Microsoft Corporation

Control of this organisation’s compute: the terms, the constraints, and what the public record does not show, with every claim carrying the disclosure it came from.

9 control relations on record for Microsoft Corporation — 2 by title, 2 by operation, 5 by contract

Every claim below carries the document it came from, who disclosed it, and the date that disclosure speaks to. Where the record holds nothing, the page states whether the public record was searched and what was searched — an unsearched layer and an empty one are different facts.

20claims on this record12 attested0 reported8 inferred0 absences with method1 not swept
The record speaks Jul 30, 2019Aug 8, 2026 · Control to Jun 23, 2026 · Constraint to Nov 10, 2025 · Disclosure to Aug 8, 2026. Dates are when each underlying disclosure speaks, not when it was read.

Control

Control here means one of three things the substrate keeps apart: holding title to a facility, operating one, or holding capacity by contract. The three are recorded separately because an organisation can hold any one without the others, and a model built on ownership alone cannot see an organisation whose compute is entirely leased.

Plate 1. Control relations on record — 9scrutica.com · Jun 23, 2026
title2Owns the facility, or holds its ground lease.
Ownsheld in own namecapacity not disclosed§
Press release by the subject · Microsoft Fairwater Wisconsin · as of Jun 23, 2026
Receipt
Microsoft Corp. on Tuesday announced that it has completed construction of its first datacenter facility in the Village of Mount Pleasant

Instrument press_release · disclosed by the subject · authority tier 2 · claim id ctrl-microsoft-self-microsoft-fairwater-wisconsin-owns-2026-1f8e65

Construction-completion announcement; ~550 FTEs on-site; second facility under construction adjacent (expected 2028). No MW figure in the document — widely-reported ~2GW-class secondary figures deliberately not used.

Primary source ↗

Cite this claim
@misc{scrutica-ctrl-microsoft-self-microsoft-fairwater-wisconsin-owns-2026-1f8e65,
  title = {Press release disclosing Microsoft Corporation owns},
  year = {2026},
  howpublished = {\url{https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/}},
  note = {Compiled in the Scrutica control ledger, claim ctrl-microsoft-self-microsoft-fairwater-wisconsin-owns-2026-1f8e65; disclosure dated 2026-06-23}
}
Press release disclosing Microsoft Corporation owns (2026). Retrieved via the Scrutica control ledger (claim ctrl-microsoft-self-microsoft-fairwater-wisconsin-owns-2026-1f8e65): https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/
Ownsheld in own namecapacity not disclosed§
Company statement by the subject · Microsoft Goodyear · as of Jul 30, 2019
Receipt
We intend to develop our new datacenter campuses in El Mirage and Goodyear, Arizona to be among the most sustainably designed

Instrument company_statement · disclosed by the subject · authority tier 2 · claim id ctrl-microsoft-self-microsoft-goodyear-owns-2019-08370f

2019 forward-looking development statement; the Goodyear campus is independently present in Epoch's frontier catalog today. The 150 MW figure in the same article is the Sun Streams 2 SOLAR plant, not facility draw — excluded. The paired El Mirage campus has no completion evidence located this sweep — no row minted for it (NULL over guess).

Primary source ↗

Cite this claim
@misc{scrutica-ctrl-microsoft-self-microsoft-goodyear-owns-2019-08370f,
  title = {Company statement disclosing Microsoft Corporation owns},
  year = {2019},
  howpublished = {\url{https://blogs.microsoft.com/on-the-issues/2019/07/30/building-world-class-sustainable-datacenters-and-investing-in-solar-power-in-arizona/}},
  note = {Compiled in the Scrutica control ledger, claim ctrl-microsoft-self-microsoft-goodyear-owns-2019-08370f; disclosure dated 2019-07-30}
}
Company statement disclosing Microsoft Corporation owns (2019). Retrieved via the Scrutica control ledger (claim ctrl-microsoft-self-microsoft-goodyear-owns-2019-08370f): https://blogs.microsoft.com/on-the-issues/2019/07/30/building-world-class-sustainable-datacenters-and-investing-in-solar-power-in-arizona/
operation2Runs the facility day to day.
Operatesheld in own namecapacity not disclosed§
Press release by the subject · Microsoft Fairwater Wisconsin · as of Jun 23, 2026
Receipt
The facility is now fully operational, marking a major milestone in the company's ongoing investment in Southeast Wisconsin.

Instrument press_release · disclosed by the subject · authority tier 2 · claim id ctrl-microsoft-self-microsoft-fairwater-wisconsin-operates-2026-55e3d3

Primary source ↗

Cite this claim
@misc{scrutica-ctrl-microsoft-self-microsoft-fairwater-wisconsin-operates-2026-55e3d3,
  title = {Press release disclosing Microsoft Corporation operates},
  year = {2026},
  howpublished = {\url{https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/}},
  note = {Compiled in the Scrutica control ledger, claim ctrl-microsoft-self-microsoft-fairwater-wisconsin-operates-2026-55e3d3; disclosure dated 2026-06-23}
}
Press release disclosing Microsoft Corporation operates (2026). Retrieved via the Scrutica control ledger (claim ctrl-microsoft-self-microsoft-fairwater-wisconsin-operates-2026-55e3d3): https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/
Operatesheld in own namecapacity not disclosed§
Press release by the subject · Microsoft Fairwater Atlanta · as of Nov 12, 2025
Receipt
The new AI datacenter in Atlanta, which began operation in October, is the second in Microsoft's Fairwater family.

Instrument press_release · disclosed by the subject · authority tier 2 · claim id ctrl-microsoft-self-microsoft-fairwater-atlanta-operates-2025-8e798d

Networked to the Wisconsin site via a dedicated AI WAN ('AI superfactory'). Title row deliberately not minted from this article's weaker ownership language.

Primary source ↗

Cite this claim
@misc{scrutica-ctrl-microsoft-self-microsoft-fairwater-atlanta-operates-2025-8e798d,
  title = {Press release disclosing Microsoft Corporation operates},
  year = {2025},
  howpublished = {\url{https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/}},
  note = {Compiled in the Scrutica control ledger, claim ctrl-microsoft-self-microsoft-fairwater-atlanta-operates-2025-8e798d; disclosure dated 2025-11-12}
}
Press release disclosing Microsoft Corporation operates (2025). Retrieved via the Scrutica control ledger (claim ctrl-microsoft-self-microsoft-fairwater-atlanta-operates-2025-8e798d): https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/
contract5Holds capacity by lease, offtake, colocation, or reservation.
Capacity reservationCoreWeavecapacity not disclosed§
SEC Form 10-K by the counterparty · as of Mar 2, 2026
Receipt
We recognized an aggregate of approximately 67% of our revenue from our top customer, Microsoft, for the year ended December 31, 2025. We recognized an aggregate of approximately 77% of our revenue from our top two customers for the year ended December 31, 2024. We recognized an aggregate of approximately 73% of our revenue for the year ended December 31, 2023, from our top three customers. None of our other customers represented 10% or more of our revenue for the year ended December 31, 2025.

Instrument sec_10k · disclosed by the counterparty · authority tier 1 · claim id ctrl-microsoft-coreweave-org-level-capacity_reservation-2026-e840cb

CoreWeave's FY2025 Form 10-K (CIK 1769628, filed 2026-03-02), customer-concentration risk factor, read directly at its canonical sec.gov address — the earlier tier-3 rating reflected a third-party mirror rather than the instrument, and sec.gov is reachable with a declared User-Agent. Org-level: the filing states no capacity or site, so this row evidences the SCALE of Microsoft's contracted position with CoreWeave and nothing narrower. CORRECTION carried by the re-derivation: the mirror asserted Microsoft was 'up from 62% in FY2024', which the filing does not state — its FY2024 figure is 77% from the top TWO customers, a different quantity, and the 62% has no counterpart in the document. Dropped rather than repeated.

Primary source ↗

Cite this claim
@misc{scrutica-ctrl-microsoft-coreweave-org-level-capacityreservation-2026-e840cb,
  title = {SEC Form 10-K disclosing Microsoft Corporation capacity reservation with CoreWeave},
  year = {2026},
  howpublished = {\url{https://www.sec.gov/Archives/edgar/data/1769628/000176962826000104/crwv-20251231.htm}},
  note = {Compiled in the Scrutica control ledger, claim ctrl-microsoft-coreweave-org-level-capacity_reservation-2026-e840cb; disclosure dated 2026-03-02}
}
SEC Form 10-K disclosing Microsoft Corporation capacity reservation with CoreWeave (2026). Retrieved via the Scrutica control ledger (claim ctrl-microsoft-coreweave-org-level-capacity_reservation-2026-e840cb): https://www.sec.gov/Archives/edgar/data/1769628/000176962826000104/crwv-20251231.htm
Capacity reservationCrusoe900 MW, basis unspecified (stated ceiling)§
Press release by the counterparty · as of Mar 27, 2026
Receipt
a new, dedicated AI factory campus in Abilene, Texas... Supporting large scale AI workloads for Microsoft

Instrument press_release · disclosed by the counterparty · authority tier 2 · value flagged as estimated in the substrate · claim id ctrl-microsoft-crusoe-org-level-capacity_reservation-2026-622bdf

site: Abilene, TX — new 900 MW AI factory campus — Crusoe's own release (fetched). A campus distinct from the Stargate I/Lancium site — combined Crusoe Abilene target ~2.1 GW. 900 MW basis unspecified (sources disagree whether gross generation or IT load; an unverified secondary claimed 2×336 MW IT — excluded). First building targeted mid-2027; onsite power plant included.

Primary source ↗

Cite this claim
@misc{scrutica-ctrl-microsoft-crusoe-org-level-capacityreservation-2026-622bdf,
  title = {Press release disclosing Microsoft Corporation capacity reservation with Crusoe},
  year = {2026},
  howpublished = {\url{https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure}},
  note = {Compiled in the Scrutica control ledger, claim ctrl-microsoft-crusoe-org-level-capacity_reservation-2026-622bdf; disclosure dated 2026-03-27}
}
Press release disclosing Microsoft Corporation capacity reservation with Crusoe (2026). Retrieved via the Scrutica control ledger (claim ctrl-microsoft-crusoe-org-level-capacity_reservation-2026-622bdf): https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure
Capacity reservationIREN Limited200 MW, critical IT load5-year term§
SEC Form 8-K by the counterparty · as of Nov 3, 2025
Receipt
IREN will deliver large scale GPU clusters accommodated within IREN's liquid cooled data centers under construction at its 750 MW campus located in Childress, Texas.

Instrument sec_8k · disclosed by the counterparty · authority tier 2 · claim id ctrl-microsoft-iren-limited-au-org-level-capacity_reservation-2025-688af4

site: IREN Childress campus (Horizon 1-4), Childress, TX — $9.7B 5-year contract, 20% prepayment, NVIDIA GB300s, phased through 2026; filed as 8-K same date (sec.gov unfetchable in this environment — cited via IREN's own release). 200 MW critical IT per the release set.

Primary source ↗

Cite this claim
@misc{scrutica-ctrl-microsoft-iren-limited-au-org-level-capacityreservation-2025-688af4,
  title = {SEC Form 8-K disclosing Microsoft Corporation capacity reservation with IREN Limited},
  year = {2025},
  howpublished = {\url{https://iren.com/resources/blog/iren-signs97-billion-agreement-with-microsoft-to-deploy-ai-cloud-infrastructure}},
  note = {Compiled in the Scrutica control ledger, claim ctrl-microsoft-iren-limited-au-org-level-capacity_reservation-2025-688af4; disclosure dated 2025-11-03}
}
SEC Form 8-K disclosing Microsoft Corporation capacity reservation with IREN Limited (2025). Retrieved via the Scrutica control ledger (claim ctrl-microsoft-iren-limited-au-org-level-capacity_reservation-2025-688af4): https://iren.com/resources/blog/iren-signs97-billion-agreement-with-microsoft-to-deploy-ai-cloud-infrastructure
Capacity reservationLambda Technologiescapacity not disclosed§
Press release by the counterparty · as of Nov 3, 2025
Receipt
Lambda to deliver mission-critical AI cloud compute at scale under a multi-year contract.

Instrument press_release · disclosed by the counterparty · authority tier 2 · claim id ctrl-microsoft-lambda-technologies-org-level-capacity_reservation-2025-2ea645

'Multibillion-dollar' multi-year agreement, 'tens of thousands' of NVIDIA GPUs (incl. GB300 NVL72) deployed in Lambda's own US data centers, Lambda operating the infrastructure. No MW, dollar figure, or site disclosed. Initial deployment 2026.

Primary source ↗

Cite this claim
@misc{scrutica-ctrl-microsoft-lambda-technologies-org-level-capacityreservation-2025-2ea645,
  title = {Press release disclosing Microsoft Corporation capacity reservation with Lambda Technologies},
  year = {2025},
  howpublished = {\url{https://lambda.ai/blog/lambda-announces-multibillion-dollar-agreement-with-microsoft-to-deploy-ai-infrastructure-powered-by-tens-of-thousands-of-nvidia-gpus}},
  note = {Compiled in the Scrutica control ledger, claim ctrl-microsoft-lambda-technologies-org-level-capacity_reservation-2025-2ea645; disclosure dated 2025-11-03}
}
Press release disclosing Microsoft Corporation capacity reservation with Lambda Technologies (2025). Retrieved via the Scrutica control ledger (claim ctrl-microsoft-lambda-technologies-org-level-capacity_reservation-2025-2ea645): https://lambda.ai/blog/lambda-announces-multibillion-dollar-agreement-with-microsoft-to-deploy-ai-infrastructure-powered-by-tens-of-thousands-of-nvidia-gpus
Capacity reservationNebiuscapacity not disclosed5-year term§
Press release by the counterparty · as of Sep 8, 2025
Receipt
Nebius will deliver dedicated capacity to Microsoft from its new data center in Vineland, New Jersey starting later this year.

Instrument press_release · disclosed by the counterparty · authority tier 2 · claim id ctrl-microsoft-nebius-org-level-capacity_reservation-2025-7d9220

site: Nebius Vineland data center, Vineland, NJ — $17.4B (up to $19.4B) 5-year agreement. Facility's planned total is 300 MW (expandable) but the Microsoft-dedicated MW split is undisclosed — capacity null rather than equating the two (E36). Furnished as a 6-K exhibit on EDGAR (tm2525580d1_ex99-1.htm); the §4.28 instrument taxonomy has no sec_6k value, so instrument records the release itself — taxonomy gap routed to the orchestrator.

Primary source ↗

Cite this claim
@misc{scrutica-ctrl-microsoft-nebius-org-level-capacityreservation-2025-7d9220,
  title = {Press release disclosing Microsoft Corporation capacity reservation with Nebius},
  year = {2025},
  howpublished = {\url{https://nebius.com/newsroom/nebius-announces-multi-billion-dollar-agreement-with-microsoft-for-ai-infrastructure}},
  note = {Compiled in the Scrutica control ledger, claim ctrl-microsoft-nebius-org-level-capacity_reservation-2025-7d9220; disclosure dated 2025-09-08}
}
Press release disclosing Microsoft Corporation capacity reservation with Nebius (2025). Retrieved via the Scrutica control ledger (claim ctrl-microsoft-nebius-org-level-capacity_reservation-2025-7d9220): https://nebius.com/newsroom/nebius-announces-multi-billion-dollar-agreement-with-microsoft-for-ai-infrastructure
Plate 1. One row per relation in the control-relations substrate; the three bands are the substrate’s own classes and all three draw whether or not they hold rows. Every capacity figure carries its measurement basis, every row carries who disclosed it and through what instrument, and the receipt under each row holds the verbatim span, the primary link, and a per-claim citation. Rows are facts about the gathered record, not a census of the subject’s arrangements.
Plate 2. Disclosed term lengthsscrutica.com · Nov 3, 2025
05 yrIREN LimitedCapacity reservation · Nov 3, 20255 yr · 200 MWNebiusCapacity reservation · Sep 8, 20255 yr
Plate 2. Each bar is one contractual position with a disclosed term, drawn to its length in years; the printed megawatts are the position’s disclosed capacity with its basis stated in the ledger above. The axis is duration, not calendar: none of the underlying disclosures states the contract’s start date, so the record supports how long, and the date printed under each counterparty is when the disclosure speaks. A position disclosed more than once — a filing and an earnings call describing the same lease — draws once, with every disclosure date printed. Bar texture is the grade of the strongest disclosure: solid attested, hatched reported, open inferred.

None of the disclosures behind those terms states a contract start date, so the figure draws duration and prints the disclosure date rather than placing bars on a calendar. 2 of 2 term-carrying positions are in that state.

Plate 3. Who put this record on the recordscrutica.com
Disclosed by54Through6111
Disclosed bythe counterparty 5the subject 4
ThroughPress release 6Company statement 1SEC Form 10-K 1SEC Form 8-K 1
Plate 3. Every claim on the control ledger entered the public record through somebody’s disclosure. The upper strip decomposes the 9 claims by who disclosed — the subject itself, a counterparty to the relation, a regulator, or a third party — and the lower strip by the instrument that carried it. Segment widths are claim counts over the same 9-claim total, and every segment’s count is listed beneath its strip.
Plate 4. The subject in the tracked universescrutica.com
Microsoft Corporation9
title operation contract
Plate 4. One bar per organization carrying control relations in the substrate — 16 today — stacked by relation class and ordered by relation count. Only the subject’s bar is named: the figure places one organization’s control profile inside the distribution of what the substrate has gathered. The distribution reflects the state of that gathering as much as the state of the industry.

Across the 16 organisations carrying control relations in this substrate, 7 hold contractual capacity without a single titled facility on record. That pattern is what the three-way split exists to make visible: an attribution model keyed on ownership records the 7 as holding nothing.

Constraint

What regime the organisation sits under, and whether any export-control designation in the Federal-Register-anchored list held here reaches it. A quiet result is reported as a check with its date rather than left as silence.

Jurisdiction

The organization record places this company’s headquarters in the United States, on the strength of the company’s own published statements cited there.

Designations

No export-control designation is linked to this organization. The cross-reference that would carry such a link resolves 50 organizations to entries on the Federal-Register-anchored lists; this organization is not among them.

The denominator is printed because a zero on its own cannot be told from a check that never ran. The lists themselves last moved on Nov 10, 2025, so a quiet result here reflects the record rather than a stalled feed.

Disclosure posture

What the organisation itself has put on the record with the registries that ask, and which registries reach it at all. Each regime asks a different question of a different population, so each finding carries what that regime counts; nothing here is divided by anything else.

Legal entity identifierOn record

The organization holds legal entity identifier INR2EJN1ERAN0W5ZP974.

Registration of the entity itself in the global LEI system.

registry record ↗

Parent-reporting declarationsDeclared

Declares a parent that does not consolidate — The organization has declared that a parent exists but does not consolidate it under the applicable accounting standard, so the consolidation regime records no parent even though one exists.

What the registrant itself declared to the LEI registry about its consolidating parent, per parent category.

Registry reason code: NON_CONSOLIDATING · as of Aug 8, 2026 · registry record ↗

Consolidation records naming this identifier as parentOn record

60 active consolidation records name this identifier as parent (26 direct, 34 ultimate). 2 of the reporting entities resolve to organizations tracked here — a boundary of this platform’s entity resolution, not of the registry’s records.

Entities holding identifiers of their own that report being consolidated into this organization’s audited accounts. Identifier adoption is uneven by jurisdiction, so this is a lower bound on structure, not a census.

as of Aug 8, 2026 · registry record ↗

SEC registrant recordNot retrieved

The organization files with the SEC (CIK 789019); its Exhibit 21 has not been retrieved into this corpus.

Exhibit 21 lists legal subsidiaries above a materiality threshold — a threshold-bounded list, not a complete structure.

registry record ↗

Capacity

Facilities this organisation is linked to in the substrate. Frontier-site capacity figures come from Epoch AI’s data-center catalog and are cited to them per record; where Epoch records who owns the AI hardware at a site, that is rendered as what it is — hardware ownership per Epoch — and not as facility ownership or operation.

Tracked facilities linked to Microsoft Corporation, by status, with megawatt sums and the count of facilities each sum is known for.
StatusFacilitiesCapacity where recorded
operational1171.7 GW across the 23 of 117 with a figure
under construction1no capacity figures recorded
announced3no capacity figures recorded
Epoch frontier catalog7Sites this subject’s group is linked to in Epoch AI’s frontier data-center catalog — their measurement lane, cited per record.
Microsoft Fairwater Atlanta636 MW (est.) per Epochoperational
Microsoft Fairwater Wisconsin369 MW (est.) per Epochoperational
Microsoft Goodyear202 MW (est.) per Epochoperational
Microsoft Project Osmium190 MW (est.) per Epochoperational
Microsoft SAT4075 MW (est.) per Epochoperational
Microsoft SAT1447 MW (est.) per Epochoperational
Crusoe Abilene Expansioncapacity not disclosedunder construction
The 121 facilities the sums above are drawn from
Every facility linked to Microsoft Corporation, with its status and recorded capacity, so each status total above can be reproduced by hand.
FacilityStatusCapacity
Microsoft Sweden Gävleannouncednot recorded
Microsoft Sweden Sandvikenannouncednot recorded
Microsoft Sweden Staffanstorpannouncednot recorded
Microsoft Fairwater Atlantaoperational636 MW (est.)
Microsoft Fairwater Wisconsinoperational369 MW (est.)
Microsoft Goodyearoperational202 MW (est.)
Microsoft Project Osmiumoperational190 MW (est.)
OpenAI/Microsoft Goodyear Arizonaoperational143 MW (est.)
Microsoft SAT40operational75 MW (est.)
Microsoft SAT14operational47 MW (est.)
Microsoft GPT-4 clusteroperational21 MW (est.)
Microsoft Azure Eagleoperational21 MW
Azure OpenAI GPT-3 Clusteroperational7 MW (est.)
Microsoft Azure ND H100 v5 VMoperational6 MW
Microsoft Azure Meta AI Rentaloperational5 MW
Microsoft Ares/Maiaoperational2 MW (est.)
Microsoft Explorer-WUS3operational2 MW
Microsoft Azure Voyager-EUS2operational2 MW
ND A100 v4operational2 MW (est.)
Microsoft Azure Pioneer-EUSoperational1 MW
Microsoft Azure Pioneer-SCUSoperational1 MW
Microsoft Azure Pioneer-WEUoperational1 MW
Microsoft Azure Pioneer-WUS2operational1 MW
Microsoft Azure Immunity Biooperational819 kW
Microsoft Azure ND v2 Largest Statedoperational533 kW
Microsoft Research Hyperclusteroperational384 kW
AZURE Australia Centraloperationalnot recorded
AZURE Australia Central 2operationalnot recorded
AZURE Australia Eastoperationalnot recorded
AZURE Australia Southeastoperationalnot recorded
AZURE Austria Eastoperationalnot recorded
AZURE Belgium Centraloperationalnot recorded
AZURE Brazil Southoperationalnot recorded
AZURE Brazil Southeastoperationalnot recorded
AZURE Canada Centraloperationalnot recorded
AZURE Canada Eastoperationalnot recorded
AZURE Central Indiaoperationalnot recorded
AZURE Central USoperationalnot recorded
AZURE Chile Centraloperationalnot recorded
AZURE Denmark Eastoperationalnot recorded
AZURE East Asiaoperationalnot recorded
AZURE East USoperationalnot recorded
AZURE East US 2operationalnot recorded
AZURE France Centraloperationalnot recorded
AZURE France Southoperationalnot recorded
AZURE Germany Northoperationalnot recorded
AZURE Germany West Centraloperationalnot recorded
AZURE Indonesia Centraloperationalnot recorded
AZURE Israel Centraloperationalnot recorded
AZURE Italy Northoperationalnot recorded
AZURE Japan Eastoperationalnot recorded
AZURE Japan Westoperationalnot recorded
AZURE Korea Centraloperationalnot recorded
AZURE Korea Southoperationalnot recorded
AZURE Malaysia Westoperationalnot recorded
AZURE Mexico Centraloperationalnot recorded
AZURE New Zealand Northoperationalnot recorded
AZURE North Central USoperationalnot recorded
AZURE North Europeoperationalnot recorded
AZURE Norway Eastoperationalnot recorded
AZURE Norway Westoperationalnot recorded
AZURE Poland Centraloperationalnot recorded
AZURE Qatar Centraloperationalnot recorded
AZURE South Africa Northoperationalnot recorded
AZURE South Africa Westoperationalnot recorded
AZURE South Central USoperationalnot recorded
AZURE Southeast Asiaoperationalnot recorded
AZURE South Indiaoperationalnot recorded
AZURE Spain Centraloperationalnot recorded
AZURE Sweden Centraloperationalnot recorded
AZURE Switzerland Northoperationalnot recorded
AZURE Switzerland Westoperationalnot recorded
AZURE UAE Centraloperationalnot recorded
AZURE UAE Northoperationalnot recorded
AZURE UK Southoperationalnot recorded
AZURE UK Westoperationalnot recorded
AZURE West Central USoperationalnot recorded
AZURE West Europeoperationalnot recorded
AZURE West Indiaoperationalnot recorded
AZURE West USoperationalnot recorded
AZURE West US 2operationalnot recorded
AZURE West US 3operationalnot recorded
Microsoft Air Gapped Supercomputeroperationalnot recorded
CYS41 Datacenteroperationalnot recorded
CYS42 Datacenteroperationalnot recorded
Microsoft - Azure Datacenteroperationalnot recorded
Microsoft Data Center 1operationalnot recorded
Microsoft EAT02operationalnot recorded
Microsoft IAD11operationalnot recorded
Microsoftoperationalnot recorded
Microsoft San Antoniooperationalnot recorded
Microsoft TRP2operationalnot recorded
Microsoft Columbia Data Centeroperationalnot recorded
AMS05operationalnot recorded
Microsoft DUB03 / DUB04operationalnot recorded
Microsoft DSFoperationalnot recorded
Microsoft Irelandoperationalnot recorded
Microsoft Data Centeroperationalnot recorded
Microsoft Data Centreoperationalnot recorded
PHX-11operationalnot recorded
Microsoft MAD01operationalnot recorded
Microsoft Newport data centreoperationalnot recorded
CPH01operationalnot recorded
Microsoft MAD02operationalnot recorded
Microsoft MEL11operationalnot recorded
COLO 2operationalnot recorded
Microsoft SYD05 Data Centreoperationalnot recorded
Microsoft MEL04operationalnot recorded
Microsoft MEL07operationalnot recorded
Microsoft Chileoperationalnot recorded
AMS06operationalnot recorded
AMS07operationalnot recorded
Microsoft Boydton Data Centeroperationalnot recorded
AMS08operationalnot recorded
AMS09operationalnot recorded
PHX-10operationalnot recorded
Microsoft Datacenter West Europeoperationalnot recorded
Microsoft Datacenteroperationalnot recorded
AMS11operationalnot recorded
AMS12operationalnot recorded
Crusoe Abilene Expansionunder constructionnot recorded

7 of the 121 linked facilities are in Epoch’s frontier catalog, carrying 1.5 GW between them. Sums cover only the facilities with a recorded figure; the count of those is printed beside each row of the table above, because a megawatt total whose denominator is invisible reads as a census when it is a partial sum.

Supply

This layer publishes what is known about the completeness of the supply picture, not the picture itself. Some supply records here were established with reference to subscription corporate-data sources that cannot be republished, so what renders is the epistemic state — position in a distribution, a corroboration class, whether a contradiction was found — and never a relationship, a counterparty, or a count from those sources.

Some records behind this layer were established with reference to subscription corporate-data sources that cannot be republished. What renders here is the epistemic state — position in a distribution, a corroboration class, whether a contradiction was found — and never a relationship, a counterparty or a count from those sources.

Position in the tracked graph

This organization’s supply-relationship count sits above the 99th percentile of the 5,088 organizations in the tracked supply graph. The underlying counts and distribution ride subscription-licensed rows and are not published; the percentile band is the disclosure (see the sourcing note below).

Corroboration of the control ledger

Partially corroborated the tracked supply corpus independently connects some, but not most, of the 5 subject–counterparty pairs on the control ledger. The class is coarse by design: which pairs, and how the licensed rows describe them, is not published.

Contradiction check

No contradiction between the subscription-licensed corpus and the public-record claims rendered on this page was found in the review of Aug 12, 2026. Where such a contradiction is found, the public claim renders here with a flag that conflicting subscription evidence exists — the flag is the maximum disclosure.

Working detail — grades, sources, and what is withheld

1 · How claims are graded

No confidence value is stored anywhere. Each grade is derived when the page renders from three recorded facts — the authority tier of the source, who disclosed it, and whether the value is flagged as an estimate — so a grade cannot disagree with the claim it sits beside.

Attested Stated in a primary or research-grade record by the subject, a counterparty to the relation, or a regulator.

Reported Carried by press or third-party reporting rather than a party’s own record.

Inferred Derived or estimated — including ceilings a party states as “up to” figures.

An estimate outranks its source: a ceiling stated in a counterparty’s own press release (“up to 5 GW”) grades inferred, because the number is a bound and not a measurement.

2 · Where each layer reads

Control. control_relations only — never a facility’s owner or operator column. Those columns carry, for catalog rows, a copy of the hardware-owner field whose own published definition disclaims facility ownership and operation, so they were retired as attribution sources.

Constraint. Export-control designations anchored to Federal Register citations, the platform’s designation-to-organisation cross-reference, and rule-derived country access classifications.

Disclosure posture. The Global LEI Foundation golden copy — registration, parent-reporting declarations, and consolidation records — read by the organisation’s own identifier, plus its SEC registrant record where one exists.

Capacity. The facilities substrate, with Epoch AI cited per record for catalog rows.

3 · How absence is recorded

Three states, kept apart everywhere on this page. Rows: the record holds claims. Searched, nothing admissible: a search was run, its method and date are printed, and what it found could not be reduced to a citable primary. Not swept: no search is on file.

Collapsing the last two would let a budget limit read as a finding about the world. A lead that cannot be traced to a document is recorded as a lead, never as a row.

4 · What is not published, and why

Some records here were established with reference to subscription corporate-data sources that cannot be republished. Where that applies, the published record cites the public primary that establishes it; the subscription source informed only which records to seek and how complete we believe the result to be. No subscription-sourced record, identifier or value is served by this site.

That is why the supply layer publishes a percentile band rather than a count, and a corroboration class rather than a list. Those forms cannot be inverted back into the underlying rows, which is the property that makes them publishable at all.

Everywhere else on this page, a derived figure prints the operands it was computed from.

The four records in this instrument were chosen to span the cases the substrate has to handle: compute held only by contract, compute held by title, compute held by operation, and an organisation the public record barely reaches. Other organisations have directory entries; a record like this one exists where the control layer has been swept.