Skip to main content
Scrutica

Belarus

Exports of EAR-controlled items on the Commerce Control List generally face a policy of denial (15 CFR 746.8).

The facility record has a location.

Facilities

By name. 0 of 1 records have capacity data or a site description, 0% here against 17.2% globally and 12.3% in the median country.
Facility records in this country
РЦАД beCloud

Ownership

How far the companies linked to facilities here can be traced, weighted by operating power.

No operating power is on record, so no tier has a share of it.

SEC identifier or a linked parent
Parent in licensed ownership data
Parent in other sources
Company identified, parent unrecorded
No company linked1 facility
Facilities by ownership tier

Open a facility for its ownership relationships and sources.

Tier
Facility
Company
Capacity
Chain
Detail
  1. Data GapРЦАД beCloud—No operator, site owner or hardware owner linked—view →
Ownership tiers over time

Operating-capacity-weighted shares at each recorded snapshot. Dates are when the distribution was captured; the ownership evidence can be older.

42 snapshots weighted by operating capacity, from 2026-09-23 to 2026-11-03. 143 earlier snapshots weighted every recorded power figure and are listed under Snapshot values.

All 42 record 0 MW operating, so no tier has a share to plot.

Snapshot values

Displayed MW are rounded to two decimal places. Operating capacity counts operational records only; a snapshot taken before operating weighting began lists only the figure it recorded, every status summed. Download values (JSON) for the full inputs used to calculate the shares. Consecutive snapshots showing the same figures are listed once, under their first and last dates; the download keeps every date.

2026-04-27 – 2026-05-05 · 9 snapshots

0 MW recorded, every status · 1 facility

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
0 MW · 0 facilities · —
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · —
Tier 3 — parent linked through other sources
0 MW · 0 facilities · —
Tier 4 — company identified; parent unrecorded
0 MW · 1 facility · —
Data Gap — no company linked
0 MW · 0 facilities · —

2026-05-06 – 2026-09-22 · 134 snapshots

0 MW recorded, every status · 1 facility

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
0 MW · 0 facilities · —
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · —
Tier 3 — parent linked through other sources
0 MW · 0 facilities · —
Tier 4 — company identified; parent unrecorded
0 MW · 0 facilities · —
Data Gap — no company linked
0 MW · 1 facility · —

2026-09-23 – 2026-11-03 · 42 snapshots

0 MW operating · 1 facility

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
0 MW · 0 facilities · —
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · —
Tier 3 — parent linked through other sources
0 MW · 0 facilities · —
Tier 4 — company identified; parent unrecorded
0 MW · 0 facilities · —
Data Gap — no company linked
0 MW · 1 facility · —

Export controls

A curated summary of country-level restrictions and selected chip statuses, from country-group membership and licensing policy, reviewed 17 Jul 2026.

35 Entity List designations against organisations located here.

The rules retain specified case-by-case review pathways and narrow license exceptions.

RestrictedH100B200
Chip-specific conditions and sources
H100
Embargoed
B200
Embargoed

EAR 746.8 requires licenses for items subject to the EAR and listed on the Commerce Control List. Paragraph (b) provides the review policy, including specified case-by-case purposes and recipients; paragraph (c) lists narrow exceptions.

Access routes and alternatives
Third party
This profile records no verified AI-accelerator transfer through Russian or Chinese intermediaries.

Sources: Russia and Belarus licensing requirements and review policies.

Sources

Sources are matched by ISO country code; operating capacity and ownership shares count operational records only, from the same facility rollup.
4 sources
Data
How the figures were made

Geography. Outlines use Natural Earth de facto boundaries. Distant parts may be omitted; located records outside the drawing are counted in its caption. Power circles use the same scale across countries.

Counts. Counts retrieved 3 Nov 2026. Operating capacity and ownership shares include estimated capacity; a campus figure recorded as its full build-out, earlier phases and second records are shown apart rather than counted. Sovereign programme ratios use government-only announced amounts where available; each ratio lists its numerator and denominator.

Corporate traceability. No company linked means no operator, site owner or hardware owner has been linked to the facility. The tiers do not verify property ownership or facility operation. Announced and under-construction figures are not counted here. Tiers classify the available sources for a company linked to each facility. A linked company’s SEC identifier can qualify it for the first tier without establishing a parent. Ownership relationships and their sources are listed on the facility and company pages.

Export-control posture. Recipient and end-use conditions can change the outcome of a transaction. Classification review: 17 Jul 2026. Access basis: 0.00. The value encodes the embargoed access category. The sources recorded here do not quantify installed AI compute or capacity obtained through intermediaries. Russia and Belarus sanctions, EAR 746.8.

Corrections to this page, 2
Identifiers
ISO country code
BY