Power capacity, hardware inventory, upstream suppliers, and downstream customers for the row owned by ; any BIS Entity List exposure is walked through the canonical org graph rather than asserted at the facility row.
Capacity, ownership chain, and supply-chain position for STACK Infrastructure NVA02, including any export-control exposure that surfaces when the BIS Entity List touches a node above the facility in the chain.
As of 2026-06-12
Description
Stack Infrastructure NVA02 is a 10-building (6 for AI) data center campus, with a future IT power capacity of 350 MW for AI. Construction began Q4 2019, with their non-AI buildings finishing by Q4 2022. Construction ramped up in 2023, with the first high-density AI data center (containing two independent halls) becoming operational Q4 2024. Their progress indicates a 2028 finish date for the six total AI data centers.
Notes
Total capital cost (2025 USD): $5.17B