Scrutica
Power
H100 Equiv
Supply Chain
Not yet available
Facility-level telemetry including power capacity, hardware deployments, supplier relationships, and downstream dependencies. Linked to with cross-referenced BIS Entity List matches.
Detailed intelligence on Vantage TX1. Tracks operational capacity, ownership structure, and the facility's strategic position within the global AI supply chain, including relevant export control restrictions.
As of 2026-04-27
Description
Vantage’s TX1 campus is one of two known campuses in the San Antonio area. It is comprised of two buildings: Building TX11, which has already finished construction and is operational, and Building TX12, which has just started construction. Power capacity was determined based on capacity reported in construction permitting and supported by estimation from satellite images. Compute capacity was estimated assuming B200s will be used in both. Based on air quality permits for the site, a third buildi
Notes
Total capital cost (2025 USD): $1.22B
Nearby Facilities (within 100 km)
Energy Profile
Grid Carbon
332.87 gCO2/kWhCarbon Intensity
332.87 kg CO2/MWhBalancing Authority
ERCONERC Region
TREeGRID Subregion
ERCTOther Facilities in United States
1623 Farnam facility
Nebraska, United States