STACK Infrastructure NVA02

TypeAI TrainingStatusOperationalWhereManassas, Virginia, USIndexed fromEpoch AI Frontier Data Centers

No organisation is recorded as holding this site, running it, or owning the AI hardware inside it

Description quoted from Epoch AI Frontier Data Centers

Stack Infrastructure NVA02 is a 10-building (6 for AI) data center campus, with a future IT power capacity of 350 MW for AI. Construction began Q4 2019, with their non-AI buildings finishing by Q4 2022. Construction ramped up in 2023, with the first high-density AI data center (containing two independent halls) becoming operational Q4 2024. Their progress indicates a 2028 finish date for the six total AI data centers.

Source: Epoch AI Frontier Data Centers, CC BY 4.0

0/3site roles identified0 site relationships0 findings · no company identified

Date in site records: Feb 14, 2026. Site data: Epoch AI Frontier Data Centers.

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · data to Feb 14, 2026
STACK Infrastructure NVA02Site
Companies are grouped by their role at the site, with recorded parents above them. No company is identified in these roles, so their ownership chains could not be checked.

Export controls and government links

No site owner, operator or hardware owner is identified, so the company checks could not run.

Capacity

Reading. Power and acceleratorsscrutica.com · data to Feb 14, 2026
118 MW

Facility power

Estimated.

85 MW

Power for IT equipment

Estimated.

not recorded

Accelerators

An estimated 61,141 H100-equivalent.

Power comparison

118 MW is at the 87th percentile among the 310 operating AI Training records with a reported power figure. These represent 84% of the 369 operating AI Training records tracked; announced, under-construction and campus build-out figures are not ranked. The scale ends at the largest operating figure in this group, 1,276 MW.

Methods and sources

Ownership roles

Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility.

Each role requires its own attribution. An operator named in a source supplies evidence of operation only.

Parent companies

Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented.

Level 1 identifies a company at the site, level 2 its parent, and each further level another parent. Export-control designations and government investments are assigned to the company concerned.

Missing values

Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits

Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld.

Epoch AI estimates capacity using satellite imagery, permits and corporate disclosures. Its catalog is the source for this site record.

Browse the facilities directory.