Nigeria NG
Compute facilities, corporate ownership and chip access in Nigeria.
1 of 8 facility records have capacity figures or a description
Facility detail
12.5% with capacity data or a site description
- 1 with capacity or a description
- 7 with neither
- 16.8% globally
- 12.3% median country (39 with 20+ records)
Power on record, by what it measures
No power figure on record
- 0 MW operating
- 0 MW under construction
- 0 MW announced
- 33.1% operating worldwide, licence-withheld records excluded
Facility detail requires a positive power, GPU or FLOP figure, or a site description. Operating plant counts operational records only.
Solid reference lines show the global shares. The dashed line is the median across 39 countries with at least 20 facility records. Data retrieved October 24, 2026.
Infrastructure summary
- Facility records
- 81 have capacity data or a site description
- Operating capacity
- —No operating record carries a power figure
- Operating AI accelerators
- —No positive accelerator count is recorded.
Facilities
8 of 8 facility records: operating records first, by power, then records under construction, announced or retired. A figure the operating total does not count says why: its status, or a note beside the figure where the site operates. A dash marks an unrecorded figure.
| Facility | Type | Status | Power | Accelerators | Organisation and role |
|---|---|---|---|---|---|
| College Of Natural & Applied Sciences Laboratory Complex | Class not stated | Operational | — | — | Lecturers · Site operator |
| Africa Data Centres, Lagos LOS1, Nigeria | Colocation | Operational | — | — | Africa Data Centres · Site owner |
| OADC LOS1 - Lagos | Colocation | Operational | — | — | Open Access Data Centres · PeeringDB listing holder |
| Digital Realty Lekki (LKK1-2) | Colocation | Operational | — | — | Digital Realty · Site owner |
| Rack Centre Lagos | Colocation | Operational | — | — | Rack Centre Limited · PeeringDB listing holder |
| Equinix LG1/ | Colocation | Operational | — | — | Equinix Inc · PeeringDB listing holder |
| Medallion Abuja | Colocation | Operational | — | — | Digital Realty Lagos · PeeringDB listing holder |
| Digital Realty Lagos (LOS1-2) | Colocation | Operational | — | — | Digital Realty Lagos · PeeringDB listing holder |
Corporate traceability
Corporate traceability of organizations linked to facilities in Nigeria, weighted by operating power capacity. Announced and under-construction figures are not counted here. No operating power capacity is on record for facilities in Nigeria, so no tier has a share of it.
- Tier 1
- —No operating figure across 2 facilities · company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- Tier 2
- —No facilities · parent linked through licensed ownership data
- Tier 3
- —No facilities · parent linked through other sources
- Tier 4
- —No operating figure across 6 facilities · company identified; parent unrecorded
- Data Gap
- —No facilities · no company linked
Facilities by ownership tier
Open a facility for its ownership relationships and sources.
Ownership tiers over time
Operating-capacity-weighted shares at each recorded snapshot. Dates refer to when the distribution was captured; the underlying ownership evidence can be older.
32 snapshots weighted by operating capacity, from 2026-09-23 to 2026-10-24. 144 earlier snapshots weighted every recorded power figure and are listed under Snapshot values.
All 32 record 0 MW operating, so no tier has a share to plot.
Snapshot values
Displayed MW are rounded to two decimal places. Operating capacity counts operational records only; a snapshot taken before operating weighting began lists only the figure it recorded, every status summed. Download values (JSON) for the full inputs used to calculate the shares. Consecutive snapshots showing the same figures are listed once, under their first and last dates; the download keeps every date.
2026-04-25 – 2026-06-02 · 38 snapshots
0 MW recorded, every status · 9 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 3 facilities · —
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 0 facilities · —
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · —
- Tier 4 — company identified; parent unrecorded
- 0 MW · 6 facilities · —
- Data Gap — no company linked
- 0 MW · 0 facilities · —
2026-06-03 – 2026-09-22 · 106 snapshots
0 MW recorded, every status · 8 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 2 facilities · —
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 0 facilities · —
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · —
- Tier 4 — company identified; parent unrecorded
- 0 MW · 6 facilities · —
- Data Gap — no company linked
- 0 MW · 0 facilities · —
2026-09-23 – 2026-10-24 · 32 snapshots
0 MW operating · 8 facilities
- Tier 1 — company has an SEC identifier or a parent linked through filing, registry or supply-chain data
- 0 MW · 2 facilities · —
- Tier 2 — parent linked through licensed ownership data
- 0 MW · 0 facilities · —
- Tier 3 — parent linked through other sources
- 0 MW · 0 facilities · —
- Tier 4 — company identified; parent unrecorded
- 0 MW · 6 facilities · —
- Data Gap — no company linked
- 0 MW · 0 facilities · —
Compare countries by capacity, ownership and programme funding
Capacity over time
No facility operating in Nigeria today has a capacity timeline; records not yet operating, campus build-out figures and earlier phases of operating clusters are not drawn here.

