Skip to main content
ScruticaAn open reference on AI compute

Google The Dalles

Operational AI training site, ~185 MW, The Dalles, Oregon, United States

  • power known
  • power unknown
  • pale: not yet operating
Circle area shows power in megawatts. Map

Facility records, read 23 Nov 2026

Companies

  1. Google, AI hardware owner

    Publicly listed. Based in the United States.

  2. Google DeepMind, Named as tenant

    The current version of the source names a different organisation; this attribution was read from an earlier version.

Scrutica has not found a source that establishes who owns or runs the site.

The export-control lists Scrutica checks do not name Google or any parent found for it.

Power

  1. 29 Apr 2026 Facility power, Power: ~185 MW
  2. of it, for IT equipment, Power: ~154 MW
This site1 MW10 MW100 MW1 GW
This site1 MW10 MW100 MW1 GW
Arrow keys move between marks, Enter opens the selected mark, and Escape clears the selection.

Operating AI training records by power. This site is the 37th largest of the 314 whose power is known; the power of the other 66 is unknown.

Chips

  1. H100-equivalents, whole site, Count: ~180,000

The number of accelerators is unknown.

Location

3500 River Rd, The Dalles, OR. Map

The nearest destination the advanced-computing licence rules name (Macao and Country Group D:5) is Russia, 3,600 km from the recorded position: a reply within 35.01 ms over standard single-mode fibre to a timing server at the site would rule it out.

Sources

Epoch AI Frontier Data Centers. Site records dated 29 Apr 2026. Compiled 23 Nov 2026.
4 sources
SourceUsed forRecords
Epoch AI Frontier Data CentersSite identity, control roles and capacity
Ownership graphParent-company relationships
Export-control designationsFederal Register-anchored designations attached to the relevant organisation0 records
Licensed corporate databaseCorporate affiliations and sovereign investment links
Data
How the figures were made

Ownership roles. The site owner, operator and AI-hardware owner can be different companies. Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalogue’s attribution of the machines inside, whose owner may lease the facility. Each role requires its own attribution: a role is shown only where its own source establishes it. An operator named in a source supplies evidence of operation only, and no role implies exclusive control of the full site. The roles on this record come from Epoch AI Frontier Data Centers, authority tier 2.

Parent companies. Ownership checks start with each company named at the site and follow its parent companies upward for as long as a source documents the next one, so further parents may exist. A company with several roles is checked once. Its company page lists each relationship with its source. Each finding is assigned to the company it concerns.

Each finding’s route to this site. A headquarters-jurisdiction finding names the country where the company has its headquarters. A company in the ownership chain is headquartered in the United States: linked through the company named as owning the AI hardware inside this site.

Sovereign investment. Sovereign fund linkage is withdrawn while its fund-type and identity checks are rebuilt.

Location. The record's coordinates fall in The Dalles, Wasco County, Oregon (U.S. Census Bureau boundaries as of 1 January 2026, read 31 October 2026). Epoch AI Frontier Data Centers gives the address as “3500 River Rd, The Dalles, OR”, the city as “The Dalles” and the state as “Oregon” (download of 30 October 2026).

Visibility tier. The corporate-traceability tier does not verify property ownership or facility operation. Basis: Company has an SEC identifier.

Campus records. The power of a campus’s records is never added together. Across the platform, totals of every site’s power count Google The Dalles’s once; operating totals count a record’s power only where it is operating capacity. For 2 of Google The Dalles, OR’s 2 records, the part of the campus that the power covers is unknown. Curator’s note on this campus: Two records describe Google’s site at The Dalles, with coordinates approximately 964 m apart. Their company names resolve to the same corporate group. Power totals use Epoch’s estimate; the IM3 record has no power figure.

Missing values. A role that no source establishes is left off the record. A finding about a company whose place in the ownership chain is unknown is still shown, with that place marked unknown.

Publication limits. Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld. Per-fund identities and amounts are withheld.

Epoch AI. Epoch AI estimates capacity using satellite imagery, permits and corporate disclosures. Its catalogue is the source for this site record.

Estimates. Figures from Epoch AI Frontier Data Centers retain the source’s estimate flags. The tilde marks an estimate.

Power comparison. Announced, under-construction and campus build-out figures are not ranked. The comparison ranks every operating record of this class whose power is known. The scale ends at the largest operating figure in this group, 1,276 MW.

Compiled. Compiled 23 Nov 2026. Dates attached to findings refer to the source evidence.

Corrections to this record, 1
Identifiers
Scrutica ID
fac-epoch-google-the-dalles
Class
AI training
Coordinates
45.6244, −121.2070
Visibility tier
Tier 1