Scrutica
How much AI compute is buildable in the coming years, and which physical limit binds at each horizon? Three independent supply curves — power availability, chip production, advanced packaging — are projected forward from current baselines; the lowest curve at each quarter is the binding constraint, and it shifts over time as different bottlenecks resolve. Assumptions (PJM approval rate, construction-delay factor, chip-yield improvement, CoWoS capacity growth, GPU density per MW) are adjustable; confidence bounds widen from 30% to 60% over the five-year horizon, with no projection beyond the cited papers’ horizon. Controls aimed at a non-binding constraint won’t reduce supply; controls at the binding one will.