Portugal PT

Compute facilities, corporate ownership and chip access in Portugal.

2 of 13 facility records have capacity figures or a description

Facility detail

15.4% with capacity data or a site description

  • 2 with capacity or a description
  • 11 with neither
  • 16.8% globally
  • 12.3% median country (39 with 20+ records)

Power on record, by what it measures

100% is operating plant

  • 40 MW operating
  • 0 MW under construction
  • 0 MW announced
  • 31.6% operating worldwide, licence-withheld records excluded

Facility detail requires a positive power, GPU or FLOP figure, or a site description. Operating plant counts operational records only.

Solid reference lines show the global shares. The dashed line is the median across 39 countries with at least 20 facility records. Data retrieved October 17, 2026.

Infrastructure summary

Facility records
132 have capacity data or a site description
Operating capacity
~40 MWAcross 1 operating record, all estimated
Operating AI accelerators
—No positive accelerator count is recorded.
Entity List designations
1Against organisations located here — see the designations

Facilities

13 of 13 facility records: operating records first, by power, then records under construction, announced or retired. A figure the operating total does not count says why: its status, or a note beside the figure where the site operates. A dash marks an unrecorded figure.

FacilityTypeStatusPowerAcceleratorsOrganisation and role
Start Campus Sines Data CampusAI TrainingOperational40 MW—Nscale · AI hardware owner
Deucalion (EuroHPC)HPC CenterOperational——FCT/CNCA (National Centre for Advanced Computing) · Site operator
NOS Imopolis IIColocationOperational——Nos · Site operator
Datacenter de Riba d'AveColocationOperational———
Centro de Computação Avançada do MinhoClass not statedOperational——Funda O Para A Ci Ncia E Tecnologia · Site operator
MEOClass not statedOperational——Meo · Site operator
Data Center IPTClass not statedOperational———
Start SIN01Class not statedOperational———
Seixal Colocation SiteClass not statedOperational——Tata Communications · Site operator
Data Center Portugal Telecom da CovilhãClass not statedOperational——Portugal Telecom · Site operator
Equinix LS1 - LisbonColocationOperational——Equinix Inc · PeeringDB listing holder
FCCN Lisbon - SE06ColocationOperational——Fundacao para a Ciencia e a Tecnologia, I.P. · PeeringDB listing holder
FCCN Lisbon - SE03ColocationOperational——National Laboratory of Civil Engineering (LNEC) · PeeringDB listing holder

Corporate traceability

Corporate traceability of organizations linked to facilities in Portugal, weighted by operating power capacity. Announced and under-construction figures are not counted here.

Tier 1
—No operating figure across 1 facility · company has an SEC identifier or a parent linked through filing, registry or supply-chain data
Tier 2
0.0%No facilities · parent linked through licensed ownership data
Tier 3
0.0%No facilities · parent linked through other sources
Tier 4
100.0%40 MW operating across 1 of 10 facilities · company identified; parent unrecorded
Data Gap
—No operating figure across 2 facilities · no company linked

Facilities by ownership tier

Open a facility for its ownership relationships and sources.

Tier
Facility
Company
Capacity
Chain
Detail
  1. Tier 4Start Campus Sines Data CampusNscaleCompany identified; parent unrecorded40 MWview →
  2. Tier 4Deucalion (EuroHPC)FCT/CNCA (National Centre for Advanced Computing)Company identified; parent unrecorded—view →
  3. Tier 4NOS Imopolis IINosCompany identified; parent unrecorded—view →
  4. Tier 4Datacenter de Riba d'AveRen NosCompany identified; parent unrecorded—view →
  5. Tier 4Centro de Computação Avançada do MinhoFunda O Para A Ci Ncia E TecnologiaCompany identified; parent unrecorded—view →
  6. Tier 4MEOMeoCompany identified; parent unrecorded—view →
  7. Data GapData Center IPT—No operator, site owner or hardware owner linked—view →
  8. Data GapStart SIN01—No operator, site owner or hardware owner linked—view →
  9. Tier 4Seixal Colocation SiteTata CommunicationsCompany identified; parent unrecorded—view →
  10. Tier 4Data Center Portugal Telecom da CovilhãPortugal TelecomCompany identified; parent unrecorded—view →
  11. Tier 1Equinix LS1 - LisbonEquinix IncCompany has an SEC identifier—view →
  12. Tier 4FCCN Lisbon - SE06Fundacao para a Ciencia e a Tecnologia, I.P.Company identified; parent unrecorded—view →
  13. Tier 4FCCN Lisbon - SE03National Laboratory of Civil Engineering (LNEC)Company identified; parent unrecorded—view →

Ownership tiers over time

Operating-capacity-weighted shares at each recorded snapshot. Dates refer to when the distribution was captured; the underlying ownership evidence can be older.

25 snapshots weighted by operating capacity, from 2026-09-23 to 2026-10-17. 144 earlier snapshots weighted every recorded power figure and are listed under Snapshot values.

Snapshots from 11 July 2026 to 23 September 2026 count Epoch’s records at IT power, which Epoch derives by dividing facility power by a peak PUE of 1.2 or 1.4; the snapshots on either side count facility power. The steps at those dates are that change of basis, not a change in capacity. A dashed line marks the step.

  • Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
  • Tier 2 — parent linked through licensed ownership data
  • Tier 3 — parent linked through other sources
  • Tier 4 — company identified; parent unrecorded
  • Data Gap — no company linked
Snapshot values

Displayed MW are rounded to two decimal places. Operating capacity counts operational records only; a snapshot taken before operating weighting began lists only the figure it recorded, every status summed. Download values (JSON) for the full inputs used to calculate the shares. Consecutive snapshots showing the same figures are listed once, under their first and last dates; the download keeps every date.

2026-04-25 – 2026-04-28 · 3 snapshots

0 MW recorded, every status · 11 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
0 MW · 1 facility · —
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · —
Tier 3 — parent linked through other sources
0 MW · 0 facilities · —
Tier 4 — company identified; parent unrecorded
0 MW · 8 facilities · —
Data Gap — no company linked
0 MW · 2 facilities · —

2026-04-29 – 2026-05-16 · 18 snapshots

2.4 MW recorded, every status · 12 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
2.4 MW · 2 facilities · 100.0%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 0 facilities · 0.0%
Tier 4 — company identified; parent unrecorded
0 MW · 8 facilities · 0.0%
Data Gap — no company linked
0 MW · 2 facilities · 0.0%

2026-05-17 – 2026-05-18 · 2 snapshots

2.4 MW recorded, every status · 13 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
2.4 MW · 2 facilities · 100.0%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 0 facilities · 0.0%
Tier 4 — company identified; parent unrecorded
0 MW · 9 facilities · 0.0%
Data Gap — no company linked
0 MW · 2 facilities · 0.0%

2026-05-19 – 2026-06-02 · 15 snapshots

0 MW recorded, every status · 12 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
0 MW · 1 facility · —
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · —
Tier 3 — parent linked through other sources
0 MW · 0 facilities · —
Tier 4 — company identified; parent unrecorded
0 MW · 9 facilities · —
Data Gap — no company linked
0 MW · 2 facilities · —

2026-06-03 – 2026-06-30 · 22 snapshots

0 MW recorded, every status · 12 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
0 MW · 2 facilities · —
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · —
Tier 3 — parent linked through other sources
0 MW · 0 facilities · —
Tier 4 — company identified; parent unrecorded
0 MW · 8 facilities · —
Data Gap — no company linked
0 MW · 2 facilities · —

2026-07-01 – 2026-07-10 · 10 snapshots

0 MW recorded, every status · 12 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
0 MW · 1 facility · —
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · —
Tier 3 — parent linked through other sources
0 MW · 0 facilities · —
Tier 4 — company identified; parent unrecorded
0 MW · 9 facilities · —
Data Gap — no company linked
0 MW · 2 facilities · —

2026-07-11 – 2026-09-22 · 74 snapshots

33 MW recorded, every status · 13 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
0 MW · 1 facility · 0.0%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 0 facilities · 0.0%
Tier 4 — company identified; parent unrecorded
33 MW · 10 facilities · 100.0%
Data Gap — no company linked
0 MW · 2 facilities · 0.0%

2026-09-23

33 MW operating · 13 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
0 MW · 1 facility · 0.0%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 0 facilities · 0.0%
Tier 4 — company identified; parent unrecorded
33 MW · 10 facilities · 100.0%
Data Gap — no company linked
0 MW · 2 facilities · 0.0%

2026-09-24 – 2026-10-17 · 24 snapshots

40 MW operating · 13 facilities

Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
0 MW · 1 facility · 0.0%
Tier 2 — parent linked through licensed ownership data
0 MW · 0 facilities · 0.0%
Tier 3 — parent linked through other sources
0 MW · 0 facilities · 0.0%
Tier 4 — company identified; parent unrecorded
40 MW · 10 facilities · 100.0%
Data Gap — no company linked
0 MW · 2 facilities · 0.0%

Compare countries by capacity, ownership and programme funding

Capacity over time

Reported power, at each snapshot, of the facilities operating in Portugal today. Records not yet operating, campus build-out figures and earlier phases of operating clusters are not in the line. Changes can reflect new capacity, revised estimates or additional sources.

One historical snapshot, dated 2026-04-03. The dashed extension is a scenario, not operating capacity: the scheduled figures of these same facilities at 1 future construction date, if the schedule lands.

Each point sums the latest available power figure for every facility operating today with a snapshot by that date (1 facility in the latest historical total). These are the timeline’s own readings, which can differ from a facility record’s current figure; the operating capacity stated above sums the records. Amber rings mark totals that include estimates; their tooltips use ~.

Organisations headquartered here

Across all industries; multiple identifiers may refer to the same company.

1 company from 166 organisation records for Portugal, listed alphabetically. Market capitalisation is unrecorded for this sample.

The company register