Scrutica
Power
Supply Chain
Not yet available
Facility-level telemetry including power capacity, hardware deployments, supplier relationships, and downstream dependencies. Linked to with cross-referenced BIS Entity List matches.
Detailed intelligence on Arsenal Data Site 250. Tracks operational capacity, ownership structure, and the facility's strategic position within the global AI supply chain, including relevant export control restrictions.
As of 2026-04-27
Description
Grid queue discovery: NYISO queue #1728. Applicant: WITHHELD (NYISO). Classification: possible_dc. Interconnection: Haverstock to Adirondak 345kV line HA-1 (NYPA)
Timeline
Announced
Mar 7, 2025
Notes
Three consecutive 'Arsenal Data Site' queue entries (250, 500, 1000) filed on the same date (2025-03-07) by the same applicant, all connecting to the same NYPA HA-1 345kV transmission line in St. Lawrence County. The naming convention ('Site 250,' 'Site 500,' 'Site 1000') refers to the target capacity in MW — suggesting a single campus developer phasing up to 1,000 MW. Combined with queue IDs 1728+1729+1730, total requested capacity is 933 MW. CLASSIFICATION NOTE: Reclassified from genuine_dc to | NEW DISCOVERY — part of Arsenal Data Sites campus. See also 1729 and 1730 entries. The three-phase simultaneous filing strongly suggests a single developer planning a phased campus. NYPA HA-1 is the same 345kV corridor as the active HA-2 line used by queue 1731 (NYS AI DC). The 'Arsenal' name may re
1500 Champa
Denver, CO, United States