Scrutica
Capacity, hardware inventory, ownership chain, and supply-chain position for Stream Phoenix. Any export-control exposure is walked through the canonical organization graph — surfacing when the BIS Entity List touches a node above the facility in the chain — rather than asserted at the facility row.
As of 2026-07-27
Description
Stream is a Phoenix-based 7-building campus, with 6 of its projected buildings set to be AI ready. By 2030, they aim to serve 280 MW (220 MW for AI) of IT power across the campus.
Notes
Total capital cost (2025 USD): $2.42B | Epoch estimation methods: company disclosures.
source_url_contains_claim_verified