Scrutica
Supply Chain
Not yet available
Power capacity, hardware inventory, upstream suppliers, and downstream customers for the row owned by ; any BIS Entity List exposure is walked through the canonical org graph rather than asserted at the facility row.
Capacity, ownership chain, and supply-chain position for TikTok / ByteDance Thailand BOI Data Hosting Infrastructure, including any export-control exposure that surfaces when the BIS Entity List touches a node above the facility in the chain.
As of 2026-05-22
Description
Thai Board of Investment (BOI)-approved investment by TikTok Pte. Ltd. (ByteDance's Singapore-domiciled subsidiary) for THB 126B (~US$3.76B) in data-hosting infrastructure across Bangkok, Samut Prakan, and Chachoengsao provinces. BOI approval date 2025-01-29 per Nation Thailand reporting. Subsequent broader ByteDance commitment of $8.8B over 5 years per Reuters / Bloomberg 2025-02-28 (Investing.com mirror) — relationship between the $3.76B BOI-approved tranche and the $8.8B 5-year figure NOT explicitly disclosed in fetched sources (may be subsuming or extending). BOI text references "server and related infrastructure in high-performance data centres" — tenant-vs-self-built structure UNCLEAR; owner_org_id + operator_org_id intentionally NULL pending verification. Operations targeted 2026 per BOI approval.
Timeline
Announced
Jan 29, 2025
Expected Operational
Dec 31, 2026
Notes
authority_tier=1: Thai BOI primary approval 2025-01-29 anchored to Nation Thailand (fetched) + Reuters $8.8B 5-year commitment 2025-02-28 (Investing.com mirror). Multi-province scope (Bangkok + Samut Prakan + Chachoengsao) — no single facility address; city field set to Bangkok as anchor with state field documenting the 3-province scope. owner_org_id + operator_org_id intentionally NULL — BOI text references hosted "data hosting services" structure suggesting tenant model but ownership structure NOT confirmed in fetched primary sources. Lat/lng NULL — multi-province scope. power_capacity_mw NULL — not disclosed. Status=announced (BOI approval is regulatory approval, not construction start). expected_operational_date set to 2026-12-31 placeholder per "operations targeted 2026" framing. Re-investigate on operational disclosure: tenant operator identification + facility-precision addresses + MW per site.
CS LoxInfo Data Center - CW Tower
Bangkok, TH