Facility-level telemetry including power capacity, hardware deployments, supplier relationships, and downstream dependencies. Linked to with cross-referenced BIS Entity List matches.
Detailed intelligence on North East Data LLC Data Center. Tracks operational capacity, ownership structure, and the facility's strategic position within the global AI supply chain, including relevant export control restrictions.
As of 2026-04-27
Description
Grid queue discovery: NYISO queue #1741. Applicant: Blockfusion / North East Data LLC. Classification: possible_dc. Interconnection: 230kV lines 77 and 78 (NM-NG)
Timeline
Announced
Aug 29, 2025
Notes
North East Data LLC is confirmed by NYSDEC environmental filings as a joint venture between Blockfusion and North East Data LLC, operating at 5380 Frontier Avenue, Niagara Falls, NY 14304. Global Energy Monitor records the facility as a 50 MW cryptocurrency mining operation. The queue 1741 request for 500 MW represents a 10x expansion from documented current operations. Blockfusion is a crypto mining infrastructure company. The expansion to 500 MW with NYSDEC environmental review (as of October | POSSIBLE new DC discovery. The existing 50 MW operation is confirmed crypto mining. The 500 MW expansion filing is an order-of-magnitude scale jump that is more consistent with AI data center economics (where 500 MW earns >$500M/yr in hosting revenue vs. marginal crypto returns). However, absent a c