Skip to main content

AWS Project Rainier (New Carlisle, IN)

TypeAI TrainingStatusOperationalWhereNew Carlisle, Indiana, USIndexed fromPress reporting

Operational; Amazon.com, Inc. is recorded as an operator of this site

AWS's $11B Project Rainier data center campus on 1,200 acres near New Carlisle, Indiana. 30 buildings planned, each 200K+ sq ft, consuming 2.2 GW total at full build-out. Became fully operational Oct 2025 and is powering Anthropic's AI model training. Part of Amazon's broader $15B+ Northern Indiana investment.

Source: Press reporting

1/3site roles identified0 site relationships1 finding in the company chain0 export-control designationsFurthest finding: company at site

Dates in site records: Jan 1, 2024 – Oct 29, 2025. Site data: Press reporting.

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · data to Oct 29, 2025 (derived)

Site operator · per third-party report

Amazon.com, Inc. parent ownership unresolved 1 finding

Which organisation runs it?

AWS Project Rainier (New Carlisle, IN)Site

Site operator · per third-party report Amazon.com, Inc. “Amazon has opened a data center on 1,200 acres of land in Indiana that's dedicated to training and running models from Anthropic.” source

Recorded owner attribution withheld Amazon.com, Inc. The cited source does not establish that this organisation holds title to the site. “Amazon has opened a data center on 1,200 acres of land in Indiana that's dedicated to training and running models from Anthropic.” source

Companies are grouped by their role at the site, with recorded parents above them. No parent companies were found in the ownership data. Further ownership remains unresolved where labelled. Record source: Press reporting; authority tier 3. Each role is drawn only as the relationship its own source establishes, listed above; none implies exclusive control of the full site. Ticks count the export-control and government-link findings for each company.

Export controls and government links

No export-control designations were found in the checked company chains.

Plate III. Export controls and government linksscrutica.com · data to Oct 29, 2025 (derived)
site1A company in the ownership chain is headquartered in the United Statescompany levels
Company at site

Headquarters jurisdiction
A company in the ownership chain is headquartered in the United States

United States: Operates the Export Administration Regulations (EAR) and the BIS Entity List under 15 CFR 730–774; deemed-export rules extend reach to foreign nationals on US soil. Export-control regimes listed for this jurisdiction: Wassenaar Arrangement, US EAR (BIS Entity List authority).

Country is the recorded headquarters location.Linked through the company recorded as operating this site.

Triangle: export-control designation or regulatory flag. Square: sovereign capital linkage. Circle: headquarters jurisdiction. Level 1 is a company at the site; higher levels are its parents. 1 finding is recorded; 0 are export-control designations.

Capacity

Reading. Power and acceleratorsscrutica.com · data to Oct 29, 2025 (derived)
2.2 GW

Facility power

Estimated. Not operating capacity: campus build-out figure on an operating site.

not recorded

Power for IT equipment

not recorded

Accelerators

New Carlisle (AWS Project Rainier / Anthropic) has 3 records, and their power figures are never added together. Across the platform, recorded totals count the marked figure once; operating totals count a member’s figure only if it is operating capacity.

Scope: full build-out · Status: operational · counted in recorded totals

AWS Project Rainier (New Carlisle, IN)

2.2 GW · not operating capacity · Press reporting

Scope: current deployment · Status: operational

Anthropic-Amazon New Carlisle

1.2 GW · operating capacity · Epoch AI Frontier Data Centers

Scope: named cluster · Status: announced

Project Rainier

350 MW · not operating capacity · Epoch AI GPU Clusters

Methods and sources

Ownership roles

Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility.

Each role requires its own attribution. An operator named in a source supplies evidence of operation only.

Parent companies

Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented.

Level 1 identifies a company at the site, level 2 its parent, and each further level another parent. Export-control designations and government investments are assigned to the company concerned.

Missing values

Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits

Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld.

Curator’s note on this campus

Three records describe the New Carlisle campus at different stages and scopes. Recorded totals use the 2,200 MW full-build-out figure from the October 2025 CNBC/Amazon reporting, which describes the planned 30-building campus rather than the plant running today. Operating totals use Epoch’s current-deployment estimate instead; CNBC reported seven buildings online. The Project Rainier cluster’s 350 MW figure remains visible for comparison but is excluded from both totals. The cluster record also reports 400,000 accelerators.

Browse the facilities directory or search the company directory.