Singapore

Supplier relationships, by countryCustomer relationships, by country

53 of 60 facility records have a location. Circles show power, dark for operating and pale for other recorded figures.

Power on record

Operating plant counts operational records only.
2 operating records, none estimated
Summed across disclosed counts.
38.6% worldwide, licence-withheld records excluded

1 MW of operating plant sits inside build-out or later-phase figures and appears only in the operating band.

Facilities

Operating records first, by power, then other records with a power figure; records with none follow, by name. 10 of 60 records have capacity data or a site description, 16.7% here against 17.2% globally and 12.3% in the median country. A figure marked Held is not in operating totals.
Facility records in this country
Sustainable Metal Cloud Singapore Phase 1Part of Sustainable Metal Cloud Singapore Phase 2Smc Sustainable Metal Cloud, AI hardware owner11,024
NSCC ASPIRE 2A Phase 2National Supercomputing Center Singapore, AI hardware owner0.3352
Equinix SG3Equinix, Inc., Site operatorWithheld under a correction
Singtel DC TuasSingtel, AI hardware owner58Held: announced
DayOne SG1 SingaporeDayOne Data Centers Limited, Developer (announced)20Held: under construction
Sustainable Metal Cloud Singapore Phase 2Smc Sustainable Metal Cloud, AI hardware owner7Held: announced5,000Held
NSCC ASPIRE 2A Phase 1National Supercomputing Center Singapore, AI hardware ownerWithheld under a correction256Held: earlier phase of an operating cluster
1-Net
1ASIA-Singapore
AIMS
AirTrunk SGP1 Singapore
AirTrunk SGP2 (Loyang)

Ownership

How far the companies linked to facilities here can be traced, weighted by operating power.

0% of operating power is traced to a company with an SEC identifier or a linked parent.

SEC identifier or a linked parent17 facilities
Parent in licensed ownership data0.0%
Parent in other sources1 facility
Company identified, parent unrecorded100.0%2 MW, 2 of 17 facilities
No company linked25 facilities
Facilities by ownership tier

Open a facility for its ownership relationships and sources.

Tier
Facility
Company
Capacity
Chain
Detail
  1. Tier 4Sustainable Metal Cloud Singapore Phase 1Smc Sustainable Metal CloudCompany identified; parent unrecorded1 MWview →
  2. Tier 4NSCC ASPIRE 2A Phase 2National Supercomputing Center SingaporeCompany identified; parent unrecorded<1 MWview →
  3. Tier 1AWS Asia Pacific (Singapore)Amazon.com, Inc.Company has an SEC identifier—view →
  4. Tier 1AZURE Southeast AsiaMicrosoft CorporationCompany has an SEC identifier—view →
  5. Tier 1GCP Asia Southeast 1GoogleCompany has an SEC identifier—view →
  6. Tier 1OCI SingaporeOracle CorporationCompany has an SEC identifier—view →
  7. Tier 1OCI Singapore WestOracle CorporationCompany has an SEC identifier—view →
  8. Tier 1Alibaba Cloud in SingaporeAlibabaCompany has an SEC identifier—view →
  9. Tier 1Equinix SG3Equinix, Inc.Company has an SEC identifier—view →
  10. Data GapBig Data Exchange Singapore Data Center SIN1—No operator, site owner or hardware owner linked—view →
  11. Data GapSingtel Bedok Data Center—No operator, site owner or hardware owner linked—view →
  12. Data GapInap Data Center—No operator, site owner or hardware owner linked—view →
  13. Data GapKeppel DC Singapore 1—No operator, site owner or hardware owner linked—view →
  14. Data GapStarhub Data Center @ Kaki Bukit—No operator, site owner or hardware owner linked—view →
  15. Data GapAscenix—No operator, site owner or hardware owner linked—view →
  16. Data GapAmazon SIN4—No operator, site owner or hardware owner linked—view →
  17. Data GapAmazon SIN2—No operator, site owner or hardware owner linked—view →
  18. Data GapGoogle Singapore DC—No operator, site owner or hardware owner linked—view →
  19. Data GapSTT Jurong—No operator, site owner or hardware owner linked—view →
  20. Data GapChina Mobile International Singapore Data Center—No operator, site owner or hardware owner linked—view →
  21. Data GapSTT Tai Seng 2—No operator, site owner or hardware owner linked—view →
  22. Data GapStarhub Data Center @ One North—No operator, site owner or hardware owner linked—view →
  23. Data GapStarhub Data Center @ Loyang—No operator, site owner or hardware owner linked—view →
  24. Data GapAirtrunk SGP1 Singapore—No operator, site owner or hardware owner linked—view →
  25. Data GapSTT Defu 1—No operator, site owner or hardware owner linked—view →
  26. Data GapM1 Next-Gen Data Center—No operator, site owner or hardware owner linked—view →
  27. Data GapAmazon SIN3—No operator, site owner or hardware owner linked—view →
  28. Data GapAIMS—No operator, site owner or hardware owner linked—view →
  29. Data Gap1-Net—No operator, site owner or hardware owner linked—view →
  30. Tier 4Telin-1 Data CentreTelin SingaporeCompany identified; parent unrecorded—view →
  31. Tier 4Telin-2 Data CentreTelin SingaporeCompany identified; parent unrecorded—view →
  32. Data GapSingtel Kim Chuan Telecommunications Centre—No operator, site owner or hardware owner linked—view →
  33. Data GapKeppel DC Singapore 3—No operator, site owner or hardware owner linked—view →
  34. Data GapDC West—No operator, site owner or hardware owner linked—view →
  35. Tier 1Google: Lok Yang 1GoogleCompany has an SEC identifier—view →
  36. Data GapSTT MediaHub—No operator, site owner or hardware owner linked—view →
  37. Tier 4OVHcloud SGP-1OVHcloudCompany identified; parent unrecorded—view →
  38. Tier 1Equinix SG5 - SingaporeEquinix, Inc.Company has an SEC identifier—view →
  39. Data Gap1ASIA-Singapore—No operator, site owner or hardware owner linked—view →
  40. Tier 1Equinix SG3 - SingaporeEquinix, Inc.Company has an SEC identifier—view →
  41. Tier 1Digital Realty Singapore SIN10Digital RealtyCompany has an SEC identifier—view →
  42. Tier 1Equinix SG1 - SingaporeEquinix, Inc.Company has an SEC identifier—view →
  43. Tier 1Digital Realty Singapore SIN11Digital RealtyCompany has an SEC identifier—view →
  44. Tier 4Global Switch SingaporeGlobal Switch Holdings Ltd.Company identified; parent unrecorded—view →
  45. Tier 4Racks CentralNewMedia Express Pte LtdCompany identified; parent unrecorded—view →
  46. Tier 3Telehouse - SingaporeTelehouse - Global Data CentersParent linked through other sources—view →
  47. Tier 4NeutraDC SNG-3NEUTRADC SingaporeCompany identified; parent unrecorded—view →
  48. Tier 4Epsilon Global Hubs SingaporeEpsilonCompany identified; parent unrecorded—view →
  49. Tier 4Iron Mountain Data Center - Singapore (SIN-1)Iron Mountain Data CentersCompany identified; parent unrecorded—view →
  50. Tier 4NTT Serangoon Data Center (SG1)NTT DATA's Global Data Centers divisionCompany identified; parent unrecorded—view →
  51. Tier 1Equinix SG2 - SingaporeEquinix, Inc.Company has an SEC identifier—view →
  52. Tier 1Equinix SG4 - SingaporeEquinix, Inc.Company has an SEC identifier—view →
  53. Tier 4BDx SIN1 - SingaporeBDx DC Services LimitedCompany identified; parent unrecorded—view →
  54. Tier 1Digital Realty Singapore SIN12Digital RealtyCompany has an SEC identifier—view →
  55. Tier 4Singtel DC TuasSingtelCompany identified; parent unrecorded58 MWAnnouncedview →
  56. Tier 4DayOne SG1 SingaporeDayOne Data Centers LimitedCompany identified; parent unrecorded20 MWUnder constructionview →
  57. Tier 4Sustainable Metal Cloud Singapore Phase 2Smc Sustainable Metal CloudCompany identified; parent unrecorded7 MWAnnouncedview →
  58. Tier 4AirTrunk SGP2 (Loyang)AirtrunkCompany identified; parent unrecorded—view →
  59. Tier 4NSCC ASPIRE 2A Phase 1National Supercomputing Center SingaporeCompany identified; parent unrecorded—view →
  60. Tier 1Equinix SG6 (Singapore)Equinix, Inc.Company has an SEC identifier—view →
Ownership tiers over time

Operating-capacity-weighted shares at each recorded snapshot. Dates are when the distribution was captured; the ownership evidence can be older.

42 snapshots weighted by operating capacity, from 2026-09-23 to 2026-11-03. 144 earlier snapshots weighted every recorded power figure and are listed under Snapshot values.

  • Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
  • Tier 2 — parent linked through licensed ownership data
  • Tier 3 — parent linked through other sources
  • Tier 4 — company identified; parent unrecorded
  • Data Gap — no company linked
Snapshot values

Displayed MW are rounded to two decimal places. Operating capacity counts operational records only; a snapshot taken before operating weighting began lists only the figure it recorded, every status summed. Download values (JSON) for the full inputs used to calculate the shares. Consecutive snapshots showing the same figures are listed once, under their first and last dates; the download keeps every date.

2026-04-25 – 2026-05-05 · 10 snapshots

92.49 MW recorded, every status · 57 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
25.5 MW · 18 facilities · 27.6%
Tier 2 — parent linked through licensed ownership data
58 MW · 1 facility · 62.7%
Tier 3 — parent linked through other sources
0 MW · 1 facility · 0.0%
Tier 4 — company identified; parent unrecorded
8.99 MW · 13 facilities · 9.7%
Data Gap — no company linked
0 MW · 24 facilities · 0.0%

2026-05-06 – 2026-05-10 · 5 snapshots

92.49 MW recorded, every status · 57 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
25.5 MW · 18 facilities · 27.6%
Tier 2 — parent linked through licensed ownership data
58 MW · 1 facility · 62.7%
Tier 3 — parent linked through other sources
0 MW · 1 facility · 0.0%
Tier 4 — company identified; parent unrecorded
8.99 MW · 12 facilities · 9.7%
Data Gap — no company linked
0 MW · 25 facilities · 0.0%

2026-05-11 – 2026-05-16 · 6 snapshots

92.49 MW recorded, every status · 57 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
25.5 MW · 18 facilities · 27.6%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 1 facility · 0.0%
Tier 4 — company identified; parent unrecorded
66.99 MW · 13 facilities · 72.4%
Data Gap — no company linked
0 MW · 25 facilities · 0.0%

2026-05-17

92.49 MW recorded, every status · 58 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
25.5 MW · 18 facilities · 27.6%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 1 facility · 0.0%
Tier 4 — company identified; parent unrecorded
66.99 MW · 14 facilities · 72.4%
Data Gap — no company linked
0 MW · 25 facilities · 0.0%

2026-05-18 – 2026-06-02 · 16 snapshots

112.49 MW recorded, every status · 61 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
25.5 MW · 19 facilities · 22.7%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 1 facility · 0.0%
Tier 4 — company identified; parent unrecorded
86.99 MW · 16 facilities · 77.3%
Data Gap — no company linked
0 MW · 25 facilities · 0.0%

2026-06-03 – 2026-07-14 · 36 snapshots

106.99 MW recorded, every status · 60 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
20 MW · 18 facilities · 18.7%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 1 facility · 0.0%
Tier 4 — company identified; parent unrecorded
86.99 MW · 16 facilities · 81.3%
Data Gap — no company linked
0 MW · 25 facilities · 0.0%

2026-07-15 – 2026-08-15 · 32 snapshots

105.31 MW recorded, every status · 60 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
20 MW · 18 facilities · 19.0%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 1 facility · 0.0%
Tier 4 — company identified; parent unrecorded
85.31 MW · 16 facilities · 81.0%
Data Gap — no company linked
0 MW · 25 facilities · 0.0%

2026-08-16 – 2026-09-22 · 38 snapshots

105.31 MW recorded, every status · 60 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
20 MW · 17 facilities · 19.0%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 1 facility · 0.0%
Tier 4 — company identified; parent unrecorded
85.31 MW · 17 facilities · 81.0%
Data Gap — no company linked
0 MW · 25 facilities · 0.0%

2026-09-23 – 2026-10-30 · 38 snapshots

21.76 MW operating · 60 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
20 MW · 17 facilities · 91.9%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 1 facility · 0.0%
Tier 4 — company identified; parent unrecorded
1.76 MW · 17 facilities · 8.1%
Data Gap — no company linked
0 MW · 25 facilities · 0.0%

2026-10-31 – 2026-11-03 · 4 snapshots

1.76 MW operating · 60 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
0 MW · 17 facilities · 0.0%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 1 facility · 0.0%
Tier 4 — company identified; parent unrecorded
1.76 MW · 17 facilities · 100.0%
Data Gap — no company linked
0 MW · 25 facilities · 0.0%

Sovereign programme

Operational (ASPIRE 2A, 2A+ and 2B). Operating compute / delivered hardware.

National AI Strategy 2.0 / AISG / NSCC Sovereign Compute

~$744.0MGovernment fundingComputer Weekly, 19 Feb 2024

NSCC launched ASPIRE 2A and 2A+ in October 2024, with 352 A100 and 320 H100 GPUs respectively. ASPIRE 2B launched in June 2026 with 1,536 H200 GPUs; NSCC included it in July resource allocations. The S$270 million grant supports computing infrastructure, research access and skills. Singapore's January 2026 National AI R&D Plan commits more than S$1 billion for 2025–2030. The Enterprise Compute Initiative provides cloud and consultancy support. IMDA's 2024 roadmap targets at least 300 MW of additional data-centre capacity.

Partners: NRF, NSCC Singapore, NVIDIA, MDDI, AISG.

Programme record and sources

Export controls

A curated summary of country-level restrictions and selected chip statuses, from country-group membership and licensing policy, reviewed 17 Jul 2026.

34 Entity List designations against organisations located here.

Singtel’s RE:AI offers a domestic AI-cloud initiative.

Recorded as availableH100H200B200

NVIDIA reported the launch of Singtel’s RE:AI in May 2025, with AI-cloud services intended for enterprises, government and researchers.

Chip industry. GlobalFoundries opened its Singapore fab expansion in September 2023.

Sources: NVIDIA report on RE:AI, May 2025; GlobalFoundries Singapore fab expansion, September 2023.

Suppliers and customers

5 relationships involve companies here, 4 as supplier and 1 as customer.

The United States is the largest customer country, with 3 relationships, and the largest supplier country, with 1.

Supplier countries
Based in
Customer countries

Organisations

10 organisations listed here, alphabetically. None has a recorded market value.
All 10 organisations
Organisations headquartered here
Broadcom Pte. Ltd.
Canaan ADR A
Convergent Systems (S) Pte Ltd.
DayOne Data Centers Limited
Frasers Commercial Trust
Keppel
Manulife US REIT-S
Orangekloud Technology A
Powermatic Data Systems
Venture Corporation

Sources

Sources are matched by ISO country code; operating capacity and ownership shares count operational records only, from the same facility rollup.
4 sources
Data
How the figures were made

Geography. Outlines use Natural Earth de facto boundaries. Distant parts may be omitted; located records outside the drawing are counted in its caption. Power circles use the same scale across countries.

Counts. Counts retrieved 3 Nov 2026. Operating capacity and ownership shares include estimated capacity; a campus figure recorded as its full build-out, earlier phases and second records are shown apart rather than counted. Sovereign programme ratios use government-only announced amounts where available; each ratio lists its numerator and denominator.

Corporate traceability. No company linked means no operator, site owner or hardware owner has been linked to the facility. The tiers do not verify property ownership or facility operation. Announced and under-construction figures are not counted here. Tiers classify the available sources for a company linked to each facility. A linked company’s SEC identifier can qualify it for the first tier without establishing a parent. Ownership relationships and their sources are listed on the facility and company pages.

Export-control posture. Recipient and end-use conditions can change the outcome of a transaction. Classification review: 17 Jul 2026. Access basis: 1.00. This value encodes destination-level access for the listed accelerators. The recipient or end use can still trigger a license requirement.

Bilateral supply-chain partners. Counts include every tracked relationship; no dollar amounts are published for them.

Organisations headquartered here. Across all industries; multiple identifiers may refer to the same company. The record lists 10 distinct organisations with qualifying market-capitalisation or linked-record evidence, after reviewing all public organisation rows for Singapore; the source holds 779 organisation rows, including duplicate identities and rows without qualifying evidence, and the company register applies its own evidence scope. A type is shown only where the classification has been reviewed.

Corrections to this page, 2
Identifiers
ISO country code
SG