Skip to main content

Mistral Large Model Implied Cluster

TypeAI TrainingStatusOperationalIndexed fromEpoch AI GPU Clusters

No organisation is recorded as holding this site, running it, or owning the AI hardware inside it

0/3site roles identified0 site relationships0 findings · no company identified

Date in site records: Nov 26, 2023. Site data: Epoch AI GPU Clusters.

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · data to Nov 26, 2023 (derived)
Mistral Large Model Implied ClusterSite
Companies are grouped by their role at the site, with recorded parents above them. No company is identified in these roles, so their ownership chains could not be checked.

Export controls and government links

No site owner, operator or hardware owner is identified, so the company checks could not run.

Capacity

Reading. Power and acceleratorsscrutica.com · data to Nov 26, 2023 (derived)
6 MW

Facility power

Estimated.

not recorded

Power for IT equipment

4,000

Accelerators

4,000 H100-equivalent.

Present inventory by partition

4,000 accelerators across 1 admitted partition; theoretical dense FP16 peak 3,958 PFLOP/s.

  1. 4,000 × NVIDIA H100 SXM5 80GB (estimated)

    installed (from the facility status)

    989.5 TFLOP/s dense FP16 per accelerator · partition peak 3,958 PFLOP/s · rate citation

    Catalogue row; no partition-level source recorded

Every partition is admitted from the record’s own evidence; at least one count is flagged as an estimate. Rates are the cited dense FP16 figure per accelerator; the sum applies the methodology’s utilization and interconnect assumptions and is a theoretical aggregate, not one job’s throughput. The catalogue figures above are the record’s scalar fields (the source’s transcription, or its recorded correction) and are a different basis.

Power comparison

5.81 MW is at the 66th percentile among the 310 operating AI Training records with a reported power figure. These represent 84% of the 369 operating AI Training records tracked; announced, under-construction and campus build-out figures are not ranked. The scale ends at the largest operating figure in this group, 1,276 MW.

Data quality · 1 flag
  • The earlier CloudHQ attribution was withdrawn. A source category had been mistaken for an owner’s name.

Methods and sources

Ownership roles

Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility.

Each role requires its own attribution. An operator named in a source supplies evidence of operation only.

Parent companies

Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented.

Level 1 identifies a company at the site, level 2 its parent, and each further level another parent. Export-control designations and government investments are assigned to the company concerned.

Missing values

Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits

Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld.

Epoch AI estimates capacity using satellite imagery, permits and corporate disclosures. Its catalog is the source for this site record.

Browse the facilities directory.