Poland PL
Compute facilities, corporate ownership and chip access in Poland.
9 of 47 facility records have capacity figures or a description
Facility detail
19.1% with capacity data or a site description
- 9 with capacity or a description
- 38 with neither
- 16.8% globally
- 12.3% median country (39 with 20+ records)
Power on record, by what it measures
100% is operating plant
- 2 MW operating
- 0 MW under construction
- 0 MW announced
- 31.6% operating worldwide, licence-withheld records excluded
Facility detail requires a positive power, GPU or FLOP figure, or a site description. Operating plant counts operational records only.
Solid reference lines show the global shares. The dashed line is the median across 39 countries with at least 20 facility records. Data retrieved October 16, 2026.
Infrastructure summary
- Facility records
- 479 have capacity data or a site description
- Operating capacity
- 2 MWAcross 4 operating records, none estimated
- Operating AI accelerators
- 1,964Summed across disclosed counts. Not counted: 450 accelerators under construction or expanding (1 record)
- Entity List designations
- 1Against organisations located here — see the designations
- Sovereign programmes
- No funding amount recorded1 programme; no disbursement figure published
Facilities
47 of 47 facility records: operating records first, by power, then records under construction, announced or retired. A figure the operating total does not count says why: its status, or a note beside the figure where the site operates. A dash marks an unrecorded figure.
| Facility | Type | Status | Power | Accelerators | Organisation and role |
|---|---|---|---|---|---|
| AGH Cyfronet Helios | AI Training | Operational | 0.5 MW | 464 | AGH University of Krakow · AI hardware owner |
| PCSS Poznan Proxima | AI Training | Operational | 0.5 MW | 348 | Polish Academy of Sciences · AI hardware owner |
| Wroclaw Centre for Networking and Supercomputing Lem | AI Training | Operational | 0.4 MW | 304 | Wrocław University of Science and Technology · AI hardware owner |
| AGH Cyfronet Athena | AI Training | Operational | 0.3 MW | 384 | AGH University of Krakow · AI hardware owner |
| AZURE Poland Central | Hyperscale DC | Operational | — | — | Microsoft Corporation · Cloud region provider |
| GCP Europe Central 2 | Hyperscale DC | Operational | — | — | Google · Cloud region provider |
| Helios (Cyfronet AGH) | HPC Center | Operational | — | 464 | — |
| Korbank | Other | Operational | — | — | — |
| Centrum Technologii ICM UW | Other | Operational | — | — | — |
| Polcom Data Center Skawina | Colocation | Operational | — | — | Polcom · Site operator |
| itQ Data Center | Class not stated | Operational | — | — | — |
| DC 11.11 | Colocation | Operational | — | — | Nask S A · Site operator |
| Warsaw Data Hub | Colocation | Operational | — | — | Orange Polska S A · Site operator |
| Miejska Sieć Komputerowa CzestMAN | Class not stated | Operational | — | — | — |
| PLAY Centrum Danych DC1 | Class not stated | Operational | — | — | 3s Data Center S A · Site operator |
| DISKUS Polska | Class not stated | Operational | — | — | — |
| Modułowe Data Center | Class not stated | Operational | — | — | Exatel S A · Site operator |
| Vantage Warsaw WAW1 | Class not stated | Operational | — | — | Vantage Data Centers · Site operator (last stated Jan 2025) |
| ATMAN | Class not stated | Operational | — | — | Atman · Site operator |
| Centrum Przetwarzania Danych T‑Mobile Polska | Class not stated | Operational | — | — | T Mobile Polska · Site operator |
| T‑Mobile Polska centrum danych | Class not stated | Operational | — | — | — |
| OVHcloud Ożarów (WAW-1) | Class not stated | Operational | — | — | Ovh Sp Z O O · Site operator |
| Polcom Data Center Alwernia | Class not stated | Operational | — | — | Polcom · Site operator |
| Polkomtel | Class not stated | Operational | — | — | Polkomtel · Site operator |
| T-Mobile Warszawa-Szlachecka | Class not stated | Operational | — | — | — |
| OVHcloud WAW-1 | Hyperscale DC | Operational | — | — | OVHcloud · Site operator |
| Beyond.pl - DC2 / | Colocation | Operational | — | — | Beyond.pl sp. z o.o. · PeeringDB listing holder |
| Beyond.pl - DC1 / | Colocation | Operational | — | — | Beyond.pl sp. z o.o. · PeeringDB listing holder |
| Netia Data Center MIND | Colocation | Operational | — | — | Netia S.A. · PeeringDB listing holder |
| 3S Data Center Katowice | Colocation | Operational | — | — | 3S S.A. · PeeringDB listing holder |
| 1-DC EU | Colocation | Operational | — | — | A-Systems Sp. z o.o. · PeeringDB listing holder |
| Orange Polska / | Colocation | Operational | — | — | Orange Polska Spolka Akcyjna · PeeringDB listing holder |
| Orange Polska / | Colocation | Operational | — | — | Orange Polska Spolka Akcyjna · PeeringDB listing holder |
| 4 Data Center | Colocation | Operational | — | — | Quicktel Sp. z o.o. · PeeringDB listing holder |
| ATMAN Data Center Warsaw-2 (WAW-2, Konstruktorska 5) | Colocation | Operational | — | — | Atman sp. z o.o. · PeeringDB listing holder |
| ATMAN Data Center Warsaw-1 (WAW-1, Grochowska 21A) | Colocation | Operational | — | — | Atman sp. z o.o. · PeeringDB listing holder |
| Equinix WA2 - Warsaw | Colocation | Operational | — | — | Equinix Inc · PeeringDB listing holder |
| Quicktel Sp. z o.o. | Colocation | Operational | — | — | MCG Jakub Skorek · PeeringDB listing holder |
| LIM Warsaw | Colocation | Operational | — | — | LIM CENTER Spółka z ograniczoną odpowiedzialnością · PeeringDB listing holder |
| Equinix WA1 - Warsaw, Centrum LIM | Colocation | Operational | — | — | Equinix Inc · PeeringDB listing holder |
| EdgeConneX Warsaw (EDCWAW01) | Colocation | Operational | — | — | EdgeConneX Inc. · PeeringDB listing holder |
| Netia Warsaw (WARSC001) | Colocation | Operational | — | — | Netia S.A. · PeeringDB listing holder |
| Equinix WA3 - Warsaw | Colocation | Operational | — | — | Equinix Inc · PeeringDB listing holder |
| MEVSPACE DC-1 | Colocation | Operational | — | — | Mevspace sp. z o.o. · Site owner |
| Korbank Data Center | Colocation | Operational | — | — | Korbank S. A. · Site owner |
| DCENTER.PL - FT21 | Colocation | Operational | — | — | DCENTER.PL · PeeringDB listing holder |
| PIAST-AI Factory | HPC Center | Under construction | — | 450 | — |
Corporate traceability
Corporate traceability of organizations linked to facilities in Poland, weighted by operating power capacity. Announced and under-construction figures are not counted here.
- Tier 1
- —No operating figure across 5 facilities · company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- Tier 2
- —No operating figure across 2 facilities · parent linked through licensed ownership data
- Tier 3
- 0.0%No facilities · parent linked through other sources
- Tier 4
- 100.0%2 MW operating across 4 of 33 facilities · company identified; parent unrecorded
- Data Gap
- —No operating figure across 7 facilities · no company linked
Facilities by ownership tier
Open a facility for its ownership relationships and sources.
- Tier 4Wroclaw Centre for Networking and Supercomputing LemWroclaw Tech Wroc Aw University Of Science And TechnologyCompany identified; parent unrecorded<1 MWview →
- Tier 4Helios (Cyfronet AGH)Academic Computer Centre Cyfronet AGHCompany identified; parent unrecorded—view →
- Tier 4Centrum Przetwarzania Danych T‑Mobile PolskaT Mobile PolskaCompany identified; parent unrecorded—view →
- Tier 4Orange Polska / Warsaw św. Barbary 10Orange Polska Spolka AkcyjnaCompany identified; parent unrecorded—view →
- Tier 4Orange Polska // WarszawaOrange Polska Spolka AkcyjnaCompany identified; parent unrecorded—view →
- Tier 2ATMAN Data Center Warsaw-2 (WAW-2, Konstruktorska 5)Atman sp. z o.o.Parent linked through licensed ownership data—view →
- Tier 2ATMAN Data Center Warsaw-1 (WAW-1, Grochowska 21A)Atman sp. z o.o.Parent linked through licensed ownership data—view →
- Tier 4LIM WarsawLIM CENTER Spółka z ograniczoną odpowiedzialnościąCompany identified; parent unrecorded—view →
- Tier 4PIAST-AI FactoryPoznan Supercomputing and Networking CenterCompany identified; parent unrecorded—view →
Ownership tiers over time
Operating-capacity-weighted shares at each recorded snapshot. Dates refer to when the distribution was captured; the underlying ownership evidence can be older.
24 snapshots weighted by operating capacity, from 2026-09-23 to 2026-10-16. 144 earlier snapshots weighted every recorded power figure and are listed under Snapshot values.
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- Tier 2 — parent linked through licensed ownership data
- Tier 3 — parent linked through other sources
- Tier 4 — company identified; parent unrecorded
- Data Gap — no company linked
Snapshot values
Displayed MW are rounded to two decimal places. Operating capacity counts operational records only; a snapshot taken before operating weighting began lists only the figure it recorded, every status summed. Download values (JSON) for the full inputs used to calculate the shares. Consecutive snapshots showing the same figures are listed once, under their first and last dates; the download keeps every date.
2026-04-25 – 2026-05-05 · 10 snapshots
1.79 MW recorded, every status · 43 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 6 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 2 facilities · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 1.79 MW · 28 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 7 facilities · 0.0%
2026-05-06 – 2026-05-16 · 11 snapshots
1.79 MW recorded, every status · 43 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 6 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 2 facilities · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 1.79 MW · 27 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 8 facilities · 0.0%
2026-05-17 – 2026-06-02 · 17 snapshots
1.79 MW recorded, every status · 45 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 6 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 2 facilities · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 1.79 MW · 29 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 8 facilities · 0.0%
2026-06-03 – 2026-07-10 · 32 snapshots
1.79 MW recorded, every status · 44 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 6 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 2 facilities · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 1.79 MW · 28 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 8 facilities · 0.0%
2026-07-11 – 2026-07-18 · 8 snapshots
1.79 MW recorded, every status · 44 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 5 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 2 facilities · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 1.79 MW · 29 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 8 facilities · 0.0%
2026-07-19 – 2026-08-02 · 15 snapshots
1.79 MW recorded, every status · 45 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 5 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 2 facilities · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 1.79 MW · 30 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 8 facilities · 0.0%
2026-08-03 – 2026-08-30 · 28 snapshots
1.79 MW recorded, every status · 47 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 5 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 2 facilities · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 1.79 MW · 32 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 8 facilities · 0.0%
2026-08-31 – 2026-09-22 · 23 snapshots
1.79 MW recorded, every status · 47 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 5 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 2 facilities · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 1.79 MW · 33 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 7 facilities · 0.0%
2026-09-23 – 2026-10-16 · 24 snapshots
1.79 MW operating · 47 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 5 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 2 facilities · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 1.79 MW · 33 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 7 facilities · 0.0%
Sovereign programme
Poland: PIAST-AI Factory (EuroHPC) + PSNC
PSNC leads PIAST-AI with Poznań University of Technology, Adam Mickiewicz University and Nicolaus Copernicus University. A June 2026 account by PSNC staff describes a €100 million investment, with new-infrastructure procurement planned for 2027 and full operation for 2028. Existing PSNC computing platforms already support AI models and services. Poland also participates in the LUMI AI Factory consortium.
Partners: PSNC, Poznan University of Technology, Adam Mickiewicz University, Nicolaus Copernicus University, EuroHPC JU, Polish Ministry of Digital Affairs.
Poland on the sovereign dashboardProgramme stages and funding methodologyAllied coordination gaps for this country
Compare countries by capacity, ownership and programme funding
Capacity over time
No facility operating in Poland today has a capacity timeline; records not yet operating, campus build-out figures and earlier phases of operating clusters are not drawn here.
Organisations headquartered here
Across all industries; multiple identifiers may refer to the same company.
2 companies from 331 organisation records for Poland, listed alphabetically. Market capitalisation is unrecorded for this sample.