Skip to main content
ScruticaOpen data and analysis for AI compute governance

Sovereign AI Programmes

Finland sovereign AI programme

LUMI had one system of 11,912 accelerators in operation.

LUMI, 2022–2027; the record also covers LUMI-AI (EuroHPC AI Factory)

Finland
Accelerators11,912 operating
A full bar is 300,000 accelerators.

Systems

One hardware record.

The programme’s systems
In operationCSCMI250XLUMI

Funding

Paid out

Sep 2026: 21 of 48 months

paid out6 points above an even pace

€125 million of €250 million

€125 million paid out by September 2026, 21 months after the 2025 budget year began, of Finland’s €250 million national share for LUMI-AI over 2025–2028.

Sovereign AI Funding

Chips and rules

Accelerators
AMD’s accelerators are in its one system.Chip makers’ product pages
US export rules
Finland is in , outside the groups where exporting advanced AI chips needs a licence from the US Bureau of Industry and Security (BIS).Electronic Code of Federal Regulations, 29 Oct 2026
Scrutica’s rating
Scrutica rates the programme’s dependence on NVIDIA hardware low, and on US technology medium, on a scale of none, low, medium and high.A qualitative assessment of the programme’s chips, partners and supplier relationships, as none, low, medium or high

Sites

Sites on record in the programme’s country, or owned by its own body. A site’s count is its whole machine; a system above can be an addition to it.

Sites on record
Owner
LUMI (EuroHPC)Kajaani, FinlandOperational11,912EuroHPC JU

Partners

7 partners by procurement stage and 4 more named in the programme’s sources.

Named in sources
CSC, EuroHPC JU, SRV, Finnish Government

Sources

14 sources
Data
How the figures were made

Operating compute / delivered hardware. Reported operational or delivered: 11,912 AMD Instinct MI250X (physical hardware). The stage is assigned from reported hardware status, disbursements and commitments.

LUMI’s GPU partition has 2,978 nodes with four AMD MI250X modules each, or 11,912 modules. Its measured Linpack performance is 379.7 PFlop/s. The LUMI AI Factory began services on this existing system while its successor was procured. EuroHPC signed the LUMI-AI supply contract with Bull in August 2026; deployment is scheduled for the second half of 2027. CSC hosts the systems in Kajaani for a multinational consortium.

Caveats on this record, 4

  • The GPU count follows LUMI’s operator documentation and the architecture specification updated in autumn 2023. Each MI250X module contains two compute dies, which Slurm exposes separately; the count here is physical modules.
  • LUMI’s original procurement had a €144.5M budget in 2020, shared equally by EuroHPC and the ten-country LUMI consortium.
  • Finland pledged up to €250M for LUMI-AI in December 2024.
  • The installed GPU count covers the existing LUMI-G partition. LUMI-AI has a signed procurement contract and a 2027 deployment target.
Identifiers
Scrutica ID
sovereign-fi
Country code
FI
Name in the record
Finland: LUMI + LUMI-AI (EuroHPC AI Factory)