Skip to main content

Voltage Park Virginia

TypeAI TrainingStatusAnnouncedWhereUSIndexed fromEpoch AI GPU Clusters

Announced; Voltage Park is recorded as owning the AI hardware inside this site

1/3site roles identified0 site relationships0 findings in the company chain

Site data: Epoch AI GPU Clusters.

Ownership and operation

Plate I. Site owner, operator and hardware ownerscrutica.com · compiled Oct 25, 2026

AI hardware owner · per catalog

Voltage Park parent ownership unresolved

Which organisation owns the AI hardware inside it?

Voltage Park VirginiaSite

AI hardware owner · per catalog Voltage Park. Epoch AI's field for who owns the AI hardware, which it defines as not necessarily the owner or operator of the facility. source

Companies are grouped by their role at the site, with recorded parents above them. No parent companies were found in the ownership data. Further ownership remains unresolved where labelled. Record source: Epoch AI GPU Clusters; authority tier 2. Each role is drawn only as the relationship its own source establishes, listed above; none implies exclusive control of the full site.

Export controls and government links

The site’s companies and their recorded parents were checked; no export-control designation, sovereign investment or classified jurisdiction was found. Headquarters country is unrecorded for Voltage Park, leaving its jurisdiction check incomplete.

Capacity

Reading. Power and acceleratorsscrutica.com · compiled Oct 25, 2026
6 MW

Facility power

Estimated. Not operating capacity: announced.

not recorded

Power for IT equipment

4,088

Accelerators

4,088 H100-equivalent. Not operating capacity: announced.

Present inventory by partition

withheld Facility status is announced, not operational.

  1. 4,088 × NVIDIA H100 SXM5 80GB (estimated)

    status not stated (from the facility status)

    Held: Not present capacity. Part of the inventory has no recognized deployment status.

    Catalogue row; no partition-level source recorded

One partition is held, so no facility figure is derived; the held partition’s count and source remain visible and nothing is substituted for its rate. Rates are the cited dense FP16 figure per accelerator; the sum applies the methodology’s utilization and interconnect assumptions and is a theoretical aggregate, not one job’s throughput. The catalogue figures above are the record’s scalar fields (the source’s transcription, or its recorded correction) and are a different basis.

Power comparison

5.73 MW is not placed among operating AI Training figures (announced).

Methods and sources

Ownership roles

Title identifies the legal owner of the site; operation identifies who runs it. AI-hardware ownership follows the catalog’s attribution of the machines inside, whose owner may lease the facility.

Each role requires its own attribution. An operator named in a source supplies evidence of operation only.

Parent companies

Ownership checks start with each company named at the site and follow recorded parent relationships. A company holding several roles is checked once. Its linked company page lists the relationships and their sources; further parents may remain undocumented.

Level 1 identifies a company at the site, level 2 its parent, and each further level another parent. Export-control designations and government investments are assigned to the company concerned.

Missing values

Unrecorded roles remain blank. Findings whose company position is unresolved stay in the list with that position labelled unknown.

Publication limits

Subscription corporate data helps identify parent relationships and sovereign investments. Publication is limited to relationship classes and supporting public sources; licensed records, identifiers and values are withheld.

Epoch AI estimates capacity using satellite imagery, permits and corporate disclosures. Its catalog is the source for this site record.

Browse the facilities directory or search the company directory.