- Mare Nostrum 56 MW operating
- AWS Europe
- AZURE Spain Central
Spain
43 of 44 facility records have a location. Circles show power, dark for operating and pale for other recorded figures.
Power on record
Facilities
| Mare Nostrum 5 | Barcelona Supercomputing Center, AI hardware owner | 6 | 4,480 |
|---|---|---|---|
| Adam | |||
| Amazon Data Services Spain S.L.U. | Amazon.com, Inc., Site operator | ||
| AWS Europe (Spain) | Amazon.com, Inc., Cloud region provider | ||
| AZURE Spain Central | Microsoft Corporation, Cloud region provider | ||
| Centre de Processament de Dades IBM | |||
| Centro de Datos Alcalá (Alcalá Data Center) | Telefónica, Site operator | ||
| centro de datos trasbase Negratín | |||
| Centro de Procesamiento de Datos del Gobierno de Cantabria | Gobienro de Cantabria, Site operator | ||
| Centro de Procesamiento de Datos Sur | Banco Santander, Site operator | ||
| Cloud Center Andalucía | |||
| Cogent Madrid | Cogent Communications, PeeringDB listing holder | ||
| CyrusOne Madrid 1 | CyrusOne, PeeringDB listing holder | ||
| Data Center Bilbao Arasur | Merlin Properties, Site operator | ||
| Data Center KIO Murcia | KIO Networks España, Site operator | ||
| Data Center KIO Valencia | KIO Networks España, Site operator | ||
| DATA4 Madrid-Alcobendas - MAD1 | DATA4 s.a r.l, PeeringDB listing holder | ||
| Digital Realty BCN1 - Barcelona | Digital Realty, Site owner | ||
| Digital Realty Madrid MAD1-2 | Digital Realty, PeeringDB listing holder | ||
| Digital Realty Madrid MAD3 | Digital Realty, Site owner | ||
| Equinix BA1 - Barcelona | Equinix, Inc., PeeringDB listing holder | ||
| Equinix BA2 - Barcelona | Equinix, Inc., PeeringDB listing holder | ||
| Equinix MD1 - Madrid | Equinix, Inc., PeeringDB listing holder | ||
| Equinix MD2 - Madrid | Equinix, Inc., PeeringDB listing holder | ||
| Equinix MD5 (Madrid) | Equinix, Inc., Site operator (announced) | ||
| Equinix MD6 | Equinix, Inc., PeeringDB listing holder | ||
| Espanix Datacenter | Asociación ESpanix, PeeringDB listing holder | ||
| GCP Europe Southwest 1 | Google, Cloud region provider | ||
| Global Switch Madrid | Global Switch Holdings Ltd., PeeringDB listing holder | ||
| IaaS Datacenter Madrid | |||
| inforland.com | InforLand.com, Site operator | ||
| IPCore Datacenter Madrid | IPCore Datacenter SL, PeeringDB listing holder | ||
| Iron Mountain Data Center - Madrid (MAD-1) | Iron Mountain Data Centers, Site owner | ||
| Iron Mountain MAD-1 (Madrid) | Iron Mountain, Site operator | ||
| MareNostrum 5 (EuroHPC) | Barcelona Supercomputing Center, Hosting centre | 4,480Held: counted on another record of this site | |
| Mozoilo AJVP | Mozoilo, Site operator | ||
| NIXVAL Datacenter | NIXVAL (Falbox, S.L.), PeeringDB listing holder | ||
| nLighten Madrid MAD1 | nLighten HQ BV, Site owner | ||
| NTT Madrid 1 Data Center (MAD1) | NTT DATA's Global Data Centers division, PeeringDB listing holder | ||
| OCI Spain Central (Madrid 3) | Oracle Corporation, Cloud region provider | ||
| OCI Spain Central (Madrid) | Oracle Corporation, Cloud region provider | ||
| Templus DC Barcelona BCN01 | TEMPLUS DATACENTERS, PeeringDB listing holder | ||
| Templus DC Málaga MAL01 | TEMPLUS DATACENTERS, PeeringDB listing holder | ||
| The Weaver |
Ownership
0% of operating power is traced to a company with an SEC identifier or a linked parent.
Facilities by ownership tier
Open a facility for its ownership relationships and sources.
- Tier 4MareNostrum 5 (EuroHPC)Barcelona Supercomputing CenterCompany identified; parent unrecorded—view →
- Tier 4Centro de Procesamiento de Datos del Gobierno de CantabriaGobienro De CantabriaCompany identified; parent unrecorded—view →
- Tier 4Centro de Datos Alcalá (Alcalá Data Center)Telef NicaCompany identified; parent unrecorded—view →
- Tier 4NTT Madrid 1 Data Center (MAD1)NTT DATA's Global Data Centers divisionCompany identified; parent unrecorded—view →
- Tier 4Iron Mountain Data Center - Madrid (MAD-1)Iron Mountain Data CentersCompany identified; parent unrecorded—view →
Ownership tiers over time
Operating-capacity-weighted shares at each recorded snapshot. Dates are when the distribution was captured; the ownership evidence can be older.
42 snapshots weighted by operating capacity, from 2026-09-23 to 2026-11-03. 144 earlier snapshots weighted every recorded power figure and are listed under Snapshot values.
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- Tier 2 — parent linked through licensed ownership data
- Tier 3 — parent linked through other sources
- Tier 4 — company identified; parent unrecorded
- Data Gap — no company linked
Snapshot values
Displayed MW are rounded to two decimal places. Operating capacity counts operational records only; a snapshot taken before operating weighting began lists only the figure it recorded, every status summed. Download values (JSON) for the full inputs used to calculate the shares. Consecutive snapshots showing the same figures are listed once, under their first and last dates; the download keeps every date.
2026-04-25 – 2026-05-05 · 10 snapshots
14 MW recorded, every status · 41 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 17 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 1 facility · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 14 MW · 18 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 5 facilities · 0.0%
2026-05-06 – 2026-05-16 · 11 snapshots
14 MW recorded, every status · 41 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 17 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 1 facility · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 14 MW · 17 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 6 facilities · 0.0%
2026-05-17
14 MW recorded, every status · 42 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 17 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 1 facility · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 14 MW · 18 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 6 facilities · 0.0%
2026-05-18 – 2026-05-19 · 2 snapshots
14 MW recorded, every status · 44 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 19 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 1 facility · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 14 MW · 18 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 6 facilities · 0.0%
2026-05-20 – 2026-06-02 · 14 snapshots
93 MW recorded, every status · 46 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 79 MW · 21 facilities · 84.9%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 1 facility · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 14 MW · 18 facilities · 15.1%
- Data Gap — no company linked
- 0 MW · 6 facilities · 0.0%
2026-06-03 – 2026-08-15 · 68 snapshots
6 MW recorded, every status · 43 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 19 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 1 facility · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 6 MW · 17 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 6 facilities · 0.0%
2026-08-16 – 2026-09-22 · 38 snapshots
6 MW recorded, every status · 43 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 18 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 1 facility · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 6 MW · 18 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 6 facilities · 0.0%
2026-09-23 – 2026-10-18 · 26 snapshots
6 MW operating · 43 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 18 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 1 facility · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 6 MW · 18 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 6 facilities · 0.0%
2026-10-19 – 2026-11-03 · 16 snapshots
6 MW operating · 44 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 19 facilities · 0.0%
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 1 facility · 0.0%
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · 0.0%
- Tier 4 — company identified; parent unrecorded
- 6 MW · 18 facilities · 100.0%
- Data Gap — no company linked
- 0 MW · 6 facilities · 0.0%
Sovereign programme
BSC AI Factory + MareNostrum 5 + AI Strategy 2024
BSC provides research and industry access to MareNostrum 5; its accelerated partition has 4,480 NVIDIA H100 GPUs. The BSC AI Factory has offered computing access and technical support since April 2025. ALIA uses MareNostrum 5 to train public language models for Spanish and its co-official languages. A €129M upgrade contract signed in January 2026 covers additional AI capacity.
Partners: BSC-CNS, EuroHPC JU, Spanish Government, Catalan Government, FSAS Technologies, Telefonica, Fujitsu.
Export controls
3 Entity List designations against organisations located here.
Organisations
All 3 organisations
| Galicia Supercomputing Center | ||
|---|---|---|
| Seidor | ||
| Telefonica |
Related pages
Sources
4 sources
- Epoch AI frontier data centers and GPU clusters: https://epoch.ai/data/data-centers
- Export-control rules (US EAR, Dutch and Japanese regimes): https://scrutica.com/export-controls/countries
- BIS Entity List via the Consolidated Screening List and the Federal Register: https://www.federalregister.gov/
- Sovereign AI programme register: https://scrutica.com/sovereign-ai
How the figures were made
Geography. Outlines use Natural Earth de facto boundaries. Distant parts may be omitted; located records outside the drawing are counted in its caption. Power circles use the same scale across countries.
Counts. Counts retrieved 3 Nov 2026. Operating capacity and ownership shares include estimated capacity; a campus figure recorded as its full build-out, earlier phases and second records are shown apart rather than counted. Sovereign programme ratios use government-only announced amounts where available; each ratio lists its numerator and denominator.
Corporate traceability. No company linked means no operator, site owner or hardware owner has been linked to the facility. The tiers do not verify property ownership or facility operation. Announced and under-construction figures are not counted here. Tiers classify the available sources for a company linked to each facility. A linked company’s SEC identifier can qualify it for the first tier without establishing a parent. Ownership relationships and their sources are listed on the facility and company pages.
Organisations headquartered here. Across all industries; multiple identifiers may refer to the same company. The record lists 3 distinct organisations with qualifying market-capitalisation or linked-record evidence, after reviewing all public organisation rows for Spain; the source holds 554 organisation rows, including duplicate identities and rows without qualifying evidence, and the company register applies its own evidence scope. A type is shown only where the classification has been reviewed.
Corrections to this page, 4
- Operating totals counted ten machines more than once, 1 Nov 2026
- Sovereign AI: Spain’s government funding was shown as absent beside its own government-funded component, 25 Sep 2026
- Facility class: country pages printed a class the record withholds, 25 Sep 2026
- Capacity totals: planned capacity counted as present capacity, 23 Sep 2026
Identifiers
- ISO country code
- ES

