Capacity, hardware inventory, ownership chain, and supply-chain position for ORNL Frontier (Exascale HPC). Any export-control exposure is walked through the canonical organization graph — surfacing when the BIS Entity List touches a node above the facility in the chain — rather than asserted at the facility row.
As of 2026-07-27
Description
DOE exascale supercomputer at Oak Ridge National Laboratory. 37,888 AMD Instinct MI250X GPUs. 1.194 EFLOPS Rmax (FP64) on LINPACK.
Timeline
Operational
May 30, 2022
Notes
22.7 MW measured power. #1 on Top500 (June 2022). HPE Cray EX235a nodes.