Facility-level telemetry including power capacity, hardware deployments, supplier relationships, and downstream dependencies. Linked to with cross-referenced BIS Entity List matches.
Detailed intelligence on STACK Infrastructure NVA02. Tracks operational capacity, ownership structure, and the facility's strategic position within the global AI supply chain, including relevant export control restrictions.
As of 2026-04-27
Description
Stack Infrastructure NVA02 is a 10-building (6 for AI) data center campus, with a future IT power capacity of 350 MW for AI. Construction began Q4 2019, with their non-AI buildings finishing by Q4 2022. Construction ramped up in 2023, with the first high-density AI data center (containing two independent halls) becoming operational Q4 2024. Their progress indicates a 2028 finish date for the six total AI data centers.
Notes
Total capital cost (2025 USD): $5.17B
Nearby Facilities (within 100 km)
Energy Profile
Grid Carbon
269.17 gCO2/kWhCarbon Intensity
269.17 kg CO2/MWhBalancing Authority
PJMNERC Region
SERCeGRID Subregion
SRVCOther Facilities in United States
1623 Farnam facility
Nebraska, United States