As of 2026-06-12
Description
Grid queue discovery: NYISO queue #1728. Applicant: WITHHELD (NYISO). Classification: possible_dc. Interconnection: Haverstock to Adirondak 345kV line HA-1 (NYPA)
Timeline
Announced
Mar 7, 2025
Notes
Three consecutive 'Arsenal Data Site' queue entries (250, 500, 1000) filed on the same date (2025-03-07) by the same applicant, all connecting to the same NYPA HA-1 345kV transmission line in St. Lawrence County. The naming convention ('Site 250,' 'Site 500,' 'Site 1000') refers to the target capacity in MW — suggesting a single campus developer phasing up to 1,000 MW. Combined with queue IDs 1728+1729+1730, total requested capacity is 933 MW. CLASSIFICATION NOTE: Reclassified from genuine_dc to | NEW DISCOVERY — part of Arsenal Data Sites campus. See also 1729 and 1730 entries. The three-phase simultaneous filing strongly suggests a single developer planning a phased campus. NYPA HA-1 is the same 345kV corridor as the active HA-2 line used by queue 1731 (NYS AI DC). The 'Arsenal' name may re