Not yet available
Power capacity, hardware inventory, upstream suppliers, and downstream customers for the row owned by ; any BIS Entity List exposure is walked through the canonical org graph rather than asserted at the facility row.
Capacity, ownership chain, and supply-chain position for Abu Dhabi UAE/USA 5GW Campus Phase 2, including any export-control exposure that surfaces when the BIS Entity List touches a node above the facility in the chain.
As of 2026-06-12
Notes
FLOP/s is a very rough estimate based on stated power capacity and the completion year
flop_value_units_anomaly — Stored peak_pflops_fp16 = 20100000 (= 20.1 ZFLOPS) with total_gpu_count IS NULL. CSV value is a "rough estimate based on stated power capacity" with no underlying GPU inventory; ZFLOPS-scale figure is unphysical relative to any plausible chip-count derivation. Per DQP §5 ("set values to NULL rather than guess"), value was nulled in wave-13 (migration 20260619000000) and closure is logged here.AZURE UAE Central
Abu Dhabi, AE