TypeHyperscale DCStatusAnnouncedWhereFerrera Erbognone, ITIndexed fromCompany disclosure (press / IR)

Announced; Khazna Data Centers is recorded as the project partner, and no source here establishes who holds or runs the site

Khazna Data Centers / Eni partnership to develop a 500 MW AI data-center campus at Ferrera Erbognone (~45 km from Milan), announced July 2025 (Eni press release). Coordinates are city-level; announcement-stage record.

Source: Company disclosure (press / IR)

0/3site roles identified0 site relationships0 findings in the company chain

Site data: Company disclosure (press / IR).

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · compiled Oct 25, 2026
Khazna–Eni Ferrera Erbognone AI CampusSite

Project partner (announced) Khazna Data Centers. The organisation's own statement states a planned project partnership. “have signed Heads of Terms (“HoT”) to set up a Joint Venture aimed at the development of an “AI Data Center Campus” with a total IT capacity of 500 MW in Ferrera Erbognone, Lombardy.” source

Recorded operator attribution withheld Khazna Data Centers. The cited source does not establish that this organisation operates the site. “have signed Heads of Terms (“HoT”) to set up a Joint Venture aimed at the development of an “AI Data Center Campus” with a total IT capacity of 500 MW in Ferrera Erbognone, Lombardy.” source

Companies are grouped by their role at the site, with recorded parents above them. No company is identified in these roles, so their ownership chains could not be checked.

Export controls and government links

The site’s companies and their recorded parents were checked; no export-control designation, sovereign investment or classified jurisdiction was found. Headquarters country is unrecorded for Khazna Data Centers, leaving its jurisdiction check incomplete.

Capacity

Reading. Power and acceleratorsscrutica.com · compiled Oct 25, 2026
500 MW

Facility power

Source-reported power. Not operating capacity: announced.

not recorded

Power for IT equipment

not recorded

Accelerators

Methods and sources

Ownership roles

Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility.

Each role requires its own attribution. An operator named in a source supplies evidence of operation only.

Parent companies

Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented.

Level 1 identifies a company at the site, level 2 its parent, and each further level another parent. Export-control designations and government investments are assigned to the company concerned.

Missing values

Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits

Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld.

Browse the facilities directory.