Capacity, hardware inventory, ownership chain, and supply-chain position for St Lawrence Data and Agricultural Center. Any export-control exposure is walked through the canonical organization graph — surfacing when the BIS Entity List touches a node above the facility in the chain — rather than asserted at the facility row.
As of 2026-07-27
Description
Grid queue discovery: NYISO queue #1213. Applicant: PetaWatt Holdings, Inc.. Classification: possible_dc. Interconnection: Dennison 115kV substation (NM-NG)
Notes
Queue ID: 1213. Gen type: Load. Proposed COD: nan.
nyiso_ercot_grid_queue_id_scheme_merge — Merged duplicate grid-queue facility fac-grid-nyiso-1213 (data_source='scrutica-grid-queue-discovery', a one-time research/discovery pass) into the canonical, actively-refreshed gridstatus-nyiso-1213 (data_source='gridstatus'). Both represent the same NYISO/ERCOT interconnection queue position (exact queue_id match, exact power_capacity_mw match: 200 MW). fac-grid-nyiso-1213's richer applicant/classification/interconnection research was merged into this row's description/notes/source_url before deletion. Audit finding: NYISO + ERCOT grid-queue double-ingestion, 2026-07-10 (6.85% US power_capacity_mw inflation).