Scrutica
Power
Supply Chain
Not yet available
Facility-level telemetry including power capacity, hardware deployments, supplier relationships, and downstream dependencies. Linked to with cross-referenced BIS Entity List matches.
Detailed intelligence on Arsenal Data Site 500. Tracks operational capacity, ownership structure, and the facility's strategic position within the global AI supply chain, including relevant export control restrictions.
As of 2026-04-27
Description
Grid queue discovery: NYISO queue #1729. Applicant: WITHHELD (NYISO). Classification: possible_dc. Interconnection: Haverstock to Adirondak 345kV line HA-1 (NYPA)
Timeline
Announced
Mar 7, 2025
Notes
Second phase of the Arsenal Data Sites campus (see queue 1728). Same date, same applicant, same interconnect. The 'Site 500' designation implies a 500 MW target capacity for this building or phase, with the 233 MW interconnection request representing the grid-side requirement (critical IT load is typically ~50-60% of total power draw). Three simultaneous filings (1728, 1729, 1730) represent coordinated campus planning. | Part of Arsenal Data Sites campus. See queue 1728 for full analysis.
1500 Champa
Denver, CO, United States