not itemize payments to suppliers.
  • EuroHPC’s June 2026 LISA announcement gives a €50M budget for acquisition, installation, operation and technical support. It dates the inauguration to 11 June and expects user availability during summer 2026.
  • The April 2026 IT4LIA procurement contract covers acquisition, delivery, installation and maintenance for €290M, split equally between EuroHPC and Italy’s Ministry of University and Research.
  • E4 describes an approximately €420M overall IT4LIA project, which has a wider scope than the €290M equipment contract.
Identifiers
Scrutica ID
sovereign-it
Country code
IT
Name in the record
Italy: IT4LIA AI Factory + Leonardo + CINECA